1858 HUNT AVENUE
BRONX · BIN 2043532
💬 Discuss this project
1921Year Built
1Stories
M1Building Class
R5Zoning
2,296 sfGross Floor Area
1Units
0 Active Violations
Church, synagogue, chapel · 9,500 sf lot · 0.24 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHaitian Church of the Good Samarit6p · 2 filings · 17 docs
Floor 1Haitian Church of the Good Samarit5p · 1 filing · 18 docs
CellarHaitian Church of the Good Samarit7p · 1 filing · 18 docs
BasementHaitian Church of the Good Samarit1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Haitian Church of the Good Samarit507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY Building Associates107/10/2025
Adal Engineering110/30/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S R Solar Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
I&E ElectricElectrical603/21/2026
Integrate Comfort SystemGeneral Contractor107/08/2026
Voltaic SolaireGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM Engineering6244107/10/2025
Adal Engineering4205110/30/2024
Building Lifecycle
All (25)Filed (2)Permit Issued (2)Signed Off (1)Violation (5)Special Inspection (15)
12/23/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
X01251769-I1
07/31/2025
Permit issued — Solar
X01251769-I1-SL
07/10/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
X01251769-I1
07/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
07/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
07/07/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
07/07/2025
Special inspection requirement — Final
NARESH MAHANGU
07/07/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
11/08/2024
Permit issued — Mechanical Systems
X01080923-I1-MS
10/30/2024
Filed — Alteration
INSTALLATION OF HVAC SYSTEM AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
X01080923-I1
10/30/2024
Special inspection requirement — Permanent certificate
Dariusz Makara
10/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dariusz Makara
10/30/2024
Special inspection requirement — Heating Systems
Dariusz Makara
10/30/2024
Special inspection requirement — Maintenance information
Dariusz Makara
10/30/2024
Special inspection requirement — HVAC-R and service water heating equipment
Dariusz Makara
10/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Dariusz Makara
10/30/2024
Special inspection requirement — HVAC-R and service water heating system controls
Dariusz Makara
10/29/2024
Special inspection requirement — Energy Code Compliance Inspections
Dariusz Makara
07/15/2024
Special inspection requirement — Final
Dariusz Makara
07/15/2024
Special inspection requirement — Mechanical Systems
Dariusz Makara
01/06/2006
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
02/13/2004
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
03/19/2003
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
03/26/2002
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
08/29/1995
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offVoltaic Solaire07/31/2025
DOB NOWMechanical SystemsPermit IssuedIntegrate Comfort System11/08/2024
BISFBISSUEDMaximum Comb12/29/2005
1 project · most recent 10/30/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/30/2024Permit IssuedIntegrate Comfort SystemHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric PUZ-A42NKA7 42,000 BTU · Condensing Unit ×10
MXZ-SM48NAM2 48,000 BTU · Condensing Unit ×5
MXZ-SM60NAM2 60,000 BTU · Condensing Unit ×5
2 projects · most recent 09/30/2025
General Wiring
FiledStatusContractorScope
09/30/2025CompleteBerger Quality Electrical Con—
07/11/2024CompleteI&E ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
07/07/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
07/07/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
07/07/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
07/07/2025FinalNARESH MAHANGUprogress
07/07/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
10/30/2024Permanent certificateDariusz Makaraenergy_progress
10/30/2024Fire-Resistant Penetrations and JointsDariusz Makaraspecial
10/30/2024Heating SystemsDariusz Makaraspecial
10/30/2024Maintenance informationDariusz Makaraenergy_progress
10/30/2024HVAC-R and service water heating equipmentDariusz Makaraenergy_progress
10/30/2024HVAC-R and service water piping design and insulationDariusz Makaraenergy_progress
10/30/2024HVAC-R and service water heating system controlsDariusz Makaraenergy_progress
10/29/2024Energy Code Compliance InspectionsDariusz Makaraprogress
07/15/2024FinalDariusz Makaraprogress
07/15/2024Mechanical SystemsDariusz Makaraspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Haitian Church of the Good SamaritReligiousCellar, Floor 1, Roof
Project X01251769 Alteration · LOC Issued · 07/10/2025
Project X01080923 Alteration · Permit Entire · 10/30/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/20/2026X01080923-I1Request digital key ↗
08/20/2026X01080923-P1Request digital key ↗
08/19/2026X01251769-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
08/03/2010220074595Open ↗
07/29/2010220074595Open ↗
▸BISWORK PERMIT APPLICATION1
08/07/2010220074595Open ↗
▸Seals & Professional Certifications23
▸DOB NOWProgress Inspector Seal & Signature8
10/15/2026X01251769-I1Open ↗
10/15/2026X01251769-I1Open ↗
09/01/2026X01080923-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
10/15/2026X01251769-I1Open ↗
09/01/2026X01080923-I1Open ↗
09/01/2026X01080923-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
10/05/2012220074595Open ↗
07/29/2010220074595Open ↗
09/30/2010220074595Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/20/2026X01080923-I1Open ↗
08/20/2026X01080923-P1Open ↗
08/13/2026X01251769-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/29/2010220074595Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/29/2010220074595Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/20/2026X01080923-P1Open ↗
08/20/2026X01080923-I1Open ↗
08/13/2026X01251769-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
07/29/2010220074595Open ↗
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/20/2026X01080923-I1Open ↗
08/20/2026X01080923-P1Open ↗
08/13/2026X01251769-I1Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/29/2010220074595Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/05/2012220074595Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01251769-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/05/2012220074595Open ↗
07/29/2010220074595Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
07/29/2010220074595Open ↗