| Firm | Filings | Most Recent |
|---|---|---|
| CHARLES G. MICHEL ENGINEERING, PC. | 2 | 05/01/2025 |
| MARTOS ENGINEERING | 1 | 02/19/2025 |
| THE BROOKLYN STUDIO | 1 | 02/18/2025 |
| Representative | Filings | Most Recent |
|---|---|---|
| J CALLAHAN CONSULTING | 8 | 03/21/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| BIS | OT | ISSUED | PALONE BROTHERS AIR | 06/25/2019 |
| BIS | PL | ISSUED | DONATO, INC | 04/16/2015 |
| BIS | OT | ISSUED | DESIGN TECH CONSTRUCT COR | 03/17/2015 |
| BIS | PL | ISSUED | DONATO, INC | 12/07/2011 |
| BIS | — | ISSUED | DESIGN TECH CONSTRUCT COR | 08/10/2011 |
| BIS | OT | ISSUED | DESIGN TECH CONSTRUCT COR | 07/26/2011 |
| BIS | PL | ISSUED | DONATO, INC | 03/03/2011 |
| BIS | OT | ISSUED | DESIGN TECH CONSTRUCT COR | 02/23/2011 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/01/2025 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric MXZ-SM42NAMHZ2 42,000 BTU · Condensing Unit ×1 PUZ-HA24NHA1-R1 24,000 BTU · Condensing Unit ×1 PUZ-HA30NKA 30,000 BTU · Condensing Unit ×1 PUZ-HA36NKA 36,000 BTU · Condensing Unit ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/01/2025 | — | — | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/10/2026 | Permit Issued | SUNBIRD ELECTRICAL CONTR | General Wiring |
| 08/28/2019 | Complete | BROOKYLN SOLARWORKS, LLC | — |
| 05/23/2019 | Complete | SUNBIRD ELECTRICAL CONTR | HVAC Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/19/2025 | — | — | Steel, Concrete, Masonry, Wood |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 02/14/2025 | Concrete - Cast-In-Place | — | special |
| 01/23/2025 | Structural Wood Frame | — | progress |
| 01/23/2025 | Fenestration air leakage | — | energy_progress |
| 01/23/2025 | Interior lighting power | — | energy_progress |
| 01/23/2025 | Fenestration areas | — | energy_progress |
| 01/23/2025 | Protection of exposed foundation insulation | — | energy_progress |
| 01/23/2025 | Post-installed Anchors | — | special |
| 01/23/2025 | Structural Steel - High Strength Bolting | — | special |
| 01/23/2025 | Structural Steel - Welding | — | special |
| 01/23/2025 | Construction Utilizing CLT or SCL, Type IV | — | special |
| 01/23/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 01/23/2025 | Energy Code Compliance Inspections | — | progress |
| 01/23/2025 | Fire-Resistance Rated Construction | — | progress |
| 01/23/2025 | Air barrier - visual inspection | — | energy_progress |
| 01/23/2025 | Insulation placement and R values | — | energy_progress |
| 01/23/2025 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 01/23/2025 | Metering | — | energy_progress |
| 11/22/2024 | Structural Stability – Alterations of existing buildings | — | special |
| 11/22/2024 | Structural Stability – Alterations of existing buildings | — | special |
| 11/22/2024 | Masonry | — | special |
| 11/22/2024 | Structural Steel - Details | — | special |
| 11/22/2024 | Final | — | progress |
| 11/22/2024 | Final | — | progress |
| 11/22/2024 | Mechanical Systems | — | special |
| 11/22/2024 | Final | — | progress |