← Back
BuildNYC
Two stories - detached, small or mid-size
186 BURGHER AVENUE
STATEN ISLAND · BIN 5049171
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R3XZoning
944 sfGross Floor Area
1Units
6 Active Violations 2 old, status unconfirmed ▸
Two stories - detached, small or mid-size · 6,290 sf lot · 0.15 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 2Under Construction6p · 1 filing · 3 docs
Floor 1Under Construction6p · 1 filing · 3 docs
CellarUnder Construction8p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Yang Engineering211/20/2025
Singh109/08/2021
McCray Architect111/06/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Archhampton403/21/2026
SD Design Studio403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Tower General ConstructionGeneral Contractor104/09/2026
American Standard P&H CororpPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Yang Engineering8376211/20/2025
AR-Tech Engineering6659109/08/2021
Building Lifecycle
04/28/2026
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
S01322156-I1-GC
02/27/2026
Permit issued — Plumbing
S01322156-S1-PL
02/25/2026
Permit issued — General Construction
S01322156-I1-GC
12/26/2025
Objection resolved — Addressed
12/17/2025
Objection resolved — Addressed
29 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAmerican Standard P&H Cororp02/27/2026
DOB NOWGeneral ConstructionPermit IssuedTower General Construction02/25/2026
1 project · most recent 11/20/2025
Water/Sanitary
FiledStatusContractorScope
11/20/2025Permit IssuedAmerican Standard P&HWater/Sanitary
1 project · most recent 02/12/2026
General Wiring
FiledStatusContractorScope
02/12/2026Permit IssuedA.C. Morgan ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
11/20/2025Fire-Resistance Rated ConstructionJian Yangprogress
11/20/2025Exterior Insulation and Finish Systems (EIFS)Jian Yangspecial
11/20/2025Fire-Resistant Penetrations and JointsJian Yangspecial
11/20/2025Structural Stability – Alterations of existing buildingsJian Yangspecial
11/20/2025Concrete - Cast-In-PlaceJian Yangspecial
06/28/2021Exterior Insulation and Finish Systems (EIFS)ALBERTO ROMANspecial
06/28/2021Lighting controlsKevin McCrayenergy_progress
06/28/2021Concrete - Cast-In-PlaceALBERTO ROMANspecial
44 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account