← Back
Office only, 7-19 stories
186 JORALEMON STREET
BROOKLYN · Brooklyn Heights · BIN 3002548
💬 Discuss this project
1922Year Built
12Stories
O3Building Class
C5-2AZoning
79,900 sfGross Floor Area
22Units
LL97 Covered14 Open Violations 9 unresolved · 5 paperwork only ▸FISP: SAFE
Office only, 7-19 stories · Owner of record: JORALEMON ASSOCIATES · 6,512 sf lot · 12.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction59p · 4 filings · 20 docs
Floor 1212p · 1 filing · 20 docs
Floor 111p · 1 filing · 20 docs
Floor 10
Floor 913p · 4 filings · 20 docs
Floor 8
Floor 714p · 4 filings · 20 docs
Floor 611p · 3 filings · 11 docs
Floor 57p · 5 filings · 20 docs
Floor 41p · 1 filing · 7 docs
Floor 3
Floor 214p · 4 filings · 20 docs
Floor 1Under Construction134p · 12 filings · 20 docs
CellarUnder Construction135p · 11 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WEILL CORNELL MEDICAL COLLEGE6309/13/2026
DISTRICT COUNCIL 37507/08/2026
JORALEMON ASSOCIATES1703/22/2026
CELTIC GENERAL CONTRACT I203/22/2026
JORALEMON ASSOCIATES JOSE603/22/2026
BKLYN LAW SCHOOL103/22/2026
J.K & SON CONSTRUCTION103/22/2026
JAVA CONTRACTING103/22/2026
JOSEPH P REALTY103/22/2026
JOSEPH P DY REALTY CORP14103/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS3703/21/2026
METROPOLIS GROUP INC403/21/2026
MUNICIPAL EXPEDITING4203/21/2026
EUROCELT EXPEDITING, INC803/21/2026
NEW YORK ENGINEERING503/21/2026
HIGH POINT PIPING PROTECTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SKANSKA USA BUILDING, INCGeneral Contractor2108/27/2026
WILTON CONSTRUCTION MNGRSGeneral Contractor1307/08/2026
UNIVERSAL BUILD SUPP LLCGeneral Contractor607/14/2026
CURRENT FIRE PROTECTION INCFire Protection607/08/2026
J.M. BOTTO INCPlumbing607/02/2026
ACE-ATLAS PLUMB & HEATINGGeneral Contractor603/21/2026
EL-ROC CONTRACTING OF BKPlumbing507/08/2026
TALISEN CONSTRUCTION CORPGeneral Contractor407/08/2026
EL-ROC CONTG OF BKLYN INCFire Protection407/08/2026
REPUBLIC SCAFFOLD&HOIST CGeneral Contractor407/08/2026
NATIONWIDE MECHANICAL INCPlumbing407/08/2026
CAD SIGNS NYCScaffold407/08/2026
EL-ROC CONTG OF BKLYNPlumbing303/22/2026
INNER CITY ELEC'L CONTR'SElectrical303/22/2026
SCHIMENTI CONSTRUCTION COGeneral Contractor307/08/2026
FRANK LA GREGAElectrical203/21/2026
PSI PARTNERS, LLCFire Protection207/08/2026
ACE-ATLAS PLBING & HTGPlumbing107/08/2026
DANTON PLBG & HTG CORPPlumbing107/08/2026
SUPERIOR AIR SYSTEMS MECHANICALGeneral Contractor107/08/2026
J.A. JENNINGS, INCGeneral Contractor107/08/2026
SHAMROCK MECHANICAL INCFire Protection107/08/2026
LIPSKY & ROSENTHAL, INCPlumbing107/08/2026
ULTIMATE ELECTL CONTG INCElectrical103/22/2026
PAR PLUMBING CO., INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE8432303/29/2026
SE INSPECTIONS7486701/20/2026
NEW YORK ENGINEERING ASSO851502/13/2025
JACK GREEN ASSOCIATES4221412/19/2024
HOWARD L ZIMMERMAN ARCHIT1712107/07/2023
LILKER ASSOCIATES CONSULT816407/06/2023
Building Lifecycle
All (300)Filed (68)Permit Issued (75)Signed Off (21)Facade (FISP) (3)Violation (14)Inspection (48)Objection (41)Special Inspection (30)
08/26/2026
Permit issued — General Construction
B01258071-I1-GC
08/26/2026
Permit issued — General Construction
B00954781-I1-GC
08/26/2026
Permit issued — Mechanical Systems
B00954812-I1-MS
08/26/2026
Permit issued — General Construction
B00858103-I1-GC
08/26/2026
Permit issued — Mechanical Systems
B00856454-I1-MS
08/26/2026
Permit issued — General Construction
B00856273-I1-GC
08/06/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/31/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/30/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/30/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/28/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/13/2026
Permit issued — Construction Fence
B01083709-I1-FN
07/06/2026
Permit issued — Plumbing
B00955787-I1-EW-SP
06/30/2026
Permit issued — Sprinklers
B00955787-I1-PL
06/18/2026
Permit issued — Sprinklers
B01169384-I1-EW-SP
05/28/2026
Permit issued — Sprinklers
B00955787-I1-PL
04/30/2026
Signed off — Alteration
Structural work to accommodate medical offices including new framing on cellar, 1st, 2nd floors for new openings and new equipment; rooftop dunnage for mechanical equipment, support on the exterior for piping and ductwork. All work as per plans.
B00856479-I1
04/27/2026
Objection resolved — Addressed
04/23/2026
Signed off — Alteration
Installation of Sprinkler heads as per plans filed herewith. No change to use, egress or occupancy
B01165234-I1
04/22/2026
Special inspection requirement — Interior lighting power
JOHN MCMONAGLE
04/22/2026
Special inspection requirement — Sprayed fire-resistant materials
JOHN MCMONAGLE
04/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
04/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
04/22/2026
Special inspection requirement — Luminous Exit Path Markings
JOHN MCMONAGLE
04/22/2026
Special inspection requirement — Final
JOHN MCMONAGLE
04/22/2026
Special inspection requirement — Lighting controls
JOHN MCMONAGLE
04/17/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/17/2026
Objection resolved — Resolved
04/16/2026
Objection resolved — Addressed
04/16/2026
Objection resolved — Addressed
04/16/2026
Objection resolved — Addressed
04/16/2026
Special inspection requirement — Fenestration air leakage
JOHN MCMONAGLE
04/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN MCMONAGLE
04/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHN MCMONAGLE
04/16/2026
Special inspection requirement — Fenestration areas
JOHN MCMONAGLE
04/16/2026
Special inspection requirement — Lighting controls
JOHN MCMONAGLE
04/16/2026
Special inspection requirement — Final
JOHN MCMONAGLE
04/16/2026
Special inspection requirement — Exterior lighting power
JOHN MCMONAGLE
04/15/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/15/2026
Objection raised — Scope
04/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
04/13/2026
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
04/13/2026
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
04/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
04/13/2026
Special inspection requirement — Final
JOHN MCMONAGLE
04/13/2026
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
04/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
04/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
04/13/2026
Special inspection requirement — Electrical motors and elevators
JOHN MCMONAGLE
04/06/2026
Objection raised — Scope
04/06/2026
Objection raised — Scope
04/06/2026
Objection raised — Cost
04/06/2026
Objection raised — Scope
04/06/2026
Objection raised — Scope
04/03/2026
Objection resolved — Addressed
04/02/2026
Objection raised — Cost
03/29/2026
Filed — Alteration
Remove the existing storefront system on 1st floor and replace with a new storefront in the same openings.
B00858103-P2
03/27/2026
Filed — Alteration
FIT OUT: Construct new partitions and finishes to existing commercial spaces on cellar and 1st floor as per plans filed herewith. No change to zoning, use, egress, occupancy
B00954781-P1
03/27/2026
Filed — Alteration
Mechanical infrastructure to accommodate medical office space on cellar and 1st floor including new rooftop mechanical equipment, new vent piping and ductwork on the exterior facade, ductwork on cellar and 1st floor.
B00856454-P4
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSKANSKA USA BUILDING, INC08/26/2026
DOB NOWGeneral ConstructionPermit IssuedSKANSKA USA BUILDING, INC08/26/2026
DOB NOWMechanical SystemsPermit IssuedSKANSKA USA BUILDING, INC08/26/2026
DOB NOWGeneral ConstructionPermit IssuedSKANSKA USA BUILDING, INC08/26/2026
DOB NOWMechanical SystemsPermit IssuedSKANSKA USA BUILDING, INC08/26/2026
DOB NOWGeneral ConstructionPermit IssuedSKANSKA USA BUILDING, INC08/26/2026
DOB NOWConstruction FencePermit IssuedUNIVERSAL BUILD SUPP LLC07/13/2026
DOB NOWPlumbingSigned-offCURRENT FIRE PROTECTION INC07/06/2026
DOB NOWSprinklersPermit IssuedJ.M. BOTTO INC06/30/2026
DOB NOWSprinklersPermit IssuedCURRENT FIRE PROTECTION INC06/18/2026
DOB NOWSprinklersPermit IssuedJ.M. BOTTO INC05/28/2026
DOB NOWGeneral ConstructionPermit IssuedSKANSKA USA BUILDING, INC01/29/2026
DOB NOWMechanical SystemsPermit IssuedSKANSKA USA BUILDING, INC01/27/2026
DOB NOWStructuralSigned-offSKANSKA USA BUILDING, INC01/27/2026
DOB NOWMechanical SystemsSigned-offWILTON CONSTRUCTION MNGRS12/15/2025
DOB NOWGeneral ConstructionPermit IssuedSKANSKA USA BUILDING, INC11/14/2025
DOB NOWMechanical SystemsPermit IssuedSKANSKA USA BUILDING, INC11/12/2025
DOB NOWGeneral ConstructionPermit IssuedSKANSKA USA BUILDING, INC11/10/2025
DOB NOWSupported ScaffoldSigned-offUNIVERSAL BUILD SUPP LLC10/22/2025
DOB NOWSignPermit IssuedSIGNS CAD CORP09/24/2025
DOB NOWSignPermit IssuedSIGNS CAD CORP09/23/2025
DOB NOWGeneral ConstructionPermit IssuedSKANSKA USA BUILDING, INC09/17/2025
DOB NOWSprinklersPermit IssuedCURRENT FIRE PROTECTION I08/15/2025
DOB NOWConstruction FencePermit IssuedUNIVERSAL BUILD SUPP LLC07/17/2025
DOB NOWPlumbingPermit IssuedJ.M. BOTTO INC07/10/2025
DOB NOWPlumbingSigned-offCURRENT FIRE PROTECTION I07/07/2025
DOB NOWPlumbingPermit IssuedJ.M. BOTTO INC05/02/2025
DOB NOWSprinklersSigned-offEL-ROC CONTG OF BKLYN INC04/09/2025
DOB NOWPlumbingSigned-offEL-ROC CONTRACTING OF BK04/09/2025
DOB NOWGeneral ConstructionSigned-offWILTON CONSTRUCTION MNGRS04/08/2025
DOB NOWProtection and Mechanical MethodsSigned-offUNIVERSAL BUILD SUPP LLC03/26/2025
DOB NOWSprinklersPermit IssuedJ.M. BOTTO INC02/28/2025
DOB NOWGeneral ConstructionPermit IssuedSKANSKA USA BUILDING, INC02/05/2025
DOB NOWMechanical SystemsPermit IssuedSKANSKA USA BUILDING, INC02/03/2025
DOB NOWStructuralSigned-offS. TIEGER PLBG. CO., INC02/03/2025
DOB NOWSprinklersPermit IssuedCURRENT FIRE PROTECTION I01/30/2025
DOB NOWGeneral ConstructionPermit IssuedSKANSKA USA BUILDING, INC11/20/2024
DOB NOWMechanical SystemsPermit IssuedSKANSKA USA BUILDING, INC11/18/2024
DOB NOWGeneral ConstructionPermit IssuedSKANSKA USA BUILDING, INC11/15/2024
DOB NOWSupported ScaffoldSigned-offUNIVERSAL BUILD SUPP LLC10/15/2024
+ 60 more permits on file
3 projects · most recent 03/27/2026
Associated Ducts and Piping Ventilation Systems Heating Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/27/2026Permit IssuedSKANSKA USA BUILDING, INCAssociated Ducts and Piping, Ventilation Systems—
03/27/2026Permit IssuedSKANSKA USA BUILDING, INCAssociated Ducts and Piping, Heating Systems
Heating
01/20/2026Signed-offWILTON CONSTRUCTION MNGRSAir Conditioning Systems
Cooling
Daikin FTXF12AVJU9 24,000 BTU · Vrf Indoor ×2
FTXF12BVJU9 24,000 BTU · Condensing Unit ×2
5 projects · most recent 01/20/2026
Sprinkler System
FiledStatusContractorScope
01/20/2026Signed-offEL-ROC CONTG OF BKLYN INCSprinkler System
01/30/2025Permit IssuedCURRENT FIRE PROTECTION I—
08/19/2024Permit IssuedCURRENT FIRE PROTECTION I16 heads
12/07/2023Signed-offCURRENT FIRE PROTECTION I—
09/29/2023Signed-offEL-ROC CONTG OF BKLYN INC31 heads
4 projects · most recent 01/20/2026
Water/Sanitary
FiledStatusContractorScope
01/20/2026Signed-offEL-ROC CONTRACTING OF BKWater/Sanitary
12/07/2023Permit IssuedJ.M. BOTTO INCWater/Sanitary
09/29/2023Signed-offEL-ROC CONTRACTING OF BKWater/Sanitary
08/20/2020Signed-offMCLNY PLBG & HEATING LLCWater/Sanitary
11 projects · most recent 09/05/2024
General Wiring
FiledStatusContractorScope
09/05/2024Permit IssuedSTRIANO ELECTRIC CO., INCGeneral Wiring
05/24/2024Permit IssuedINNER CITY ELEC'L CONTR'SGeneral Wiring
07/25/2023Permit IssuedINNER CITY ELEC'L CONTR'SGeneral Wiring
05/22/2022Permit IssuedHYLAN DATACOM & ELECL LLC2 meters, 1 new_meters
06/18/2020Permit IssuedINNER CITY ELEC'L CONTR'SGeneral Wiring
06/18/2020CompleteINNER CITY ELEC'L CONTR'SGeneral Wiring
12/04/2018Permit IssuedINNER CITY ELEC'L CONTR'SGeneral Wiring
12/03/2018Permit IssuedINNER CITY ELEC'L CONTR'S2 meters, 1 new_meters
10/30/2018Permit IssuedULTIMATE ELECTL CONTG INCGeneral Wiring
10/30/2018Permit IssuedULTIMATE ELECTL CONTG INCGeneral Wiring
05/17/2018CompleteNASH ELECTRIC SERVICES IN—
1 project · most recent 07/25/2024
Fence
FiledStatusContractorScope
07/25/2024Permit IssuedUNIVERSAL BUILD SUPP LLCFence
▾Field Inspections (DOB CAP) — 48
DateTypeResultReport
08/06/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/31/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/30/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/30/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/28/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/17/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/15/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/13/2026Fail-Final CND-Occupancy InspectionFailView ↗
01/07/2026Fail-Final CND-Occupancy InspectionFailView ↗
12/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/08/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
11/20/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
11/14/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
11/07/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/05/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/31/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/23/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/20/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/27/2025Pass-Final Boiler Equipment InspectionPassView ↗
01/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/07/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
Latest 25 of 48.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
04/22/2026FinalJOHN MCMONAGLEprogress
04/22/2026Luminous Exit Path MarkingsJOHN MCMONAGLEspecial
04/22/2026Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
04/22/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
04/22/2026Interior lighting powerJOHN MCMONAGLEenergy_progress
04/22/2026Lighting controlsJOHN MCMONAGLEenergy_progress
04/22/2026Sprayed fire-resistant materialsJOHN MCMONAGLEspecial
04/16/2026Fenestration and door U-factor and product ratingsJOHN MCMONAGLEenergy_progress
04/16/2026Structural Stability – Alterations of existing buildingsJOHN MCMONAGLEspecial
04/16/2026FinalJOHN MCMONAGLEprogress
04/16/2026Exterior lighting powerJOHN MCMONAGLEenergy_progress
04/16/2026Lighting controlsJOHN MCMONAGLEenergy_progress
04/16/2026Fenestration air leakageJOHN MCMONAGLEenergy_progress
04/16/2026Fenestration areasJOHN MCMONAGLEenergy_progress
04/13/2026Maintenance informationJOHN MCMONAGLEenergy_progress
04/13/2026Mechanical SystemsJOHN MCMONAGLEspecial
04/13/2026Post-installed AnchorsJOHN MCMONAGLEspecial
04/13/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
04/13/2026FinalJOHN MCMONAGLEprogress
04/13/2026HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
04/13/2026Electrical motors and elevatorsJOHN MCMONAGLEenergy_progress
04/13/2026HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
04/13/2026HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
03/25/2026Lighting controlsJOHN MCMONAGLEenergy_progress
03/25/2026Luminous Exit Path MarkingsJOHN MCMONAGLEspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Weill Cornell MedicineMedical / HealthcareFloor 6
Project B00340743 Alteration · Permit Entire · 04/15/2020
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 1,541 on file (BIS + DOB NOW)
▸Plans & Drawings73
▸DOB NOWPlans/Sketch66
09/03/2026B00047360-I1Request digital key ↗
08/28/2026B08007003-I1Request digital key ↗
08/28/2026B08006424-I1Request digital key ↗
Showing 3 of 66 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026B00340376-I1Request digital key ↗
09/02/2026B00340743-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026B00340377-I1Request digital key ↗
09/02/2026B00340772-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026B00340378-I1Request digital key ↗
09/02/2026B00340751-I1Request digital key ↗
▸Applications & Permits292
▸BISPLAN / WORK APPROVAL APPLICATION118
09/29/2022321740684Open ↗
09/16/2022321069598Open ↗
09/09/2021321972291Open ↗
Showing 3 of 118 on file for this type
▸BISWORK PERMIT APPLICATION111
08/31/2021320701585Open ↗
10/27/2020340777252Open ↗
09/23/2020321975172Open ↗
Showing 3 of 111 on file for this type
▸DOB NOWLPC Approval/Permit57
08/27/2026B00811950-I1Open ↗
Showing 1 of 57 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION6
11/10/2022321740684Open ↗
06/10/2020321975172Open ↗
06/10/2020321975172Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications418
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION145
05/21/2020322083678Open ↗
05/21/2020322083160Open ↗
04/23/2020322083160Open ↗
Showing 3 of 145 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature77
09/03/2026B00047360-I1Open ↗
08/28/2026B08007003-I1Open ↗
08/28/2026B08006424-I1Open ↗
Showing 3 of 77 on file for this type
▸DOB NOWProgress Inspector Seal & Signature60
09/29/2026B00814932-I1Open ↗
09/29/2026B00814932-I1Open ↗
09/28/2026B00856454-P3Open ↗
Showing 3 of 60 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature56
09/29/2026B00814932-I1Open ↗
09/29/2026B00814932-I1Open ↗
09/28/2026B00856454-P3Open ↗
Showing 3 of 56 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST35
04/23/2020322083160Open ↗
04/23/2020322083678Open ↗
02/10/2020322040509Open ↗
Showing 3 of 35 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT25
10/21/2020340777252Open ↗
04/23/2020322083160Open ↗
04/23/2020322083678Open ↗
Showing 3 of 25 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: STATEMENT OF RESPONSIBILITY2
10/21/2020340777252Open ↗
Showing 1 of 2 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/21/2020340777252Open ↗
▸Trade Schedules & Equipment117
▸BISSCHEDULE B - PLUMBING42
07/21/2021320701576Open ↗
07/08/2021320701576Open ↗
07/07/2021321975172Open ↗
Showing 3 of 42 on file for this type
▸BISSELF-CERT PLUMBING NOTICE36
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 36 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE12
11/04/2019321069623Open ↗
10/24/2019321069598Open ↗
09/11/2019321975172Open ↗
Showing 3 of 12 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA10
03/06/2020321069614Open ↗
Showing 1 of 10 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Safety & Tenant Protection9
▸BISTenant Protection Plan and Notes9
04/23/2020322083160Open ↗
04/23/2020322083678Open ↗
11/21/2019322003345Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos123
▸DOB NOWDEP ACP-5: Asbestos Assessment Report63
08/28/2026B08007003-I1Open ↗
08/28/2026B08006424-I1Open ↗
08/28/2026B00803263-I1Open ↗
Showing 3 of 63 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'28
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 28 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)26
10/21/2020340777252Open ↗
04/23/2020322083160Open ↗
04/23/2020322083160Open ↗
Showing 3 of 26 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance54
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS20
11/16/2018321740684Open ↗
Showing 1 of 20 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS15
11/18/2022321740684Open ↗
11/17/2022321740684Open ↗
Showing 2 of 15 on file for this type
▸BISTR8: Energy Code Progress Inspections8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
12/11/2022321740684Open ↗
12/11/2022321740684Open ↗
12/11/2022321740684Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports32
▸BISTECHNICAL REPORT: RESPONSIBILITY28
12/11/2022321740684Open ↗
12/11/2022321740684Open ↗
12/11/2022321740684Open ↗
Showing 3 of 28 on file for this type
▸BISHYDRO FLOW TEST LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
06/10/2020321975172Open ↗
▸Approvals, Objections & Sign-offs187
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST71
12/12/2022321740684Open ↗
11/01/2022322083160Open ↗
11/01/2022322083678Open ↗
Showing 3 of 71 on file for this type
▸BISADMINISTRATIVE OBJECTIONS42
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 42 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION38
11/16/2018321740684Open ↗
Showing 1 of 38 on file for this type
▸BISLANDMARKS APPROVAL22
10/21/2020340777252Open ↗
05/06/2020322083678Open ↗
11/21/2019322003345Open ↗
Showing 3 of 22 on file for this type
▸BISLANDMARKS SIGNOFF8
11/21/2022321740684Open ↗
11/01/2022322083160Open ↗
11/01/2022322083678Open ↗
Showing 3 of 8 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWLandmark Approval2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUPERSEDING LETTER1
11/04/2019321069623Open ↗
▸Cost, Insurance & Ownership135
▸BISCOST AFFIDAVIT135
11/18/2022321740684Open ↗
11/04/2022321740684Open ↗
10/24/2022340777252Open ↗
Showing 3 of 135 on file for this type
▸Filing & Intake Forms71
▸BISEFILING COVER SHEET43
04/23/2020322083160Open ↗
04/23/2020322083678Open ↗
02/14/2020322040509Open ↗
Showing 3 of 43 on file for this type
▸BISADDITIONAL INFORMATION21
11/10/2022321740684Open ↗
11/10/2022321740684Open ↗
11/27/2019321069623Open ↗
Showing 3 of 21 on file for this type
▸BISBOROUGH INTAKE FORM4
08/31/2021320701585Open ↗
05/06/2020322083678Open ↗
08/02/2019320599278Open ↗
Showing 3 of 4 on file for this type
▸BISeFiling Job Application Cover Sheet3
10/21/2020340777252Open ↗
Showing 1 of 3 on file for this type
▸Other Documents30
▸DOB NOWProof of Historic Building27
08/27/2026B00811950-I1Open ↗
Showing 1 of 27 on file for this type
▸BISECCCNYS Analysis3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type