← Back
Three families
1863 OCEAN PARKWAY
BROOKLYN · BIN 3178710
💬 Discuss this project
1920Year Built
2Stories
C0Building Class
R5Zoning
2,600 sfGross Floor Area
3Units
Rent Stabilized18 Open Violations ▸FDNY Report ↗
Three families · Owner of record: 1863 OCEAN PARKWAY LLC · 3,438 sf lot · 0.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof4p · 4 filings · 20 docs
Floor 226p · 4 filings · 20 docs
Floor 122p · 3 filings · 20 docs
Cellar31p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ASTRO CAPITAL GROUP4507/08/2026
J G CONSTRUCTION SRVCS907/08/2026
1863 OCEAN PARKWAY LLC403/22/2026
K R CONSTRUCTION103/22/2026
JILL PROPERTIES LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/07/2021$2.8M—— → —$1,058/sf building
08/09/2017$2.5M—JILL PROPERTIES, LLC → Private party$962/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PDG BUILDING CONSULTANTS LLC LLC1703/21/2026
ARSENAL BUILDING CONSULTANTS LLC203/21/2026
LEVIN ENGINEERING PLLC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
K & R CONSTRUCTION CORPGeneral Contractor1207/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor807/08/2026
DORION NORTON ELECL CONTElectrical103/22/2026
EXPERT PLUMBING & HEATINGPlumbing107/08/2026
NOPHIER PLUMBING & HTG INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LEVIN ENGINEERING PLLC1267501/05/2026
SHAHRISH SHUVO ENGINEERIN8524411/05/2025
Building Lifecycle
All (127)Filed (15)Permit Issued (14)Signed Off (7)Violation (27)Inspection (8)Objection (26)Special Inspection (30)
05/05/2026
Violation issued (HPD, open)
A
01/12/2026
Signed off — Alteration
INSTALLATION OF MECHANICAL SYSTEM FOR ENTIRE ONE FAMILY DWELLING IN CONJUCTION WITH ALT 1 APPLICATION B08025934 . NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00904274-I1
01/06/2026
Special inspection requirement — Maintenance information
Dmitry Levin
01/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
Dmitry Levin
01/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Dmitry Levin
01/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
Dmitry Levin
01/06/2026
Special inspection requirement — Ventilation and air distribution system
Dmitry Levin
01/06/2026
Special inspection requirement — Mechanical Systems
Dmitry Levin
01/06/2026
Special inspection requirement — Final
Dmitry Levin
01/05/2026
Filed — Alteration
INSTALLATION OF MECHANICAL SYSTEM FOR ENTIRE ONE FAMILY DWELLING IN CONJUCTION WITH ALT 1 APPLICATION B08025934 . NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00904274-P1
01/05/2026
Special inspection requirement — Final
Dmitry Levin
01/05/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Dmitry Levin
01/05/2026
Special inspection requirement — Ventilation and air distribution system
Dmitry Levin
01/05/2026
Special inspection requirement — Maintenance information
Dmitry Levin
01/05/2026
Special inspection requirement — HVAC-R and service water heating equipment
Dmitry Levin
01/05/2026
Special inspection requirement — HVAC-R and service water heating system controls
Dmitry Levin
01/05/2026
Special inspection requirement — Mechanical Systems
Dmitry Levin
12/18/2025
Permit issued — Mechanical Systems
B00904274-I1-MS
11/20/2025
Violation issued (HPD, open)
I
11/17/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
11/17/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
11/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
11/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
11/17/2025
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
11/17/2025
Special inspection requirement — Lighting in dwelling units
Shahrish Shuvo
11/05/2025
Filed — Alteration CO
Herewith filed a conversion of a three-family dwelling into a single family dwelling.
B08025934-P3
10/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
10/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
Shahrish Shuvo
10/20/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Shahrish Shuvo
10/20/2025
Special inspection requirement — Lighting in dwelling units
Shahrish Shuvo
10/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Shahrish Shuvo
10/20/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Shahrish Shuvo
09/04/2025
Signed off — Alteration
remove non load bearing partitions and finishes in preparation for future alteration as per plans filed. no change in use egress or occupancy
B00596170-S2
09/04/2025
Signed off — Alteration
remove non load bearing partitions and finishes in preparation for future alteration as per plans filed. no change in use egress or occupancy
B00596170-I1
09/03/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/12/2025
Signed off — Alteration
SCOPE OF WORK- STRUCTURE'S CONVERSION OF EXISTING 3-FAMILY DWELING. ADDITION OF THIRD FLOOR INTO A SINGLE FAMILY DWELLING IN CONJUNCTION WITH ALT 1 APPLICATION B08025934-I1
B01001274-I1
08/01/2025
Signed off — Alteration
INSTALLATION FOR PLUMBING SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH ALT 1 APPLICATION B08025934. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00904340-I1
07/21/2025
Filed — Alteration
INSTALLATION FOR PLUMBING SYSTEM FOR ENTIRE BUILDING IN CONJUNCTION WITH ALT 1 APPLICATION B08025934. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00904340-P2
07/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
Dmitry Levin
07/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Dmitry Levin
07/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
Dmitry Levin
07/21/2025
Special inspection requirement — Maintenance information
Dmitry Levin
06/20/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/10/2025
Violation issued (HPD, open)
A
03/19/2025
Signed off — Alteration
install temporary construction fence as per plans filed. no change in use egress or occupancy
B00918084-I1
03/11/2025
Filed — Alteration CO
Herewith filed a conversion of a three-family dwelling into a single family dwelling.
B08025934-P2
03/10/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/19/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/09/2024
Permit issued — Plumbing
B00904340-I1-PL
12/02/2024
Objection resolved — Addressed
11/27/2024
Violation issued (HPD, open)
I
11/27/2024
Objection resolved — Addressed
11/06/2024
Signed off — Alteration
B00616923-I1
10/30/2024
Objection resolved — Addressed
10/30/2024
Objection resolved — Addressed
10/30/2024
Objection resolved — Addressed
10/30/2024
Objection resolved — Addressed
10/30/2024
Objection resolved — Addressed
10/29/2024
Objection raised — Zoning
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offK R CONSTRUCTION12/18/2025
DOB NOWPlumbingSigned-offEXPERT PLUMBING & HEATING12/09/2024
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS10/03/2024
DOB NOWConstruction FenceSigned-offK R CONSTRUCTION08/16/2024
DOB NOWGeneral ConstructionPermit IssuedK R CONSTRUCTION07/08/2024
DOB NOWStructuralSigned-offK R CONSTRUCTION04/19/2024
DOB NOWPlumbingSigned-offNOPHIER PLUMBING & HTG IN02/05/2024
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS11/02/2023
DOB NOWConstruction FenceSigned-offK R CONSTRUCTION08/18/2023
DOB NOWGeneral ConstructionPermit IssuedK R CONSTRUCTION07/05/2023
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS12/01/2022
DOB NOWGeneral ConstructionSigned-offK R CONSTRUCTION06/21/2022
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS12/20/2021
DOB NOWGeneral ConstructionSigned-offK R CONSTRUCTION12/13/2021
1 project · most recent 05/26/2022
Water/Sanitary
FiledStatusContractorScope
05/26/2022——Water/Sanitary
3 projects · most recent 10/30/2025
General Wiring
FiledStatusContractorScope
10/30/2025CompleteACCURATE ELEC'L CORP.General Wiring
10/21/2021CompleteRICHARD NEU—
07/21/2021CompleteDORION NORTON ELECL CONTGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/03/2025Pass-Final General Construction Non-Directive 14PassView ↗
03/10/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/31/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/04/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
01/06/2026Maintenance informationDmitry Levinenergy_progress
01/06/2026HVAC-R and service water heating equipmentDmitry Levinenergy_progress
01/06/2026HVAC-R and service water piping design and insulationDmitry Levinenergy_progress
01/06/2026HVAC-R and service water heating system controlsDmitry Levinenergy_progress
01/06/2026Ventilation and air distribution systemDmitry Levinenergy_progress
01/06/2026Mechanical SystemsDmitry Levinspecial
01/06/2026FinalDmitry Levinprogress
01/05/2026FinalDmitry Levinprogress
01/05/2026HVAC-R and service water piping design and insulationDmitry Levinenergy_progress
01/05/2026Ventilation and air distribution systemDmitry Levinenergy_progress
01/05/2026Maintenance informationDmitry Levinenergy_progress
01/05/2026HVAC-R and service water heating equipmentDmitry Levinenergy_progress
01/05/2026HVAC-R and service water heating system controlsDmitry Levinenergy_progress
01/05/2026Mechanical SystemsDmitry Levinspecial
11/17/2025Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
11/17/2025Structural Stability – Alterations of existing buildingsShahrish Shuvospecial
11/17/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
11/17/2025Fire-Resistance Rated ConstructionShahrish Shuvoprogress
11/17/2025Energy Code Compliance InspectionsShahrish Shuvoprogress
11/17/2025Lighting in dwelling unitsShahrish Shuvoenergy_progress
10/20/2025Fire-Resistant Penetrations and JointsShahrish Shuvospecial
10/20/2025Fire-Resistance Rated ConstructionShahrish Shuvoprogress
10/20/2025Fenestration and door U-factor and product ratingsShahrish Shuvoenergy_progress
10/20/2025Lighting in dwelling unitsShahrish Shuvoenergy_progress
10/20/2025Energy Code Compliance InspectionsShahrish Shuvoprogress
Latest 25 of 36.
▾Documents — 79 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
08/31/2026B00616923-I1Request digital key ↗
08/27/2026B00904274-I1Request digital key ↗
08/27/2026B00904274-P1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
09/02/2025321192767Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026B08025934-I1Open ↗
08/13/2026B08025934-P2Open ↗
08/13/2026B08025934-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026B08025934-I1Open ↗
08/13/2026B08025934-P2Open ↗
08/13/2026B08025934-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B08025934-I1Open ↗
▸Seals & Professional Certifications31
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/01/2026B00596170-I1Open ↗
09/01/2026B00596170-S1Open ↗
09/01/2026B00596170-S2Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/02/2026B00904340-P2Open ↗
08/31/2026B08025934-I1Open ↗
08/31/2026B08025934-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026B00904340-P2Open ↗
08/31/2026B08025934-I1Open ↗
08/30/2026B08025934-P3Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist4
08/13/2026B08025934-P3Open ↗
08/13/2026B08025934-P1Open ↗
08/13/2026B08025934-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/27/2026B00904274-I1Open ↗
08/27/2026B00904274-P1Open ↗
08/27/2026B00904340-P2Open ↗
Showing 3 of 13 on file for this type
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
09/09/2016321192767Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/13/2026B08025934-P2Open ↗
08/13/2026B08025934-P1Open ↗
08/13/2026B08025934-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026B08025934-I1Open ↗