← Back
Three families
187 WASHINGTON PARK
BROOKLYN · BIN 3058434
💬 Discuss this project
1863Year Built
3Stories
C0Building Class
R6BZoning
3,880 sfGross Floor Area
3Units
Three families · Owner of record: 187WP, LLC · 2,000 sf lot · 1.94 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction12p · 1 filing · 20 docs
Floor 3Under Construction9p · 1 filing · 20 docs
Floor 2Under Construction12p · 1 filing · 20 docs
Floor 1Under Construction9p · 1 filing · 20 docs
CellarUnder Construction11p · 1 filing · 20 docs
Sub-BasementUnder Construction9p · 1 filing · 20 docs
1 job · most recent 10/06/2025
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/06/2025Signed-offTAFFERA FINE BUILDING ANDAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric MXZ-SM48NAMHZ2-U1 4 tons · Condensing Unit ×2
Ventilation
Greenheck CSP-A200 75 CFM · Exhaust Fan ×1
CSP-A390-VG 150 CFM · Exhaust Fan ×1
CUE-099-A 600 CFM · Kitchen Exhaust ×1
SP-A70 50 CFM · Exhaust Fan ×1
SP-A90 75 CFM · Exhaust Fan ×1
Aprilaire 8144NC 130 CFM · Erv ×1
Fantech RE 54 150 CFM · Exhaust Fan ×1
1 job · most recent 10/06/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/06/2025Signed-offDYNAMIC BLUE WATER MECHGas, Water/Sanitary
2 jobs · most recent 08/03/2026
General Wiring
FiledStatusContractorScope
08/03/2026CompleteSUPER CHARGED ELEC. INC.General Wiring
10/03/2025CompleteRICHARD NEU—
1 job · most recent 10/06/2025
Steel Concrete Wood
FiledStatusContractorScope
10/06/2025Signed-offDYNAMIC BLUE WATER MECHSteel, Concrete, Wood
Building Lifecycle
All (76)Filed (7)Permit Issued (11)Signed Off (4)Inspection (3)Objection (36)Special Inspection (15)
08/26/2026
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH RENOVATION OF EXISTING 2-FAMILY RESIDENCE. INSTALL PLUMBING FIXTURES AND RELATED PIPING.
B01092742-I1
07/28/2026
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH RENOVATION OF EXISTING 2-FAMILY RESIDENCE. INSTALL PLUMBING FIXTURES AND RELATED PIPING.
B01092742-S3
02/27/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
B01295262-I1
01/14/2026
Permit issued — Plumbing
B01092742-S2-PL
01/08/2026
Permit issued — General Construction
B01092742-I1-GC
01/08/2026
Permit issued — Mechanical Systems
B01092742-S1-MS
01/08/2026
Permit issued — Structural
B01092742-S3-GC-CX
10/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Collins
10/06/2025
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH RENOVATION OF EXISTING 2-FAMILY RESIDENCE. INSTALL PLUMBING FIXTURES AND RELATED PIPING.
B01092742-P1
10/03/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE.LIVE LOAD 300PSF.
B01295262-I1
10/03/2025
Permit issued — Sidewalk Shed
B01295262-I1-SF
10/03/2025
Permit issued — Supported Scaffold
B01295262-I1-SH
10/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Collins
09/19/2025
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01253306-I1
07/18/2025
Permit issued — Supported Scaffold
B01253306-I1-SF
07/17/2025
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01253306-I1
01/07/2025
Permit issued — Foundation
B01092742-S3-GC-CX
01/07/2025
Permit issued — Mechanical Systems
B01092742-S1-MS
01/07/2025
Permit issued — General Construction
B01092742-I1-GC
01/03/2025
Permit issued — Plumbing
B01092742-S2-PL
01/03/2025
Objection resolved — Addressed
01/02/2025
Objection raised — Scope
01/02/2025
Objection resolved — Addressed
01/02/2025
Objection resolved — Addressed
11/15/2024
Objection resolved — Addressed
11/11/2024
Objection resolved — Addressed
10/22/2024
Objection raised — Other
10/21/2024
Objection resolved — Addressed
10/21/2024
Objection resolved — Addressed
10/21/2024
Objection resolved — Addressed
10/21/2024
Objection resolved — Addressed
10/21/2024
Objection resolved — Addressed
10/21/2024
Objection resolved — Addressed
10/21/2024
Objection resolved — Addressed
10/16/2024
Objection raised — Structural
10/16/2024
Objection raised — Admin
10/16/2024
Objection raised — Structural
10/16/2024
Objection raised — Inspections
10/16/2024
Objection raised — Structural
10/16/2024
Objection raised — Structural
10/16/2024
Objection raised — Other
10/16/2024
Objection raised — Structural
10/14/2024
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH RENOVATION OF EXISTING 2-FAMILY RESIDENCE. INSTALL PLUMBING FIXTURES AND RELATED PIPING.
B01092742-S3
10/10/2024
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH RENOVATION OF EXISTING 2-FAMILY RESIDENCE. INSTALL PLUMBING FIXTURES AND RELATED PIPING.
B01092742-S2
10/10/2024
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH RENOVATION OF EXISTING 2-FAMILY RESIDENCE. INSTALL PLUMBING FIXTURES AND RELATED PIPING.
B01092742-S1
10/01/2024
Special inspection requirement — Footing and Foundation
Xianzhang Chen
10/01/2024
Special inspection requirement — Concrete - Cast-In-Place
Xianzhang Chen
10/01/2024
Special inspection requirement — Post-installed Anchors
Xianzhang Chen
10/01/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Xianzhang Chen
10/01/2024
Special inspection requirement — Structural Steel - Welding
Xianzhang Chen
10/01/2024
Special inspection requirement — Final
Xianzhang Chen
10/01/2024
Special inspection requirement — Structural Steel - Details
Xianzhang Chen
10/01/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Xianzhang Chen
09/18/2024
Objection resolved — Addressed
09/18/2024
Objection resolved — Addressed
09/18/2024
Objection resolved — Addressed
09/18/2024
Objection resolved — Addressed
09/18/2024
Objection resolved — Addressed
09/16/2024
Objection resolved — Addressed
Latest 60 of 76 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
187WP2104/09/2026
PLATINUM SERVICES NY604/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/26/2024$7.5M—187 WASHINGTON PARK LLC → 187WP, LLC$1,933/sf building
10/30/2018$3.3M—— → —$851/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
P.A. COLLINS PE310/06/2025
ALWAYS FAST SERVICES CORP110/03/2025
RIGID STRUCTURAL DESIGN, LLC107/17/2025
STRATFORD ENGINEERING110/14/2024
ARCHITECTURE DURUSOY PLLC109/06/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC203/21/2026
ANZALONE ARCHITECTURE1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TAFFERA FINE BUILDING ANDGeneral Contractor804/09/2026
PLATINUM SERVICES NY LLCGeneral Contractor404/09/2026
DYNAMIC BLUE WATER MECHPlumbing207/08/2026
INTERSYSTEMS INSTAL S&SGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
P.A.COLLINS INSPECTIONS P2168310/06/2025
STRATFORD ENGINEERING997110/14/2024
ARCHITECTURE DURUSOY PLLC3117109/06/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSUPER PLUMBERS CORP01/14/2026
DOB NOWGeneral ConstructionSigned-offTAFFERA FINE BUILDING AND01/08/2026
DOB NOWMechanical SystemsPermit IssuedTAFFERA FINE BUILDING AND01/08/2026
DOB NOWStructuralSigned-offTAFFERA FINE BUILDING AND01/08/2026
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC10/03/2025
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC10/03/2025
DOB NOWSupported ScaffoldSigned-offINTERSYSTEMS INSTAL S&S07/18/2025
DOB NOWFoundationSigned-offTAFFERA FINE BUILDING AND01/07/2025
DOB NOWMechanical SystemsPermit IssuedTAFFERA FINE BUILDING AND01/07/2025
DOB NOWGeneral ConstructionSigned-offTAFFERA FINE BUILDING AND01/07/2025
DOB NOWPlumbingSigned-offSUPER PLUMBERS CORP01/03/2025
BISPLISSUEDAMERICAN STANDARD P&H CORORP.02/13/2024
BISPLISSUEDAMC PLBG, HTG & CLNG, INC04/16/2019
BISOTISSUEDBMB BUILDER INC02/27/2019
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/05/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
07/05/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
10/08/2025Fire-Resistant Penetrations and JointsPaul Collinsspecial
10/01/2025Fire-Resistant Penetrations and JointsPaul Collinsspecial
10/01/2024Footing and FoundationXianzhang Chenprogress
10/01/2024Concrete - Cast-In-PlaceXianzhang Chenspecial
10/01/2024Post-installed AnchorsXianzhang Chenspecial
10/01/2024Structural Steel - High Strength BoltingXianzhang Chenspecial
10/01/2024Structural Steel - WeldingXianzhang Chenspecial
10/01/2024FinalXianzhang Chenprogress
10/01/2024Structural Steel - DetailsXianzhang Chenspecial
10/01/2024Structural Stability – Alterations of existing buildingsXianzhang Chenspecial
08/08/2024Mechanical SystemsPaul Collinsspecial
08/08/2024FinalPaul Collinsprogress
08/07/2024Fire-Resistance Rated ConstructionCemre Durusoyprogress
08/07/2024FinalCemre Durusoyprogress
08/07/2024Fire-Resistant Penetrations and JointsCemre Durusoyspecial
▾Documents — 64 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026B01253306-I1Request digital key ↗
08/20/2026B01295262-I1Request digital key ↗
08/20/2026B01092742-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits13
▸DOB NOWLPC Approval/Permit5
08/14/2026B01092742-I1Open ↗
08/13/2026B01092742-S1Open ↗
08/13/2026B01092742-S2Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
02/21/2024321073351Open ↗
04/17/2019321073351Open ↗
02/28/2019321073351Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION3
03/20/2024321073351Open ↗
04/14/2022321073351Open ↗
12/10/2018321073351Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
07/10/2019321073351Open ↗
07/10/2019321073351Open ↗
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026B01253306-I1Open ↗
08/20/2026B01295262-I1Open ↗
08/20/2026B01092742-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/29/2026B01092742-P1Open ↗
08/29/2026B01092742-S3Open ↗
08/27/2026B01092742-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/29/2026B01092742-S3Open ↗
08/27/2026B01092742-S1Open ↗
08/24/2026B01092742-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
03/05/2019321073351Open ↗
12/10/2018321073351Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/10/2018321073351Open ↗
▸BISSCHEDULE B - PLUMBING1
03/20/2024321073351Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
12/10/2018321073351Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/20/2026B01092742-P1Open ↗
08/20/2026B01092742-S2Open ↗
08/20/2026B01092742-S1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
03/05/2019321073351Open ↗
01/30/2019321073351Open ↗
12/10/2018321073351Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/03/2024321073351Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
01/03/2024321073351Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
01/03/2024321073351Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION2
02/21/2024321073351Open ↗
05/16/2022321073351Open ↗
▸BISLANDMARKS SIGNOFF1
11/27/2023321073351Open ↗
▸BISLANDMARKS APPROVAL1
01/30/2019321073351Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/01/2024321073351Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
01/18/2019321073351Open ↗
12/10/2018321073351Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/09/2024321073351Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
05/16/2022321073351Open ↗
08/05/2019321073351Open ↗
▸BISEFILING COVER SHEET1
12/10/2018321073351Open ↗
▸Other Documents1
▸DOB NOWProof of Historic Building1
08/14/2026B01092742-I1Open ↗