| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01423211 ↗ | 111 WADSWORTH AVENUE MANHATTAN | Alteration | Permit Issued | 08/04/2026 | 09/15/2026 | Design SCHNACKEL ENGINEERS Owner THE GEORGE UNITS LLC | Renovation of street level office space (Centene) interior partitions, doors, glazing, finishes and associated fixtures. No change to use, … |
| B01230785 ↗ | 28 MONROE PLACE BROOKLYN | Alteration | Permit Issued | 05/23/2025 | 08/03/2026 | Design Y8 STUDIO ARCHITECTURE, P.C. Filer GAMILL ENGINEERING, PC | Plumbing work in conjunction with job #B01230785-I1. |
| B00982539 ↗ | 24A GARDEN PLACE BROOKLYN | Alteration | Permit Issued | 01/04/2024 | 07/23/2026 | Design Y8 STUDIO ARCHITECTURE, P.C. Filer GAMILL ENGINEERING, PC | PLUMBING WORK IN CONJUNCTION WITH ALTERATION #B00982539-I1. RELOCATE TOILET & LAV, NEW STALL SHOWER AND WASHING MACHINE. |
| B01267948 ↗ | 216 COLUMBIA HEIGHTS BROOKLYN | Alteration | Signed-off | 08/13/2025 | 07/10/2026 | Design RJD ENGINEERING LLC Filer GAMILL ENGINEERING, PC | MINOR PARTITION CHANGES AT REAR OF 3RD FLOOR AND THROUGHOUT 4TH FLOOR OF EXISTING 1-FAMILY DWELLING. NEW AIR HANDLERS AT 2ND, 3RD AND 4TH FL… |
| B01374914 ↗ | 321 CLINTON STREET BROOKLYN | Alteration | Permit Issued | 04/13/2026 | 06/16/2026 | Filer RMBA LLC | Structural work associated with interior renovation. No change to use egress or occupancy. |
| B01374922 ↗ | 321 CLINTON STREET BROOKLYN | Alteration | Permit Issued | 04/16/2026 | 06/16/2026 | Design EP ENGINEERING LLC Filer RMBA LLC | Mechanical work associated with the interior renovation of an existing townhouse. No change to use egress or occupancy. |
| Name | Projects together | Most recent |
|---|---|---|
| BAXT INGUI ARCHITECTS | 10 | 06/23/2026 |
| GAMILL ENGINEERING, P.C | 6 | 10/17/2023 |
| RJD ENGINEERING LLC | 6 | 06/23/2026 |
| Y8 STUDIO ARCHITECTURE, P.C. | 6 | 10/24/2025 |
| D'HUY ENGINEERING, INC. | 5 | 01/31/2025 |
| D'ANTONIO CONSULTING ENGINEERS | 4 | 11/20/2024 |
| GASBARRO STRUCTURAL ENGINEERING | 3 | 03/26/2025 |
| ARCHITECTURE DURUSOY PLLC | 2 | 10/06/2025 |
| GREGORY V. PEROTTO, P.E. | 2 | 07/26/2023 |
| P.A. COLLINS PE | 2 | 10/06/2025 |
| STRATFORD ENGINEERING | 2 | 10/06/2025 |
| AZA ENGINEERING LLC | 1 | 06/03/2026 |
| BECHT ENGINEERING BT, INC. | 1 | 11/01/2023 |
| BELSEY & MAHLA ARCHITECTS | 1 | 04/27/2025 |
| CELIN MUNOZ CONSULTING ENGINEER, PC | 1 | 05/07/2026 |
| CHA CONSULTING INC. | 1 | 07/08/2024 |
| CWB ARCHITECTS | 1 | 12/05/2025 |
| DANIEL FRISCH | 1 | 06/10/2021 |
| DEVANG ARVIND SHAH | 1 | 11/20/2024 |
| DJLU ARCHITECT | 1 | 03/29/2022 |
| EP ENGINEERING LLC | 1 | 04/16/2026 |
| FEINGOLD AND GREGORY ARCH. | 1 | 06/03/2026 |
| GEIGER ENGINEERING, PC | 1 | 06/03/2026 |
| GEO | 1 | 01/31/2025 |
| HOPE DANA | 1 | 02/26/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| DYNAMIC BLUE WATER MECH | 4 | 06/03/2026 |
| DONATO, INC | 3 | 11/20/2024 |
| TRIMWORKS INC | 3 | 11/01/2023 |
| DONATO PLUMBING, INC | 2 | 10/15/2025 |
| MARTIN PLG & HTG INC | 2 | 06/23/2026 |
| CARLYLE CONSTRUCTION CO | 1 | 08/13/2026 |
| FULTON PLBG & HTG CORP | 1 | 08/13/2026 |
| LAURENCE M CAROLAN ENTERP | 1 | 02/26/2024 |
| SPEEDWAY PLUMBING CORP | 1 | 03/26/2025 |
| TIMELINE RENOVATIONS INC | 1 | 02/26/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| ADVANCED MANAGEMENT SERVICES | 3 | 09/22/2023 |
| 187WP LLC | 1 | 10/06/2025 |
| 21 PLACE, LLC | 1 | 05/07/2026 |
| 212 COLUMBIA HEIGHTS LLC | 1 | 07/08/2024 |
| 31 PROSPECT PARK WEST LLC | 1 | 05/15/2023 |
| 321 CLINTON LLC | 1 | 07/26/2023 |
| BK HEIGHTS 210 LLC | 1 | 06/14/2022 |
| LONICERA PARTNERS | 1 | 10/06/2021 |
| NEW CLAY STUDIOS LLC | 1 | 11/03/2025 |
| ONE PIERREPONT STREET CORP. | 1 | 04/27/2025 |
| THE 206 WEST 17TH ST CONDO | 1 | 04/30/2021 |
| THE GEORGE UNITS LLC | 1 | 08/13/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| GAMILL ENGINEERING, PC | 15 | 06/23/2026 |
| J. CALLAHAN CONSULTING, INC. | 4 | 12/05/2025 |
| RMBA LLC | 2 | 04/16/2026 |
| ADAM MAISER | 1 | 07/22/2024 |
| AGOUTI CONSTRUCTION CONSULTING | 1 | 06/10/2021 |
| ANZALONE ARCHITECTURE, PLLC | 1 | 10/06/2025 |
| COMMERCIAL CAPITAL USA INC | 1 | 07/22/2021 |
| CONVERSANO ASSOCIATES, INC. | 1 | 03/20/2025 |
| DEVANG ARVIND SHAH | 1 | 11/20/2024 |
| GREEN LIGHT EXPEDITING LLC | 1 | 08/13/2026 |
| PEROTTO CONSULTING MGT | 1 | 07/26/2023 |
| SPEEDY EXPEDITING INC | 1 | 03/29/2022 |
| STONECORE LLC | 1 | 06/03/2026 |
| WILLIAM VITACCO ASSOCIATES | 1 | 10/06/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01423211 ↗ | 111 WADSWORTH AVENUE MANHATTAN | Alteration | Permit Issued | 08/04/2026 | 09/15/2026 | Design SCHNACKEL ENGINEERS Owner THE GEORGE UNITS LLC | Renovation of street level office space (Centene) interior partitions, doors, glazing, finishes and associated fixtures. No change to use, … |
| B01230785 ↗ | 28 MONROE PLACE BROOKLYN | Alteration | Permit Issued | 05/23/2025 | 08/03/2026 | Design Y8 STUDIO ARCHITECTURE, P.C. Filer GAMILL ENGINEERING, PC | Plumbing work in conjunction with job #B01230785-I1. |
| B00982539 ↗ | 24A GARDEN PLACE BROOKLYN | Alteration | Permit Issued | 01/04/2024 | 07/23/2026 | Design Y8 STUDIO ARCHITECTURE, P.C. Filer GAMILL ENGINEERING, PC | PLUMBING WORK IN CONJUNCTION WITH ALTERATION #B00982539-I1. RELOCATE TOILET & LAV, NEW STALL SHOWER AND WASHING MACHINE. |
| B01267948 ↗ | 216 COLUMBIA HEIGHTS BROOKLYN | Alteration | Signed-off | 08/13/2025 | 07/10/2026 | Design RJD ENGINEERING LLC Filer GAMILL ENGINEERING, PC | MINOR PARTITION CHANGES AT REAR OF 3RD FLOOR AND THROUGHOUT 4TH FLOOR OF EXISTING 1-FAMILY DWELLING. NEW AIR HANDLERS AT 2ND, 3RD AND 4TH FL… |
| B01374914 ↗ | 321 CLINTON STREET BROOKLYN | Alteration | Permit Issued | 04/13/2026 | 06/16/2026 | Filer RMBA LLC | Structural work associated with interior renovation. No change to use egress or occupancy. |
| B01374922 ↗ | 321 CLINTON STREET BROOKLYN | Alteration | Permit Issued | 04/16/2026 | 06/16/2026 | Design EP ENGINEERING LLC Filer RMBA LLC | Mechanical work associated with the interior renovation of an existing townhouse. No change to use egress or occupancy. |
| B01384501 ↗ | 321 CLINTON STREET BROOKLYN | Alteration | Permit Issued | 05/07/2026 | 06/15/2026 | Design RMBA LLC | General construction work associated with the renovation of an existing 4 story townhouse. |
| B01317294 ↗ | 45 WILLOW STREET BROOKLYN | Alteration | Permit Issued | 12/05/2025 | 06/05/2026 | Design CWB ARCHITECTS | INTERIOR RENOVATION TO BASEMENT LEVEL ONLY. NO CHANGE TO USE, OCCUPANCY, OR EGRESS. |
| B01278571 ↗ | 29 PROSPECT PARK WEST BROOKLYN | Alteration | Signed-off | 09/03/2025 | 04/13/2026 | Design Y8 STUDIO ARCHITECTURE, P.C. | RESTORE EXISTING DETACHED GARAGE, (ACCESSORY TO ONE FAMILY DWELLING). REPAIR/REPOINT BRICK AS REQUIRED, REPLACE LINTEL ABOVE GARAGE DOOR OPE… |
| B01246950 ↗ | 28 MIDDAGH STREET BROOKLYN | Alteration | Permit Issued | 06/27/2025 | 01/15/2026 | Design GEIGER ENGINEERING, PC Filer STONECORE LLC | Structural work as per plans. no change in use, egress or occupancy. |
| B01092742 ↗ | 187 WASHINGTON PARK BROOKLYN | Alteration | Permit Issued | 09/06/2024 | 01/14/2026 | Design P.A. COLLINS PE Owner 187WP LLC | STRUCTURAL AND FOUNDATION WORK FILED IN CONJUNCTION WITH RENOVATION TO EX. 2-FAMILY. ENLARGE WINDOW OPENINGS AT REAR FACADE. STRUCTURAL FRAM… |
| B00776893 ↗ | 2 GRACE COURT ALLEY BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 07/28/2022 | 12/16/2025 | Design BAXT INGUI ARCHITECTS Filer GAMILL ENGINEERING, PC | SUPPORT OF EXCAVATION |
| B00802040 ↗ | 2 GRACE COURT ALLEY BROOKLYN | Alteration | Permit Issued | 01/10/2023 | 11/18/2025 | Design RJD ENGINEERING LLC Filer GAMILL ENGINEERING, PC | Installation of HVAC system in conjunction with alteration #B00776893. |
| B01157173 ↗ | 1 PIERREPONT STREET BROOKLYN | Alteration | Permit Issued | 04/27/2025 | 11/18/2025 | Design BELSEY & MAHLA ARCHITECTS | Renovation of existing apartment 3A. No change in use, egress or Occupancy. |
| B01305878 ↗ | 455 DEGRAW STREET BROOKLYN | Alteration | Signed-off | 10/22/2025 | 10/28/2025 | Design RJD ENGINEERING LLC Owner NEW CLAY STUDIOS LLC Filer GAMILL ENGINEERING, PC | FILING FOR THE DIRECT REPLACEMENT OF PACKAGED ROOFTOP AIR CONDITIONER/HEAT PUMP UNITS ORIGINALLY FILED UNDER APPLICATION #B00665079-I1. |
| B01105970 ↗ | 282 HENRY STREET BROOKLYN | Alteration | Signed-off | 09/17/2024 | 10/20/2025 | Design Y8 STUDIO ARCHITECTURE, P.C. Filer GAMILL ENGINEERING, PC | COMBINE APT. 3 AND APT. 4 ON THE FIRST FLOOR AS PER TPPN 3/97. MINOR PARTITION CHANGES AND NEW FINISHES. |
| B00878771 ↗ | 212 COLUMBIA HEIGHTS BROOKLYN | Alteration | Signed-off | 05/25/2023 | 04/02/2025 | Design BAXT INGUI ARCHITECTS Owner 212 COLUMBIA HEIGHTS LLC Filer GAMILL ENGINEERING, PC | STRUCTURAL WORK INCLUDING REINFORCEMENT OF FLOOR AND ROOF FRAMING AND MODIFICATIONS TO THE INTERIOR RELIEVING WALLS AND STRUCTURAL WORK FOR … |
| B00928336 ↗ | 147 CONGRESS STREET BROOKLYN | Alteration | Signed-off | 09/29/2023 | 03/03/2025 | Design RJD ENGINEERING LLC Filer GAMILL ENGINEERING, PC | STRUCTURAL WORK IN CONJUNCTION WITH GEN. CONSTRUCTION FILED UNDER B00928336-I1. EXTERIOR SLAB REPAIR, ENLARGE STAIR OPENING, PARTIAL REMOVA… |
| B00943162 ↗ | 226 DEGRAW STREET BROOKLYN | Alteration | Signed-off | 11/28/2023 | 03/03/2025 | Design SHAPELESS STUDIO Filer ADAM MAISER | RESIDENTIAL RENOVATION OF EXISTING SINGLE-FAMILY TOWNHOUSE. NO CHANGE IN USE OR EGRESS ZONING |
| B01005262 ↗ | 289 CLINTON STREET BROOKLYN | Alteration | Signed-off | 02/22/2024 | 11/21/2024 | Design Y8 STUDIO ARCHITECTURE, P.C. Filer GAMILL ENGINEERING, PC | ONE STORY ENLARGEMENT AT REAR OF BASEMENT IN EXISTING ONE FAMILY DWELLING. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS. |
| B00851211 ↗ | 41 2 PLACE BROOKLYN | Alteration CO | Permit Issued | 04/24/2023 | 11/18/2024 | Design P.A. COLLINS PE | STRUCTURAL / FOUNDATIL FILING |
| B00948508 ↗ | 2 GRACE COURT ALLEY BROOKLYN | Alteration | Signed-off | 10/17/2023 | 11/18/2024 | Design GAMILL ENGINEERING, P.C Filer GAMILL ENGINEERING, PC | PROVIDE 8' HIGH TEMPORARY PLYWOOD CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW #B00776893-I1 |
| B01102256 ↗ | 169 COLUMBIA HEIGHTS BROOKLYN | Alteration | Signed-off | 09/04/2024 | 10/18/2024 | Design BAXT INGUI ARCHITECTS | INTERIOR RENOVATION TO APARTMENT 9B ON THE NINTH FLOOR. MINOR MODIFICATIONS TO NON-STRUCTURAL PARTITIONS. NEW FINISHES AND MILLWORK. |
| B00899662 ↗ | 169 COLUMBIA HEIGHTS BROOKLYN | Alteration | Signed-off | 07/07/2023 | 08/12/2024 | Design BAXT INGUI ARCHITECTS Owner 21 PLACE, LLC Filer GAMILL ENGINEERING, PC | TEMPORARY SHORING DESIGN FOR PROPOSED OPENING IN EXISTING MASONRY WALL AT THE TWELFTH LEVEL STORY. |
| B00867968 ↗ | 1 PIERREPONT STREET BROOKLYN | Alteration | Signed-off | 07/26/2023 | 03/15/2024 | Filer PEROTTO CONSULTING MGT | 8725 - Installation of ac system in apartment 6B. No change in egress, use or occupancy. |
| B08029250 ↗ | 94 PARK PLACE BROOKLYN | Alteration | Signed-off | 10/28/2022 | 03/15/2024 | Design DEVANG ARVIND SHAH Filer DEVANG ARVIND SHAH | REPLACE EXISTING GAS HWV WITH NEW GAS DIRECT VENT HWB. MODIFY EXISTING HOT WATER DISTRIBUTION. MODIFY EXISTING HOT WATER DISTRIBUTION. ADD H… |
| 321592415BIS | 21 STRONG PLACE BROOKLYN | — | ISSUED | 03/31/2022 | 11/20/2023 | — | — |
| B00658521 ↗ | 455 DEGRAW STREET BROOKLYN | Alteration CO | Permit Issued | 01/12/2022 | 11/14/2023 | Design BAXT INGUI ARCHITECTS | VERTICAL ENLARGEMENT OF EXISTING BUILDING, ADDING SECOND FLOOR FOR RESIDENTIAL USE. |
| B00393116 ↗ | 21 STRONG PLACE BROOKLYN | Alteration | Signed-off | 12/09/2020 | 11/08/2023 | Design BECHT ENGINEERING BT, INC. | Installation of new HVAC system for single family house as per Mechanical plans filed herewith. |
| B00723280 ↗ | 1 PIERREPONT STREET BROOKLYN | Alteration | Signed-off | 05/27/2022 | 11/08/2023 | Interior renovation, installation of new partitions, doors, floor and wall finishes. Non-Structural demo, removal and disposal of interior … | |
| B00391850 ↗ | 21 STRONG PLACE BROOKLYN | Alteration | Signed-off | 03/04/2021 | 11/06/2023 | STRUCTURAL WORK PROPOSED IN CONJUNCTION WITH ALT-1 APPLICATION 321592415 | |
| B00517223 ↗ | 21 STRONG PLACE BROOKLYN | Alteration | Signed-off | 05/10/2021 | 11/06/2023 | Design S.M. BERGER ARCHITECTURE PC | FILING FOR TEMPORARY CONSTRUCTION FENCE |
| B00568759 ↗ | 65 PINEAPPLE STREET BROOKLYN | Alteration CO | Permit Issued | 08/19/2021 | 11/06/2023 | Design HOPE DANA | RENOVATION AT CELLAR AND BASEMENT FLOORS OF EXISTING FOUR STORY RESIDENTIAL BUILDING. MINOR PARTITION CHANGES AND FINISH WORK . CHANGE OCCU… |
| B00665079 ↗ | 455 DEGRAW STREET BROOKLYN | Alteration | Signed-off | 03/03/2022 | 11/06/2023 | Design RJD ENGINEERING LLC | MECHANICAL WORK IN CONJUNCTION WITH ALTERATION #B00658521. NEW PACKAGED ROOFTOP UNITS AND SPLIT HEAT PUMP UNITS. |
| B00665432 ↗ | 455 DEGRAW STREET BROOKLYN | Alteration | Signed-off | 03/23/2022 | 11/06/2023 | Design D'HUY ENGINEERING, INC. | STRUCTURAL & FOUNDATION WORK FOR A ONE STORY ADDITION ABOVE THE EXISTING ONE-STORY BUILDING, IN CONJUNCTION WITH ENLARGEMENT/ALTERATION #B00… |
| B00723401 ↗ | 1 PIERREPONT STREET BROOKLYN | Alteration | Signed-off | 05/27/2022 | 11/06/2023 | Herewith filing mechanical application as per plans submitted. No change in use, egress or occupancy. | |
| B00858902 ↗ | 31 PROSPECT PARK WEST BROOKLYN | Alteration | Signed-off | 04/17/2023 | 11/06/2023 | Design Y8 STUDIO ARCHITECTURE, P.C. Filer GAMILL ENGINEERING, PC | STRUCTURAL WORK IN CONJUNCTION WITH GARAGE RENOVATION FILED UNDER JOB #B00858902-I1. INSTALLATION OF NEW DOOR IN EXISTING MASONRY WALL, AND… |
| 340747507BIS | 46 GARDEN PLACE BROOKLYN | — | ISSUED | 08/18/2021 | 11/06/2023 | — | — |
| B00885779 ↗ | 321 CLINTON STREET BROOKLYN | Alteration | Signed-off | 07/26/2023 | 09/14/2023 | Design GREGORY V. PEROTTO, P.E. Owner 321 CLINTON LLC | #8769 - Installation of HVAC system. No change in egress, use, or occupancy. |
| B00481264 ↗ | 46 GARDEN PLACE BROOKLYN | Alteration | Signed-off | 05/03/2021 | 04/20/2023 | Filer GAMILL ENGINEERING, PC | Mechanical work in conjunction with Alteration type-1 #340747507. New a/c system, exhaust fans, ERV as shown on plans. |
| B00779912 ↗ | 2 GRACE COURT ALLEY BROOKLYN | Alteration | Signed-off | 07/29/2022 | 02/17/2023 | Design BAXT INGUI ARCHITECTS | Temporary rooftop mock-up for landmarks visibility study. |
| B00280149 ↗ | 16 GRACE COURT ALLEY BROOKLYN | Alteration | Signed-off | 03/17/2020 | 12/16/2022 | Design RJD ENGINEERING LLC | HEATING,AIR CONDITIONING, AND VENTILATION SYSTEMS IN CONJUNCTION WITH ALT-1 #322012932 |
| B00325198 ↗ | 16 GRACE COURT ALLEY BROOKLYN | Alteration | Signed-off | 03/10/2020 | 11/16/2022 | Design GAMILL ENGINEERING, P.C | 8' HIGH TEMPORARY PLYWOOD CONSTRUCTION FENCE IN CONJUNCTION WITH JOB #322012932. |
| B00269316 ↗ | 16 GRACE COURT ALLEY BROOKLYN | Alteration | Permit Issued | 02/26/2020 | 11/15/2022 | Design D'HUY ENGINEERING, INC. | STRUCTURAL WORK IN CONJUCTION WITH ALT-1 #322012932. |
| B00735211 ↗ | 271 HICKS STREET BROOKLYN | Alteration | Signed-off | 06/14/2022 | 11/15/2022 | Design GREGORY V. PEROTTO, P.E. Owner BK HEIGHTS 210 LLC | Minor interior renovations of existing residence. No change in egress, use, or occupancy. |
| B00740627 ↗ | 145 COLUMBIA HEIGHTS BROOKLYN | Alteration | Signed-off | 06/08/2022 | 11/15/2022 | Design BAXT INGUI ARCHITECTS Filer GAMILL ENGINEERING, PC | RENOVATION OF FIRST FLOOR KITCHEN AS INDICATED ON PLANS. IN CONJUCTION WITH PLUMBING APPLICATION #B00740640. |
| B00787530 ↗ | 16 REMSEN STREET BROOKLYN | Alteration CO | Permit Issued | 09/08/2022 | 11/15/2022 | Design GAMILL ENGINEERING, P.C | MINOR ALTERATION TO CHANGE OCCUPANCY FROM 2 FAMILIES TO 1 FAMILY. NO CHANGE IN BULK. OBTAIN A NEW CERTIFICATE OF OCCUPANCY. |
| B00575739 ↗ | 46 GARDEN PLACE BROOKLYN | Alteration | Signed-off | 08/12/2021 | 11/14/2022 | Design GAMILL ENGINEERING, P.C | TEMPORARY 8' HIGH PLYWOOD CONSTRUCTION FENCE IN CONJUNCTION WITH ALT-1 #340747507. |
| B00643195 ↗ | 43 PIERREPONT STREET BROOKLYN | Alteration | Signed-off | 12/24/2021 | 11/14/2022 | Design DJLU ARCHITECT Filer SPEEDY EXPEDITING INC | Relocating plumbing fixtures in basement apartment. |
| 322012932BIS | 16 GRACE COURT ALLEY BROOKLYN | — | ISSUED | 06/16/2020 | 11/14/2022 | — | — |
| B00502867 ↗ | 82 REMSEN STREET BROOKLYN | Alteration | Signed-off | 06/01/2021 | 08/29/2022 | Design DANIEL FRISCH | Modification of plumbing system on the 3rd floor, as per plans filed herewith. No change in use, egress or occupancy. |
| 321973370BIS | 176 HICKS STREET BROOKLYN | — | ISSUED | 02/16/2021 | 03/14/2022 | — | OT, PL |
| B00186698 ↗ | 15 GARDEN PLACE BROOKLYN | Alteration | Signed-off | 07/02/2019 | 01/26/2022 | Design GAMILL ENGINEERING, P.C | TEMPORARY 8' HIGH PLYWOOD CONSTRUCTION FENCE IN CONJUNCTION WITH ALT-1 #321820133. |
| B00549472 ↗ | 8 OLD FULTON STREET BROOKLYN | Alteration | Permit Issued | 07/22/2021 | 12/14/2021 | Filing in conjunction with Plumbing application B00549491-I1. GC related work for reconfiguration of existing closets and new bathroom finis… | |
| 321068991BIS | 15 GARDEN PLACE BROOKLYN | — | ISSUED | 01/11/2019 | 12/14/2021 | — | OT, PL |
| 321073743BIS | 15 GARDEN PLACE BROOKLYN | — | ISSUED | 01/24/2019 | 12/14/2021 | — | OT |
| 321820133BIS | 15 GARDEN PLACE BROOKLYN | — | ISSUED | 07/19/2019 | 12/14/2021 | — | PL |
| 322030440BIS | 16 GRACE COURT ALLEY BROOKLYN | — | ISSUED | 06/22/2020 | 12/14/2021 | — | OT |
| B00605181 ↗ | 36 REMSEN STREET BROOKLYN | Alteration | Signed-off | 10/06/2021 | 11/12/2021 | Design STUDIO DB ARCHITECTURE DPC Owner LONICERA PARTNERS | REMOVAL OF NON LOAD BEARING INTERIOR WALLS, FIXTURES ANDMILLWORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| 321760028BIS | 1 PIERREPONT STREET BROOKLYN | — | ISSUED | 05/31/2019 | 05/06/2021 | — | MH, OT, PL |
| B00266941 ↗ | 261 HENRY STREET BROOKLYN | Alteration | Signed-off | 11/19/2019 | 04/27/2021 | Design GAMILL ENGINEERING, P.C | TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH ALT-1 #321846865 |
| M00246807 ↗ | 206 WEST 17 STREET MANHATTAN | Alteration | Signed-off | 02/04/2020 | 04/23/2021 | Design JACK GREEN ASSOCIATES | Mechanical work filed in conjunction with apartment#9 renovation as per plans filed herewith. |
| B00482567 ↗ | 47 SIDNEY PLACE BROOKLYN | Alteration | Signed-off | 03/18/2021 | 04/16/2021 | Design BAXT INGUI ARCHITECTS | AT ATTIC LEVEL REMOVE BUILT-IN BENCH, REPLACE SHEETROCK WALLBOARD AS REQUIRED, CREATE SMALL STORAGE CLOSET. NO CHANGE IN USE, OCCUPANCY OR M… |
| 340755748BIS | 261 HENRY STREET BROOKLYN | — | ISSUED | 09/03/2020 | 03/12/2021 | — | OT |
| 321718860BIS | 123 CONGRESS STREET BROOKLYN | — | ISSUED | 05/03/2018 | 03/03/2021 | — | MH, OT, PL |
| 321846865BIS | 261 HENRY STREET BROOKLYN | — | ISSUED | 11/20/2019 | 02/25/2021 | — | PL |
| 340252167BIS | 169 COLUMBIA HEIGHTS BROOKLYN | — | ISSUED | 03/31/2016 | 02/08/2021 | — | MH, PL |
| 123791487BIS | 206 WEST 17 STREET MANHATTAN | — | ISSUED | 07/17/2020 | 01/22/2021 | — | OT |
| 340725745BIS | 222 BALTIC STREET BROOKLYN | — | ISSUED | 01/07/2021 | 01/07/2021 | — | OT |
| 121291538BIS | 77 CHARLES STREET MANHATTAN | — | ISSUED | 02/15/2018 | 12/28/2020 | — | PL |
| 321190894BIS | 89 JORALEMON STREET BROOKLYN | — | ISSUED | 02/08/2017 | 12/28/2020 | — | PL |
| 321488485BIS | 70 STATE STREET BROOKLYN | — | ISSUED | 08/04/2017 | 12/28/2020 | — | PL |
| 321517756BIS | 200 HICKS STREET BROOKLYN | — | ISSUED | 10/11/2017 | 12/28/2020 | — | MH, OT, PL |
| 322004120BIS | 282 HENRY STREET BROOKLYN | — | ISSUED | 09/15/2020 | 09/15/2020 | — | OT |
| 321975118BIS | 155 WARREN STREET BROOKLYN | — | ISSUED | 03/10/2020 | 03/19/2020 | — | OT, PL |
| 340251916BIS | 169 COLUMBIA HEIGHTS BROOKLYN | — | ISSUED | 09/17/2015 | 12/26/2019 | — | OT |
| 321997247BIS | 16 GRACE COURT ALLEY BROOKLYN | — | ISSUED | 10/01/2019 | 10/01/2019 | — | OT |
| 320624491BIS | 169 COLUMBIA HEIGHTS BROOKLYN | — | ISSUED | 04/06/2016 | 01/14/2019 | — | PL |
| 340252112BIS | 169 COLUMBIA HEIGHTS BROOKLYN | — | ISSUED | 09/21/2015 | 01/14/2019 | — | OT |
| 321370146BIS | 1 PIERREPONT STREET BROOKLYN | — | ISSUED | 05/26/2016 | 01/11/2019 | — | MH, OT, PL |
| 321439047BIS | 89 JORALEMON STREET BROOKLYN | — | ISSUED | 09/13/2016 | 01/11/2019 | — | OT, PL |
| 321741102BIS | 216 COLUMBIA HEIGHTS BROOKLYN | — | ISSUED | 06/22/2018 | 01/11/2019 | — | MH, OT, PL |
| 321818173BIS | 169 COLUMBIA HEIGHTS BROOKLYN | — | ISSUED | 09/06/2018 | 09/06/2018 | — | OT |
| 321143455BIS | 23 MIDDAGH STREET BROOKLYN | — | ISSUED | 10/08/2015 | 01/19/2018 | — | MH, OT, PL |
| 122329220BIS | 97 BARROW STREET MANHATTAN | — | ISSUED | 10/06/2016 | 12/27/2017 | — | OT, PL |
| 122926254BIS | 97 BARROW STREET MANHATTAN | — | ISSUED | 06/15/2017 | 12/27/2017 | — | PL |
| 320768497BIS | 145 COLUMBIA HEIGHTS BROOKLYN | — | ISSUED | 10/30/2013 | 12/27/2017 | — | MH, OT, PL |
| 320896857BIS | 145 COLUMBIA HEIGHTS BROOKLYN | — | ISSUED | 11/12/2013 | 12/27/2017 | — | MH, OT, PL |
| 320322183BIS | 1 PIERREPONT STREET BROOKLYN | — | ISSUED | 01/13/2012 | 05/18/2017 | — | MH, OT, PL |
| 122926227BIS | 97 BARROW STREET MANHATTAN | — | ISSUED | 05/11/2017 | 05/11/2017 | — | OT |
| 321166411BIS | 1 PIERREPONT STREET BROOKLYN | — | ISSUED | 08/17/2015 | 04/06/2017 | — | MH, OT, PL |
| 321327122BIS | 74 WILLOW STREET BROOKLYN | — | ISSUED | 10/04/2016 | 12/28/2016 | — | MH, OT, PL |
| 321393096BIS | 621 3 STREET BROOKLYN | — | ISSUED | 06/21/2016 | 06/28/2016 | — | MH, OT, PL |
| 340387593BIS | 325 STATE STREET BROOKLYN | — | ISSUED | 06/02/2016 | 06/20/2016 | — | OT, PL |
| 321392765BIS | 89 JORALEMON STREET BROOKLYN | — | ISSUED | 05/27/2016 | 05/27/2016 | — | OT |
| 320516250BIS | 105 WILLOW STREET BROOKLYN | — | ISSUED | 12/05/2013 | 04/28/2016 | — | PL |
| 320369356BIS | 38 SIDNEY PLACE BROOKLYN | — | ISSUED | 09/18/2012 | 12/29/2015 | — | PL |
| 320594843BIS | 321 CLINTON STREET BROOKLYN | — | ISSUED | 01/29/2015 | 12/29/2015 | — | — |
| 320862759BIS | 77 COLUMBIA HEIGHTS BROOKLYN | — | ISSUED | 05/07/2015 | 12/24/2015 | — | MH, OT, PL |
| 340303585BIS | 24 FT GREENE PLACE BROOKLYN | — | ISSUED | 09/25/2015 | 12/24/2015 | — | OT |