← Back
Two stories - detached, small or mid-size
189 ST MARYS AVENUE
STATEN ISLAND · Rosebank-Shore Acres-Park Hill · BIN 5043856
💬 Discuss this project
1925Year Built
2Stories
A1Building Class
R3AZoning
968 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: IP DREAM HOUSE LLC · 3,825 sf lot · 0.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof17p · 1 filing · 20 docs
Floor 228p · 2 filings · 20 docs
Floor 128p · 2 filings · 20 docs
Cellar29p · 2 filings · 20 docs
Sub-Basement10p · 1 filing · 20 docs
Site & exterior35p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LLC CAVALRY103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHUN ENGINEERING CONSULTANT PLLC607/07/2026
SHARON ENGINEERING, P.C401/02/2025
CKL ENGINEERING106/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CAVALRY LLC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CAVALRY LLCGeneral Contractor807/08/2026
BIG I RESTORATION INCGeneral Contractor307/29/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHUN ENGINEERING CONSULTA9605607/07/2026
DAL H CHUN ENGINEER PC1972401/02/2025
Building Lifecycle
All (75)Filed (11)Permit Issued (9)Signed Off (1)Violation (1)Inspection (7)Objection (16)Special Inspection (30)
08/24/2026
Objection resolved — Resolved
08/05/2026
Objection raised — Energy
07/29/2026
Inspection — Under Review Boiler Equipment Inspection
Under Review
View inspection ↗
07/28/2026
Permit issued — General Construction
S01027073-I1-GC
07/07/2026
Filed — Alteration CO
APPLICATION FILED HERE TO PROPOSE MECHANICAL SYSTEMS WORK TYPE
S01021883-P3
06/03/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
JAMES CHUN
06/03/2026
Special inspection requirement — Interior lighting power
JAMES CHUN
06/03/2026
Special inspection requirement — Metering
JAMES CHUN
06/03/2026
Special inspection requirement — Fenestration air leakage
JAMES CHUN
06/03/2026
Special inspection requirement — Fenestration areas
JAMES CHUN
06/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JAMES CHUN
06/03/2026
Special inspection requirement — Insulation placement and R values
JAMES CHUN
06/03/2026
Special inspection requirement — Air barrier - visual inspection
JAMES CHUN
06/03/2026
Special inspection requirement — Lighting in dwelling units
JAMES CHUN
06/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
JAMES CHUN
06/03/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES CHUN
06/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES CHUN
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
05/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/16/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/10/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/31/2026
Permit issued — Plumbing
S01021883-S7-PL
10/27/2025
Signed off — Alteration CO
APPLICATION FILED HERE TO PROPOSE MECHANICAL SYSTEMS WORK TYPE
S01021883-S2
06/30/2025
Permit issued — General Construction
S01021883-I1-GC
05/13/2025
Violation issued (ECB, closed)
Unknown
04/03/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/10/2025
Permit issued — Support of Excavation
S01021883-Z3-SE
01/10/2025
Permit issued — Foundation
S01021883-Z2-FO
01/02/2025
Filed — Alteration CO
APPLICATION FILED HERE TO PROPOSE MECHANICAL SYSTEMS WORK TYPE
S01021883-P2
12/30/2024
Permit issued — Structural
S01021883-Z1-ST
12/17/2024
Objection resolved — Addressed
12/16/2024
Special inspection requirement — Final
JAMES CHUN
12/16/2024
Special inspection requirement — Concrete - Cast-In-Place
JAMES CHUN
12/16/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES CHUN
12/16/2024
Special inspection requirement — Subgrade Inspections
JAMES CHUN
12/16/2024
Special inspection requirement — Footing and Foundation
JAMES CHUN
12/11/2024
Objection resolved — Addressed
12/10/2024
Objection raised — Other
12/09/2024
Objection resolved — Addressed
12/04/2024
Filed — Alteration CO
APPLICATION FILED HERE TO PROPOSE MECHANICAL SYSTEMS WORK TYPE
S01021883-P1
11/29/2024
Special inspection requirement — Final
JAMES CHUN
11/29/2024
Special inspection requirement — Structural Cold-Formed Steel
JAMES CHUN
11/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES CHUN
11/29/2024
Special inspection requirement — Concrete - Cast-In-Place
JAMES CHUN
11/19/2024
Permit issued — General Construction
S01021883-I1-GC
11/15/2024
Permit issued — Mechanical Systems
S01021883-S6-MS
11/14/2024
Objection resolved — Addressed
11/12/2024
Objection resolved — Addressed
10/17/2024
Objection raised — Other
10/09/2024
Filed — Alteration CO
APPLICATION FILED HERE TO PROPOSE MECHANICAL SYSTEMS WORK TYPE
S01021883-Z3
10/02/2024
Special inspection requirement — Subgrade Inspections
JAMES CHUN
09/26/2024
Objection resolved — Addressed
09/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES CHUN
09/20/2024
Objection raised — Energy
09/20/2024
Objection raised — Other
09/17/2024
Objection resolved — Addressed
08/29/2024
Objection raised — Other
08/29/2024
Objection raised — Other
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBIG I RESTORATION INC07/28/2026
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC03/31/2026
DOB NOWGeneral ConstructionPermit IssuedCAVALRY LLC06/30/2025
DOB NOWSupport of ExcavationPermit IssuedCAVALRY LLC01/10/2025
DOB NOWFoundationPermit IssuedCAVALRY LLC01/10/2025
DOB NOWStructuralPermit IssuedCAVALRY LLC12/30/2024
DOB NOWGeneral ConstructionPermit IssuedCAVALRY LLC11/19/2024
DOB NOWMechanical SystemsPermit IssuedBIG I RESTORATION INC11/15/2024
DOB NOWConstruction FenceSigned-offBIG I RESTORATION INC07/12/2024
1 project · most recent 07/07/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/07/2026Permit IssuedCAVALRY LLCHeating and Air Conditioning Systems
Heat / Cool
Daikin 2MXS18NMVJUA 25,000 BTU · Fan Coil Indoor ×1
4MXS36RMVJUA 43,000 BTU · Fan Coil Indoor ×1
5MXS48TVJU 48,500 BTU · Fan Coil Indoor ×1
1 project · most recent 07/07/2026
Water/Sanitary
FiledStatusContractorScope
07/07/2026Signed-offORBIT PLBG & HTG INCWater/Sanitary
1 project · most recent 04/22/2025
General Wiring
FiledStatusContractorScope
04/22/2025CompleteDENMAR ELECTRIC CORPGeneral Wiring
1 project · most recent 07/07/2026
Concrete
FiledStatusContractorScope
07/07/2026Signed-offORBIT PLBG & HTG INCConcrete
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/29/2026Under Review Boiler Equipment InspectionUnder ReviewView ↗
05/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/16/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/10/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/03/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
06/03/2026Excavations - Sheeting, Shoring, and BracingJAMES CHUNspecial
06/03/2026Interior lighting powerJAMES CHUNenergy_progress
06/03/2026MeteringJAMES CHUNenergy_progress
06/03/2026Fenestration air leakageJAMES CHUNenergy_progress
06/03/2026Fenestration areasJAMES CHUNenergy_progress
06/03/2026Fenestration and door U-factor and product ratingsJAMES CHUNenergy_progress
06/03/2026Insulation placement and R valuesJAMES CHUNenergy_progress
06/03/2026Air barrier - visual inspectionJAMES CHUNenergy_progress
06/03/2026Lighting in dwelling unitsJAMES CHUNenergy_progress
06/03/2026Fire-Resistance Rated ConstructionJAMES CHUNprogress
06/03/2026Energy Code Compliance InspectionsJAMES CHUNprogress
06/03/2026Structural Stability – Alterations of existing buildingsJAMES CHUNspecial
06/03/2026Fire-Resistant Penetrations and JointsJAMES CHUNspecial
12/16/2024FinalJAMES CHUNprogress
12/16/2024Concrete - Cast-In-PlaceJAMES CHUNspecial
12/16/2024Structural Stability – Alterations of existing buildingsJAMES CHUNspecial
12/16/2024Subgrade InspectionsJAMES CHUNspecial
12/16/2024Footing and FoundationJAMES CHUNprogress
11/29/2024FinalJAMES CHUNprogress
11/29/2024Structural Cold-Formed SteelJAMES CHUNspecial
11/29/2024Structural Stability – Alterations of existing buildingsJAMES CHUNspecial
11/29/2024Concrete - Cast-In-PlaceJAMES CHUNspecial
10/02/2024Subgrade InspectionsJAMES CHUNspecial
09/26/2024Structural Stability – Alterations of existing buildingsJAMES CHUNspecial
05/14/2024Energy Code Compliance InspectionsJAMES CHUNprogress
Latest 25 of 42.
▾Documents — 88 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/21/2026S01027073-I1Request digital key ↗
08/20/2026S01021883-Z1Request digital key ↗
08/20/2026S01021883-S7Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
11/07/2024540265112Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
03/17/2025540265112Open ↗
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram3
08/20/2026S01021883-I1Open ↗
08/15/2026S01021883-P3Open ↗
08/13/2026S01021883-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/15/2026S01021883-P3Open ↗
08/13/2026S01021883-I1Open ↗
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/20/2026S01021883-S2Open ↗
08/20/2026S01021883-Z1Open ↗
08/20/2026S01021883-S7Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026S01021883-P2Open ↗
09/01/2026S01021883-P2Open ↗
08/30/2026S01027073-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026S01021883-P2Open ↗
08/30/2026S01027073-I1Open ↗
08/30/2026S01021883-Z3Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/07/2024540265112Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/07/2024540265112Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/15/2026S01021883-P3Open ↗
08/13/2026S01021883-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/15/2026S01021883-P3Open ↗
08/13/2026S01021883-I1Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/20/2026S01021883-S7Open ↗
08/20/2026S01021883-S6Open ↗
08/20/2026S01021883-S2Open ↗
Showing 3 of 11 on file for this type
▸Inspections & Test Reports4
▸BISBPP-9 - Request for Builders Pavement Field Inspection2
03/17/2025540265112Open ↗
03/17/2025540265112Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)2
08/13/2026S01021883-Z3Open ↗
08/13/2026S01021883-Z2Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
03/17/2025540265112Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
03/17/2025540265112Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/07/2024540265112Open ↗
▸Other Documents18
▸DOB NOWPlot Diagram5
08/15/2026S01021883-P3Open ↗
08/13/2026S01021883-P2Open ↗
08/13/2026S01021883-I1Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
03/17/2025540265112Open ↗
03/17/2025540265112Open ↗
▸DOB NOWSite Survey: Initial2
08/15/2026S01021883-P3Open ↗
08/13/2026S01021883-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/15/2026S01021883-P3Open ↗
08/13/2026S01021883-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/20/2026S01021883-I1Open ↗
08/15/2026S01021883-P3Open ↗
▸DOB NOWGeotechnical Peer Review Report (BC 1818)2
08/13/2026S01021883-P1Open ↗
08/13/2026S01021883-Z1Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
03/17/2025540265112Open ↗
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
03/17/2025540265112Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026S01021883-Z3Open ↗