Prison, jail, house of detention
19-19 HAZEN STREET
BRONX · BIN 2109477
💬 Discuss this project
1933Year Built
6Stories
Y3Building Class
C8-2Zoning
5,519,372 sfGross Floor Area
1Units
LL97 Covered11 Active Violations 0 unresolved · 11 paperwork only ▸
Prison, jail, house of detention · Owner of record: NYC Department of Corrections · 17,825,000 sf lot · 0.31 FAR built · Flood zone AE
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRose M. Singer Center4 filings · 19 docs
Floor 5New York Department of Correction1 filing · 4 docs
Floor 4New York Department of Correction1 filing · 4 docs
Floor 3New York Department of Correction1 filing · 4 docs
Floor 2Rose M. Singer Center, New York Department of Correction5 filings · 19 docs
Floor 1Rose M. Singer Center, New York Department of Correction7 filings · 19 docs
MezzanineRose M. Singer Center1 filing · 19 docs
CellarRose M. Singer Center, New York Department of Correction5 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Design and Construction1703/21/2026
NYC Department of Correction1503/21/2026
City of New York Department of Correc303/21/2026
New York City Department of Corr203/21/2026
DOC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Consulting Engineers Collaborative108/17/2022
Lakhani & Jordan208/16/2022
Urbahn Architects107/07/2022
David Ziskind307/08/2021
Superstructures Engineering + Architects306/01/2021
STV305/25/2021
Iaq Systems103/31/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Superstructures Engineering + Architects303/21/2026
Archetype Consultants803/21/2026
Tarek M. Zeid, P.E103/21/2026
Tarek M Zeid P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
E Electrical ContractingElectrical203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering Cons106308/17/2022
Atlantic Engineeringlabor1381103/23/2021
Building Lifecycle
All (127)Filed (14)Violation (5)Objection (78)Special Inspection (30)
08/17/2022
Filed — Alteration
Structural & foundation alterations at the 1st floor & roof level for proposed upgrades to existing HVAC equipment and construction of new pump house; related work as per plans. No proposed change in building use, egress, or occupancy.
X00764832-S1
08/16/2022
Filed — Alteration
Structural & foundation alterations at the 1st floor & roof level for proposed upgrades to existing HVAC equipment and construction of new pump house; related work as per plans. No proposed change in building use, egress, or occupancy.
X00764832-S2
08/16/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
08/16/2022
Special inspection requirement — Sprayed fire-resistant materials
GEORGE GHEBRYAL
08/16/2022
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
08/16/2022
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
08/16/2022
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
08/16/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
08/16/2022
Special inspection requirement — Structural Cold-Formed Steel
GEORGE GHEBRYAL
08/16/2022
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
08/15/2022
Filed — Alteration
Structural & foundation alterations at the 1st floor & roof level for proposed upgrades to existing HVAC equipment and construction of new pump house; related work as per plans. No proposed change in building use, egress, or occupancy.
X00764832-S3
07/19/2022
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
07/19/2022
Special inspection requirement — Final
GEORGE GHEBRYAL
07/19/2022
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
07/19/2022
Special inspection requirement — Final
GEORGE GHEBRYAL
07/07/2022
Filed — Alteration
Structural & foundation alterations at the 1st floor & roof level for proposed upgrades to existing HVAC equipment and construction of new pump house; related work as per plans. No proposed change in building use, egress, or occupancy.
X00764832-I1
07/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
06/27/2022
Special inspection requirement — Final
GEORGE GHEBRYAL
10/12/2021
Objection raised — Scope
10/12/2021
Objection resolved — Resolved
07/08/2021
Filed — Alteration
X00523812-I1
06/23/2021
Objection raised — Admin
06/23/2021
Objection resolved — Addressed
06/23/2021
Objection raised — Admin
06/23/2021
Objection resolved — Resolved
06/23/2021
Objection raised — Structural
06/23/2021
Objection raised — Structural
06/23/2021
Objection resolved — Resolved
06/23/2021
Objection raised — Fire_Protection
06/23/2021
Objection resolved — Resolved
06/23/2021
Objection raised — Fire_Protection
06/23/2021
Objection resolved — Resolved
06/23/2021
Objection raised — Structural
06/23/2021
Objection resolved — Resolved
06/23/2021
Objection raised — Fire_Protection
06/23/2021
Objection resolved — Resolved
06/23/2021
Objection raised — Scope
06/23/2021
Objection resolved — Resolved
06/23/2021
Objection raised — Inspections
06/23/2021
Objection resolved — Resolved
06/23/2021
Objection raised — Inspections
06/23/2021
Objection resolved — Resolved
06/23/2021
Objection raised — Inspections
06/23/2021
Objection resolved — Resolved
06/23/2021
Objection raised — Mechanical
06/23/2021
Objection resolved — Resolved
06/09/2021
Objection raised — Other
06/09/2021
Objection resolved — Resolved
06/09/2021
Objection raised — Other
06/09/2021
Objection resolved — Addressed
06/09/2021
Objection raised — Other
06/09/2021
Objection resolved — Addressed
06/09/2021
Objection raised — Other
06/09/2021
Objection resolved — Addressed
06/09/2021
Objection raised — Other
06/09/2021
Objection resolved — Resolved
06/09/2021
Objection raised — Other
06/09/2021
Objection resolved — Addressed
06/09/2021
Objection raised — Other
06/09/2021
Objection resolved — Addressed
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISFSISSUEDNicholas A. Cantatore03/12/2018
BISFSISSUEDNicholas A. Cantatore02/19/2016
BISOTISSUEDLanmark Group10/21/2015
BISOTISSUEDLanmark Group10/14/2014
BISOTRE-ISSUEDLanmark Group10/10/2014
BISSPISSUEDCharles A Dimino03/05/2014
BISMHISSUEDAwl Industries06/15/2012
BISSPISSUEDLafata-Corallo Plumbing & Heating12/05/2011
BISMHISSUEDAwl Industries06/20/2011
BISOTISSUEDPetracca and Sons03/24/2011
BISFSISSUEDEdward Levinson02/15/2011
BISMHISSUEDAwl Industries10/12/2010
BISOTISSUEDPetracca and Sons03/29/2010
BISOTISSUEDPetracca and Sons03/29/2010
BISSPISSUEDV. Barile03/01/2010
BISPLISSUEDLafata Corallo P & H12/02/2009
BISOTISSUEDPetracca & Sons08/11/2009
BISMHISSUEDC. D. E. Air-Conditioning07/02/2009
BISOTISSUEDPetracca & Sons03/12/2009
BISFSISSUEDEdward Levinson12/23/2008
BISPLISSUEDLafata Corallo P & H11/20/2008
BISMHISSUEDC.d.e.air Conditioning Co09/26/2008
BISSDISSUEDV. Barile09/04/2008
BISFSISSUEDA.L. Eastmond & Sons03/24/2008
BISPLISSUEDLafata Corallo P & H11/21/2007
BISMHISSUEDC.d.e.air Conditioning Co01/23/2007
BISOTISSUEDPetracca and Sons01/12/2007
BISOTISSUEDPetracca and Sons11/16/2006
1 project · most recent 08/17/2022
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/17/2022——Heating and Air Conditioning Systems
Heat / Cool
Trane CSAA0-14 458,000 BTU · Ahu ×4
CSAA0-17 335,000 BTU · Ahu ×4
CSAA0-08 245,000 BTU · Ahu ×2
CSAA0-12 222,000 BTU · Ahu ×2
CSAA0-21 478,000 BTU · Ahu ×1
CSAA0-25 595,000 BTU · Ahu ×1
Aermec NYBi-0500 23,500 CFM · Chiller ×11
Aeromac NYBi-0500 23,500 CFM · Chiller ×5
1 project · most recent 05/20/2021
FiledStatusContractorScope
05/20/2021——375 heads
1 project · most recent 05/20/2021
Water/Sanitary
FiledStatusContractorScope
05/20/2021——Water/Sanitary
4 projects · most recent 08/17/2022
Concrete Steel Masonry
FiledStatusContractorScope
08/17/2022——Steel, Concrete
06/01/2021——Steel
05/21/2021——Concrete
05/21/2021——Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
08/16/2022Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
08/16/2022Sprayed fire-resistant materialsGEORGE GHEBRYALspecial
08/16/2022Structural Steel - WeldingGEORGE GHEBRYALspecial
08/16/2022Structural Steel - High Strength BoltingGEORGE GHEBRYALspecial
08/16/2022Structural Steel - DetailsGEORGE GHEBRYALspecial
08/16/2022Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
08/16/2022Structural Cold-Formed SteelGEORGE GHEBRYALspecial
08/16/2022Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
07/19/2022Mechanical SystemsGEORGE GHEBRYALspecial
07/19/2022FinalGEORGE GHEBRYALprogress
07/19/2022Footing and FoundationGEORGE GHEBRYALprogress
07/19/2022FinalGEORGE GHEBRYALprogress
07/06/2022Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
06/27/2022FinalGEORGE GHEBRYALprogress
04/26/2021Post-installed Anchors—special
04/26/2021Fire-Resistant Penetrations and Joints—special
04/17/2021Post-installed Anchors—special
04/17/2021Structural Steel - Details—special
04/17/2021Structural Steel - Welding—special
04/17/2021FinalPaul Millmanprogress
03/31/2021Energy Code Compliance Inspections—progress
03/31/2021Final—progress
03/23/2021Fire-Resistant Penetrations and Joints—special
03/23/2021Final—progress
03/21/2021Insulation placement and R valuesFAWZY SALIBenergy_progress
Latest 25 of 32.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Rose M. Singer CenterGovernment / CivicCellar, Floors 1, 2, Mezzanine, Roof
Project X00764832 Alteration · Approved · 07/07/2022
Project X00523812 Alteration · Objections · 07/08/2021
Project X00473682 Alteration · Approved · 05/25/2021
Project X00496004 Alteration · Approved · 05/21/2021
Project X00517204 Alteration · Approved · 05/21/2021
Project X00473687 Alteration · Objections · 05/20/2021
Project X00478501 Alteration · Objections · 05/20/2021
Project X00490052 Alteration · Approved · 03/23/2021
New York Department of CorrectionGovernment / CivicCellar, Floors 1–5
Project Q00488670 Alteration · Approved · 03/31/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 211 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch13
08/25/2026X00490052-S2Request digital key ↗
08/25/2026X00490052-S1Request digital key ↗
08/25/2026X00490052-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/25/2026X00473682-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/14/2026X00473687-I1Request digital key ↗
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION17
07/27/2017220517368Open ↗
02/19/2016220517368Open ↗
10/14/2014220342154Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION10
03/14/2018220517368Open ↗
02/19/2016220517368Open ↗
11/10/2015220342154Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications70
▸DOB NOWSpecial Inspector Seal & Signature19
08/27/2026X00764832-I1Open ↗
08/26/2026X00490052-I1Open ↗
08/24/2026X00764832-P1Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
12/19/2018220517368Open ↗
02/19/2016220517368Open ↗
09/19/2014220342154Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/25/2026X00490052-S1Open ↗
08/25/2026X00490052-S2Open ↗
08/25/2026X00490052-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
08/27/2026X00764832-I1Open ↗
08/26/2026X00490052-I1Open ↗
08/26/2026X00490052-I1Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
02/19/2016220517368Open ↗
05/22/2014220342154Open ↗
02/11/2014220357717Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
02/19/2016220517368Open ↗
05/22/2014220342154Open ↗
02/11/2014220357717Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment9
▸BISEQUIPMENT USE PERMITS5
07/03/2012210086244Open ↗
07/03/2012210086244Open ↗
07/03/2012210086244Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
02/11/2014220357708Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
02/19/2016220517368Open ↗
▸BISSCHEDULE B - PLUMBING1
10/24/2013220342154Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
07/03/2012210086244Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
12/31/2008210086244Open ↗
▸Environmental & Asbestos15
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
02/11/2014220357717Open ↗
02/11/2014220357708Open ↗
02/11/2014220357708Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/24/2026X00764832-S3Open ↗
08/24/2026X00764832-S2Open ↗
08/24/2026X00764832-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026X00490052-S2Open ↗
08/25/2026X00490052-I1Open ↗
08/25/2026X00490052-S1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/31/2008210086244Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
09/19/2014220342154Open ↗
02/10/2014220357708Open ↗
10/24/2013220342154Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
12/19/2018220517368Open ↗
▸BISTR8: Energy Code Progress Inspections1
10/24/2013220342154Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
10/24/2013220342154Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026X00523812-I1Open ↗
▸Approvals, Objections & Sign-offs41
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
08/25/2026X00490052-S2Open ↗
08/25/2026X00490052-I1Open ↗
08/25/2026X00490052-S1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)12
08/13/2026X00764832-I1Open ↗
08/13/2026X00764832-S1Open ↗
08/13/2026X00764832-S2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)6
08/13/2026X00523812-I1Open ↗
08/13/2026X00496004-I1Open ↗
08/13/2026X00517204-I1Open ↗
Showing 3 of 6 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
12/19/2018220517368Open ↗
02/19/2016220517368Open ↗
03/07/2014220361784Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
12/19/2018220517368Open ↗
07/03/2012210086244Open ↗
05/06/2012210086244Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/31/2008210086244Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT12
12/19/2018220517368Open ↗
02/19/2016220517368Open ↗
05/14/2014220342154Open ↗
Showing 3 of 12 on file for this type
▸Filing & Intake Forms13
▸BISEFILING COVER SHEET7
02/19/2016220517368Open ↗
03/07/2014220361784Open ↗
02/11/2014220357717Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION4
07/27/2017220517368Open ↗
10/09/2014220342154Open ↗
09/26/2014220342154Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
04/30/2020220706216Open ↗
12/19/2018220517368Open ↗
▸Other Documents1
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026X00523812-I1Open ↗