19 4 PLACE
BROOKLYN · BIN 3005374
💬 Discuss this project
1899Year Built
2Stories
C0Building Class
R6BZoning
2,590 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Three families · Owner of record: LEGUME CG LLC · 1,800 sf lot · 1.44 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 1 filing · 17 docs
Floor 2Under Construction7p · 1 filing · 17 docs
Floor 1Under Construction7p · 1 filing · 17 docs
Sub-BasementUnder Construction3p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LEGUME CG LLC1109/12/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/04/2024$2.7M—— → —$1,042/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PHILIP TOSCANO ARCHITECTS307/30/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANA TREZZA203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GAUDIOSO CONTRACTING INCGeneral Contractor309/12/2026
AQUEDUCT MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AG ENGINEERING PLLC8899207/30/2026
PHILIP TOSCANO, ARCHITECT2474106/18/2025
Building Lifecycle
All (32)Filed (3)Permit Issued (3)Violation (10)Objection (8)Special Inspection (8)
09/10/2026
Permit issued — General Construction
B01227819-I1-GC
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ARIEL GOLSHAN
08/11/2026
Special inspection requirement — Energy Code Compliance Inspections
PHILIP TOSCANO
07/30/2026
Filed — Alteration
Filed to combine apartments under tppn 3/97 & reduce dwellings from 3 to 2. Change 1 sty roof to roof terrace, add to rear yard, install basement & 1st flr. flitch beam, modify kitchens, replace window with door, add internal step & partition.
B01227819-P1
07/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ARIEL GOLSHAN
07/28/2026
Special inspection requirement — Energy Code Compliance Inspections
PHILIP TOSCANO
05/14/2026
Permit issued — Plumbing
B01227819-S1-PL
01/08/2026
Objection resolved — Addressed
12/29/2025
Objection raised — Cost
12/23/2025
Filed — Alteration
Filed to combine apartments under tppn 3/97 & reduce dwellings from 3 to 2. Change 1 sty roof to roof terrace, add to rear yard, install basement & 1st flr. flitch beam, modify kitchens, replace window with door, add internal step & partition.
B01227819-S1
11/20/2025
Violation issued (HPD, closed)
I
09/02/2025
Permit issued — General Construction
B01227819-I1-GC
07/14/2025
Objection resolved — Addressed
07/01/2025
Objection resolved — Addressed
07/01/2025
Objection resolved — Addressed
06/26/2025
Objection raised — Structural
06/26/2025
Objection raised — Structural
06/26/2025
Objection raised — Cost
06/18/2025
Filed — Alteration
Filed to combine apartments under tppn 3/97 & reduce dwellings from 3 to 2. Change 1 sty roof to roof terrace, add to rear yard, install basement & 1st flr. flitch beam, modify kitchens, replace window with door, add internal step & partition.
B01227819-I1
05/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
PHILIP TOSCANO
05/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILIP TOSCANO
05/19/2025
Special inspection requirement — Energy Code Compliance Inspections
PHILIP TOSCANO
05/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
PHILIP TOSCANO
04/03/2024
Violation issued (HPD, closed)
A
11/22/2023
Violation issued (HPD, closed)
I
03/17/2023
Violation issued (HPD, closed)
A
11/14/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
A
10/28/2019
Violation issued (HPD, closed)
I
10/12/2018
Violation issued (HPD, closed)
I
10/06/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedGAUDIOSO CONTRACTING INC09/10/2026
DOB NOWPlumbingPermit IssuedAQUEDUCT MECHANICAL CORP05/14/2026
DOB NOWGeneral ConstructionPermit IssuedGAUDIOSO CONTRACTING09/02/2025
1 project · most recent 07/30/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/30/2026Permit IssuedAQUEDUCT MECHANICAL CORPGas, Water/Sanitary
1 project · most recent 02/17/2026
General Wiring
FiledStatusContractorScope
02/17/2026Permit IssuedCOAST ELECTRIC LLCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
08/11/2026Fire-Resistant Penetrations and JointsARIEL GOLSHANspecial
08/11/2026Energy Code Compliance InspectionsPHILIP TOSCANOprogress
07/28/2026Fire-Resistant Penetrations and JointsARIEL GOLSHANspecial
07/28/2026Energy Code Compliance InspectionsPHILIP TOSCANOprogress
05/19/2025Structural Stability – Alterations of existing buildingsPHILIP TOSCANOspecial
05/19/2025Fire-Resistant Penetrations and JointsPHILIP TOSCANOspecial
05/19/2025Energy Code Compliance InspectionsPHILIP TOSCANOprogress
05/19/2025Fire-Resistance Rated ConstructionPHILIP TOSCANOprogress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/19/2026B01227819-P1Request digital key ↗
08/19/2026B01227819-I1Request digital key ↗
08/19/2026B01227819-S1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/19/2026B01227819-S1Open ↗
08/19/2026B01227819-I1Open ↗
08/19/2026B01227819-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/12/2026B01227819-S1Open ↗
08/27/2026B01227819-I1Open ↗
08/24/2026B01227819-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/12/2026B01227819-S1Open ↗
08/27/2026B01227819-I1Open ↗
08/24/2026B01227819-P1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/19/2026B01227819-S1Open ↗
08/19/2026B01227819-P1Open ↗
08/19/2026B01227819-I1Open ↗