Three families
19 4TH PLACE
BROOKLYN · BIN 3005374
💬 Discuss this project
1899Year Built
2Stories
C0Building Class
R6BZoning
2,590 sfGross Floor Area
3Units
Rent Stabilized0 Active Violations
Three families · Owner of record: Legume CG · 1,800 sf lot · 1.44 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofApartment combination and rear roof terraceUnder Construction4p · 1 filing · 20 docs
Floor 2Apartment combination and rear roof terraceUnder Construction7p · 1 filing · 20 docs
Floor 1Apartment combination and rear roof terraceUnder Construction7p · 1 filing · 20 docs
Sub-BasementApartment combination and rear roof terraceUnder Construction3p · 1 filing · 20 docs
Site & exteriorApartment combination and rear roof terraceUnder Construction3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Legume CG1210/04/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/04/2024$2.7M—— → —$1,042/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Philip Toscano Architects409/24/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Dana Trezza203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Gaudioso ContractingGeneral Contractor309/12/2026
Aqueduct MechanicalPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Philip Toscano, Architect2474209/24/2026
AG Engineering8899207/30/2026
Building Lifecycle
All (40)Filed (4)Permit Issued (3)Violation (10)Inspection (2)Objection (9)Special Inspection (12)
10/09/2026
Objection raised — Other
09/24/2026
Filed — Alteration
Filed to combine apartments under tppn 3/97 & reduce dwellings from 3 to 2. Change 1 sty roof to roof terrace, add to rear yard, install basement & 1st flr. flitch beam, modify kitchens, replace window with door, add internal step & partition.
B01227819-P2
09/16/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
PHILIP TOSCANO
09/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILIP TOSCANO
09/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
PHILIP TOSCANO
09/16/2026
Special inspection requirement — Energy Code Compliance Inspections
PHILIP TOSCANO
09/10/2026
Permit issued — General Construction
B01227819-I1-GC
08/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/11/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ARIEL GOLSHAN
08/11/2026
Special inspection requirement — Energy Code Compliance Inspections
PHILIP TOSCANO
07/30/2026
Filed — Alteration
Filed to combine apartments under tppn 3/97 & reduce dwellings from 3 to 2. Change 1 sty roof to roof terrace, add to rear yard, install basement & 1st flr. flitch beam, modify kitchens, replace window with door, add internal step & partition.
B01227819-P1
07/28/2026
Special inspection requirement — Energy Code Compliance Inspections
PHILIP TOSCANO
07/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ARIEL GOLSHAN
05/14/2026
Permit issued — Plumbing
B01227819-S1-PL
01/08/2026
Objection resolved — Addressed
12/29/2025
Objection raised — Cost
12/23/2025
Filed — Alteration
Filed to combine apartments under tppn 3/97 & reduce dwellings from 3 to 2. Change 1 sty roof to roof terrace, add to rear yard, install basement & 1st flr. flitch beam, modify kitchens, replace window with door, add internal step & partition.
B01227819-S1
11/20/2025
Violation issued (HPD, closed)
I
09/02/2025
Permit issued — General Construction
B01227819-I1-GC
07/14/2025
Objection resolved — Addressed
07/01/2025
Objection resolved — Addressed
07/01/2025
Objection resolved — Addressed
06/26/2025
Objection raised — Structural
06/26/2025
Objection raised — Structural
06/26/2025
Objection raised — Cost
06/18/2025
Filed — Alteration
Filed to combine apartments under tppn 3/97 & reduce dwellings from 3 to 2. Change 1 sty roof to roof terrace, add to rear yard, install basement & 1st flr. flitch beam, modify kitchens, replace window with door, add internal step & partition.
B01227819-I1
05/19/2025
Special inspection requirement — Energy Code Compliance Inspections
PHILIP TOSCANO
05/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
PHILIP TOSCANO
05/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PHILIP TOSCANO
05/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
PHILIP TOSCANO
04/03/2024
Violation issued (HPD, closed)
A
11/22/2023
Violation issued (HPD, closed)
I
03/17/2023
Violation issued (HPD, closed)
A
11/14/2022
Violation issued (HPD, closed)
I
02/18/2022
Violation issued (HPD, closed)
A
04/05/2021
Violation issued (HPD, closed)
A
10/28/2019
Violation issued (HPD, closed)
I
10/12/2018
Violation issued (HPD, closed)
I
10/06/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedGaudioso Contracting09/10/2026
DOB NOWPlumbingPermit IssuedAqueduct Mechanical05/14/2026
DOB NOWGeneral ConstructionPermit IssuedGaudioso Contracting09/02/2025
1 project · most recent 09/24/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/24/2026Permit IssuedAqueduct MechanicalGas, Water/Sanitary
1 project · most recent 02/17/2026
General Wiring
FiledStatusContractorScope
02/17/2026Permit IssuedCoast ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/11/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
09/16/2026Structural Stability – Alterations of existing buildingsPHILIP TOSCANOspecial
09/16/2026Fire-Resistant Penetrations and JointsPHILIP TOSCANOspecial
09/16/2026Fire-Resistance Rated ConstructionPHILIP TOSCANOprogress
09/16/2026Energy Code Compliance InspectionsPHILIP TOSCANOprogress
08/11/2026Fire-Resistant Penetrations and JointsARIEL GOLSHANspecial
08/11/2026Energy Code Compliance InspectionsPHILIP TOSCANOprogress
07/28/2026Energy Code Compliance InspectionsPHILIP TOSCANOprogress
07/28/2026Fire-Resistant Penetrations and JointsARIEL GOLSHANspecial
05/19/2025Energy Code Compliance InspectionsPHILIP TOSCANOprogress
05/19/2025Fire-Resistance Rated ConstructionPHILIP TOSCANOprogress
05/19/2025Fire-Resistant Penetrations and JointsPHILIP TOSCANOspecial
05/19/2025Structural Stability – Alterations of existing buildingsPHILIP TOSCANOspecial
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/19/2026B01227819-P1Request digital key ↗
08/19/2026B01227819-I1Request digital key ↗
08/19/2026B01227819-S1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature4
10/05/2026B01227819-P2Open ↗
08/19/2026B01227819-I1Open ↗
08/19/2026B01227819-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
10/05/2026B01227819-P2Open ↗
09/12/2026B01227819-S1Open ↗
08/27/2026B01227819-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
10/05/2026B01227819-P2Open ↗
09/12/2026B01227819-S1Open ↗
08/27/2026B01227819-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
10/05/2026B01227819-P2Open ↗
08/19/2026B01227819-I1Open ↗
08/19/2026B01227819-P1Open ↗
Showing 3 of 4 on file for this type