← Back
BuildNYC
Three families
19 BAY 23 STREET
BROOKLYN · Bensonhurst · BIN 3166859
💬 Discuss this project
1910Year Built
2.75Stories
C0Building Class
R5Zoning
3,785 sfGross Floor Area
3Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Three families · 3,867 sf lot · 0.98 FAR built · Flood zone X
Locations of Work
Plumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 12p · 1 filing · 14 docs
Cellar2p · 1 filing · 14 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/12/2019$1.5M—Private party → Private party$396/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Marianne Russo211/19/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VMC Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Integrity Consulting Service666211/19/2020
Building Lifecycle
04/07/2021
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
03/15/2021
Signed off — Alteration
Cellar fl - new toilet, new lav, new washer, and new gas dryer, 3 new boilers, 3 new hot water ht. Relocated 3 gas meters. At first fl, new toilet, new lav, new shower, new washer, relocated :shower, lavatory, toilet, residential sink
B00258887-I1
11/19/2020
Filed — Alteration
Cellar fl - new toilet, new lav, new washer, and new gas dryer, 3 new boilers, 3 new hot water ht. Relocated 3 gas meters. At first fl, new toilet, new lav, new shower, new washer, relocated :shower, lavatory, toilet, residential sink
B00258887-P1
11/17/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
11/17/2020
Special inspection requirement — Energy Code Compliance Inspections
MARIANNE RUSSO
11 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM. Spinelli PLB & Heating07/02/2020
BISOTISSUEDDyker Solutions09/15/2020
BISOTISSUEDDyker Solutions01/31/2020
1 project · most recent 01/17/2021
General Wiring
FiledStatusContractorScope
01/17/2021CompleteGoodall ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
11/17/2020Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
11/17/2020Energy Code Compliance InspectionsMARIANNE RUSSOprogress
11/17/2020HVAC and service water heating system controls MARIANNE RUSSOenergy_progress
11/17/2020HVAC and service water heating equipment MARIANNE RUSSOenergy_progress
11/17/2020HVAC insulation and sealing MARIANNE RUSSOenergy_progress
11/17/2020Electrical energy consumptionMARIANNE RUSSOenergy_progress
39 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account