Office with commercial, 7-19 stories
19 WEST 44TH STREET
MANHATTAN · BIN 1034224
💬 Discuss this project
1916Year Built
16Stories
O6Building Class
C6-4.5Zoning
235,199 sfGross Floor Area
150Units
LL97 Covered0 Active ViolationsFISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: 19 West 44th Street Property Investors I V · 16,250 sf lot · 14.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofKellarl Taverna6p · 2 filings · 11 docs
PenthouseFacade Restoration2p · 1 filing · 4 docs
Floor 16Alteryx19p · 4 filings · 20 docs
Floor 15SavannaUnder Construction46p · 9 filings · 20 docs
Floor 14Turnspire Capital PartnersUnder Construction1p · 2 filings · 9 docs
Floor 13
Floor 1211th and 12th floor mechanical work13p · 2 filings · 11 docs
Floor 1111th and 12th floor mechanical work15p · 2 filings · 11 docs
Floor 1010th floor sprinkler modification5p · 2 filings · 6 docs
Floor 9
Floor 8Plumbing work and demolition8p · 2 filings · 18 docs
Floor 7Empire City Consultants43p · 13 filings · 20 docs
Floor 6Olmstead Oli PropertiesUnder Construction2p · 2 filings · 12 docs
Floor 5Butterflied Chicken11p · 1 filing · 4 docs
Floor 4Butterflied Chicken12p · 3 filings · 16 docs
Floor 3Butterflied Chicken19p · 1 filing · 4 docs
Floor 2Butterflied Chicken, Kellarl Taverna31p · 5 filings · 20 docs
Floor 1Butterflied Chicken, Kellarl TavernaUnder Construction31p · 7 filings · 20 docs
MezzaninePlumbing and fire protection workUnder Construction3p · 2 filings · 15 docs
CellarKellarl Taverna11p · 3 filings · 15 docs
Sub-BasementPlumbing work for restaurant renovation1p · 1 filing · 8 docs
Site & exteriorFacade Restoration18p · 4 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SL Green Realty17403/21/2026
19 West 44th Street2907/08/2026
Savanna2807/08/2026
Emmis Realty2203/21/2026
Polestar 44 Properties1403/21/2026
19 W 44 Owner609/13/2026
Emmes Reatly Services603/21/2026
Kellari603/21/2026
Metronexus303/21/2026
Apf Properties203/21/2026
Green 19W44 Owner LLC C/O Everes203/21/2026
Pole 44 PR203/21/2026
19 West 44th Street Property Investors I V103/22/2026
Quantum Design103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/04/2026$108.0M—19 WEST 44TH STREET PROPERTY INVESTORS IV, LLC → 19 W 44 Owner$459/sf building
10/16/2017$195.0M—DEKA IMMOBILIEN INVESTMENT GMBH → 19 WEST 44TH STREET PROPERTY INVESTORS IV, LLC$829/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Empire City Consultants5803/21/2026
Lombardo Building Consultants203/21/2026
Louis Striar203/21/2026
H&Z Building NY603/21/2026
Marcus LZ603/21/2026
AE Design Solution403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SavconGeneral Contractor3107/08/2026
Advanced Plumbing, Mechanical & SprinklerFire Protection607/08/2026
Everest ScaffoldingScaffold507/08/2026
Watson's Plumbing & Heatingspecialty_contractor407/08/2026
Premier SanitationGeneral Contractor307/19/2026
Savcon ConstructionGeneral Contractor303/21/2026
SMVP ManagementGeneral Contractor303/21/2026
Dycon EnterprisesGeneral Contractor307/08/2026
Vanquish GroupGeneral Contractor203/21/2026
Structure ToneGeneral Contractor203/21/2026
Lawrence Exterior RestorationScaffold203/21/2026
Advanced Plumbing MechanicalPlumbing207/08/2026
Icon InteriorsGeneral Contractor204/09/2026
Stanco System Electrical ContElectrical203/21/2026
VMC Plumbing & HeatingPlumbing207/08/2026
Roz-A-Lite Electrical ContractingElectrical103/21/2026
Watson's Plumbing, Heating, & BuildingPlumbing106/28/2026
Borowide Elect'l ContractorsElectrical103/22/2026
Borowide Elect'l ContractorsElectrical103/21/2026
Palace SamuelElectrical103/21/2026
Dynamic Electrical ContractorsElectrical103/21/2026
Rockmor Electric EnterprisesElectrical103/21/2026
Ener-Con Technical ServicesGeneral Contractor107/08/2026
FM95NYGeneral Contractor107/08/2026
Rally Restorationspecialty_contractor104/09/2026
Andamio ScaffoldingScaffold104/09/2026
Aggressive Fire ProtectionFire Protection107/08/2026
A&H Express Plumbing & HeatingPlumbing107/08/2026
Dependable MechanicalFire Protection107/08/2026
RRP PlumbingFire Protection106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Wong Architect1272307/10/2026
Consulting and Testing SE6152102/24/2026
NKM Engineering6244312/15/2025
Jian Engineering7397212/15/2025
Alan Margolin & Associates4232303/26/2025
HRF Services5616110/21/2020
Ashraf1973102/05/2020
Building Lifecycle
All (260)Filed (49)Permit Issued (53)Signed Off (30)Facade (FISP) (18)Violation (60)Inspection (20)Special Inspection (30)
07/17/2026
Permit issued — General Construction
M01427803-I1-GC
07/10/2026
Filed — Alteration
Non bearing partitions and finishes removal on 6th fl. No change in use, egress or occupancy
M01427803-I1
07/08/2026
Permit issued — General Construction
M01417174-I1-GC
07/08/2026
Permit issued — General Construction
M01417230-I1-GC
07/08/2026
Special inspection requirement — Final
KING WONG
07/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KING WONG
07/01/2026
Filed — Alteration
Non bearing partitions and finishes removal on 4th fl, suites 400,407,412,417. No change in use, egress or occupancy
M01417174-I1
06/30/2026
Filed — Alteration
Non bearing partitions and finishes removal on 14th and 15th fl. No change in use, egress or occupancy
M01417230-I1
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KING WONG
06/15/2026
Special inspection requirement — Final
KING WONG
06/15/2026
Special inspection requirement — Final
KING WONG
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KING WONG
06/04/2026
Signed off — Alteration
FILING HEREWITH FOR INTERIOR RENOVATION ON 11TH12TH FLOOR. NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01354858-I1
06/03/2026
Signed off — Alteration
FILING HEREWITH FOR MECHANICAL WORK AS SHOWN ON PLANS. NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01354493-I1
05/28/2026
Permit issued — Mechanical Systems
M01168392-I1-GC
04/24/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/17/2026
Signed off — Alteration
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD FOR FACADE REPAIR AND INSPECTION.
M01205919-I1
04/08/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/04/2026
Cycle 10 facade report submitted
03/04/2026
Cycle 10 facade report signed — SAFE
02/26/2026
Permit issued — Mechanical Systems
M01354493-I1-MS
02/26/2026
Permit issued — General Construction
M01354858-I1-GC
02/26/2026
Cycle 10 facade inspection completed
02/24/2026
Filed — Alteration
FILING HEREWITH FOR INTERIOR RENOVATION ON 11TH12TH FLOOR. NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01354858-I1
02/24/2026
Filed — Alteration
FILING HEREWITH FOR MECHANICAL WORK AS SHOWN ON PLANS. NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01354493-I1
02/11/2026
Special inspection requirement — Lighting controls
DANIEL CREIGHTON
02/11/2026
Special inspection requirement — Energy Code Compliance Inspections
DANIEL CREIGHTON
02/03/2026
Special inspection requirement — Final
DANIEL CREIGHTON
02/02/2026
Special inspection requirement — Final
DANIEL CREIGHTON
02/02/2026
Special inspection requirement — Mechanical Systems
DANIEL CREIGHTON
12/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/16/2025
Special inspection requirement — Sprinkler Systems
JIAN DENG
12/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
NARESH MAHANGU
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
12/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Kaijin Liang
12/15/2025
Filed — Alteration
PROPOSE TO INSTALL NEW COMMERCIAL KITCHEN EQUIPMENT, RELOCATE ONE OF EXISTING BATHROOM, INSTALL NEW BATHROOM AND ASSOCIATED PIPING AND AS PER PLANS. FILED IN CONJUCTION WITH OT-M01168392-I1. NO CHANGE IN USE EGRESS OR OCCUPANCY
M01192047-P1
12/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
12/14/2025
Special inspection requirement — Sprinkler Systems
JIAN DENG
12/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
NARESH MAHANGU
12/14/2025
Special inspection requirement — Energy Code Compliance Inspections
Kaijin Liang
11/07/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01213477-I1
11/06/2025
Signed off — Alteration
M01167368-I1
08/21/2025
Permit issued — Suspended Scaffold
M01275080-I1-SC
08/20/2025
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M01275080-I1
07/08/2025
Permit issued — General Construction
M01167368-I1-GC
06/03/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/15/2025
Permit issued — Plumbing
M01192047-I1-PL
05/14/2025
Permit issued — Sprinklers
M01192047-I1-EW-SP
04/25/2025
Permit issued — Sidewalk Shed
M01213477-I1-SH
04/24/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01213477-I1
04/17/2025
Permit issued — Suspended Scaffold
M01205919-I1-SC
04/11/2025
Filed — Alteration
APPLICATION FOR THE INSTALLATION AND USE OF SUSPENDED SCAFFOLD FOR FACADE REPAIR AND INSPECTION.
M01205919-I1
03/26/2025
Filed — Alteration
M01167368-I1
03/24/2025
Permit issued — Mechanical Systems
M01168392-I1-GC
03/13/2025
Filed — Alteration
PROPOSE TO INSTALL NEW COMMERCIAL KITCHEN EQUIPMENT, RELOCATE ONE OF EXISTING BATHROOM, INSTALL NEW BATHROOM AND ASSOCIATED PIPING AND AS PER PLANS. FILED IN CONJUCTION WITH OT-M01168392-I1. NO CHANGE IN USE EGRESS OR OCCUPANCY
M01192047-I1
03/13/2025
Filed — Alteration
M01168392-I1
01/30/2025
Signed off — Alteration
FILING HEREWITH FOR MECHANICAL WORK AS SHOWN ON PLANS. NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01081715-I1
01/29/2025
Signed off — Alteration
Filing herewith modification to the existing sprinkler system as per plans filed herewith. No change to use, egress or occupancy.
M01081726-I1
01/27/2025
Signed off — Alteration
FILING HEREWITH FOR MECHANICAL WORK AS SHOWN ON PLANS. NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01081715-S1
Latest 60 of 260 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPremier Sanitation07/17/2026
DOB NOWGeneral ConstructionSigned-offPremier Sanitation07/08/2026
DOB NOWGeneral ConstructionPermit IssuedPremier Sanitation07/08/2026
DOB NOWMechanical SystemsPermit IssuedWatson's Plumbing & Heating05/28/2026
DOB NOWMechanical SystemsSigned-offIcon Interiors02/26/2026
DOB NOWGeneral ConstructionSigned-offIcon Interiors02/26/2026
DOB NOWSuspended ScaffoldPermit IssuedRally Restoration08/21/2025
DOB NOWGeneral ConstructionSigned-offRally Restoration07/08/2025
DOB NOWPlumbingPermit IssuedWatson's Plumbing, Heating, & Building05/15/2025
DOB NOWSprinklersPermit IssuedRalph W. Landolfi JR05/14/2025
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding04/25/2025
DOB NOWSuspended ScaffoldSigned-offRally Restoration04/17/2025
DOB NOWMechanical SystemsPermit IssuedWatson's Plumbing & Heating03/24/2025
DOB NOWMechanical SystemsSigned-offSavcon12/05/2024
DOB NOWGeneral ConstructionSigned-offSavcon12/05/2024
DOB NOWMechanical SystemsSigned-offSavcon11/22/2024
DOB NOWGeneral ConstructionSigned-offSavcon11/22/2024
DOB NOWSprinklersSigned-offDependable Mechanical09/17/2024
DOB NOWPlumbingSigned-offA&H Express Plumbing & Heating09/16/2024
DOB NOWGeneral ConstructionSigned-offSavcon09/12/2024
DOB NOWMechanical SystemsSigned-offSavcon09/12/2024
DOB NOWGeneral ConstructionSigned-offStructure Tone12/21/2023
DOB NOWGeneral ConstructionSigned-offFM95NY07/12/2023
DOB NOWGeneral ConstructionSigned-offSavcon Construction05/10/2023
DOB NOWSprinklersSigned-offAdvanced Plumbing, Mechanical & Sprinkler04/08/2022
DOB NOWGeneral ConstructionSigned-offSavcon03/01/2022
DOB NOWMechanical SystemsSigned-offSavcon02/15/2022
DOB NOWMechanical SystemsPermit IssuedSavcon01/12/2022
DOB NOWGeneral ConstructionPermit IssuedSavcon01/12/2022
DOB NOWStructuralPermit IssuedSavcon01/12/2022
DOB NOWPlumbingSigned-offAdvanced Plumbing Mechanical12/29/2021
DOB NOWSprinklersSigned-offAdvanced Plumbing, Mechanical & Sprinkler12/29/2021
DOB NOWGeneral ConstructionSigned-offDycon Enterprises12/29/2021
DOB NOWMechanical SystemsSigned-offSavcon11/09/2021
DOB NOWGeneral ConstructionSigned-offSavcon11/05/2021
DOB NOWGeneral ConstructionSigned-offVanquish Group09/22/2021
DOB NOWSprinklersSigned-offAdvanced Plumbing, Mechanical & Sprinkler04/01/2021
DOB NOWSprinklersSigned-offAdvanced Plumbing, Mechanical & Sprinkler04/01/2021
DOB NOWMechanical SystemsSigned-offEner-Con Technical Services10/22/2020
DOB NOWSprinklersSigned-offAdvanced Plumbing, Mechanical & Sprinkler08/10/2020
+ 60 more permits on file
1 project · most recent 12/15/2025
FiledStatusContractorScope
12/15/2025Permit IssuedRRP Plumbing46 heads
2 projects · most recent 12/15/2025
Gas Water/Sanitary
FiledStatusContractorScope
12/15/2025Permit IssuedWatson's Plumbing, Heating, & BuildingGas, Water/Sanitary
03/18/2020Signed-offM. Spinelli PLB & HeatingGas, Water/Sanitary
16 projects · most recent 04/22/2025
General Wiring
FiledStatusContractorScope
04/22/2025CompleteBorowide Elect'l Contractors—
01/24/2025Permit IssuedLeader Electric CoGeneral Wiring
01/03/2022CompleteMetropolis ElectricGeneral Wiring
01/27/2021CompletePatriot ElectricGeneral Wiring
08/12/2020CompleteMetropolis ElectricGeneral Wiring
06/15/2020Permit IssuedTeam ElectricGeneral Wiring
02/12/2020CompleteMetropolis ElectricGeneral Wiring
02/07/2020Permit IssuedAlltech Electrical ContngGeneral Wiring
08/02/2019CompleteRainbow Electric CoGeneral Wiring
05/13/2019CompleteMetropolis ElectricGeneral Wiring
04/08/2019CompleteE G ElectricGeneral Wiring
02/27/2019CompleteE G ElectricGeneral Wiring
01/22/2019CompleteMetropolis ElectricGeneral Wiring
07/27/2018Permit IssuedEmco Electric ServicesGeneral Wiring
04/13/2018CompletePatriot Electric—
1 project · most recent 10/09/2018
Scaffold
FiledStatusContractorScope
10/09/2018Permit IssuedLawrence Exterior RestorationScaffold
1 project · most recent 08/20/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
08/20/2025Permit IssuedRally RestorationSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
04/24/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/08/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/03/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/03/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/30/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/11/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/20/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/15/2022Pass-Final SP - Up to 3 Requested FloorsPassView ↗
08/08/2022Pass-Final SP - Up to 3 Requested FloorsPassView ↗
08/02/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/18/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/15/2022Pass-Final SP - Up to 3 Requested FloorsPassView ↗
07/13/2022Fail-Final SP - Up to 3 Requested FloorsFailView ↗
07/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/27/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 92
DateRequirementInspectorRole
07/08/2026Fire-Resistant Penetrations and JointsKING WONGspecial
07/08/2026FinalKING WONGprogress
06/15/2026Fire-Resistant Penetrations and JointsKING WONGspecial
06/15/2026FinalKING WONGprogress
06/15/2026FinalKING WONGprogress
06/15/2026Fire-Resistant Penetrations and JointsKING WONGspecial
02/11/2026Energy Code Compliance InspectionsDANIEL CREIGHTONprogress
02/11/2026Lighting controlsDANIEL CREIGHTONenergy_progress
02/03/2026FinalDANIEL CREIGHTONprogress
02/02/2026FinalDANIEL CREIGHTONprogress
02/02/2026Mechanical SystemsDANIEL CREIGHTONspecial
12/16/2025Energy Code Compliance InspectionsKaijin Liangprogress
12/16/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
12/16/2025Tenant Protection Plan ComplianceNARESH MAHANGUspecial
12/16/2025Sprinkler SystemsJIAN DENGspecial
12/14/2025Energy Code Compliance InspectionsKaijin Liangprogress
12/14/2025Sprinkler SystemsJIAN DENGspecial
12/14/2025Tenant Protection Plan ComplianceNARESH MAHANGUspecial
12/14/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
01/17/2025Lighting controlsYoung Suhenergy_progress
01/17/2025HVAC-R and service water heating system controlsYoung Suhenergy_progress
01/17/2025HVAC-R and service water piping design and insulationYoung Suhenergy_progress
01/17/2025Mechanical SystemsYoung Suhspecial
01/17/2025FinalYoung Suhprogress
01/17/2025Interior lighting powerYoung Suhenergy_progress
Latest 25 of 92.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Empire City ConsultantsOfficeFloor 7
Project M01081726 Alteration · LOC Issued · 09/05/2024
Project M01081715 Alteration · LOC Issued · 09/04/2024
AlteryxOfficeFloor 16
Project M00963005 Alteration · LOC Issued · 12/15/2023
Butterflied ChickenRestaurant / Food ServiceFloors 1–5
Project M00895841 Alteration · LOC Issued · 07/05/2023
SavannaOfficeFloor 15
Project M00670808 Alteration · LOC Issued · 02/09/2022
Project M00670729 Alteration · LOC Issued · 02/07/2022
Project M00670821 Alteration · LOC Issued · 02/04/2022
Turnspire Capital PartnersOfficeFloor 14
Project M00641272 Alteration · LOC Issued · 12/20/2021
Kellarl TavernaRestaurant / Food ServiceCellar, Floors 1, 2, Roof
Project M00405351 Alteration · LOC Issued · 10/21/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 3,069 on file (BIS + DOB NOW)
▸Plans & Drawings49
▸DOB NOWPlans/Sketch34
09/06/2026M00033560-I1Request digital key ↗
09/06/2026M00084891-I1Request digital key ↗
09/03/2026M00577179-I1Request digital key ↗
Showing 3 of 34 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems6
09/05/2026M00259084-I1Request digital key ↗
09/04/2026M00352569-I1Request digital key ↗
09/04/2026M00368046-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
09/05/2026M00259241-I1Request digital key ↗
09/04/2026M00352635-I1Request digital key ↗
09/04/2026M00352635-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/05/2026M00229100-I1Request digital key ↗
09/04/2026M00352612-I1Request digital key ↗
09/04/2026M00352612-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits551
▸BISPLAN / WORK APPROVAL APPLICATION321
10/24/2023123542559Open ↗
12/02/2022123763141Open ↗
12/01/2022123763141Open ↗
Showing 3 of 321 on file for this type
▸BISWORK PERMIT APPLICATION225
12/15/2022123763141Open ↗
08/12/2020140927077Open ↗
08/12/2020140927077Open ↗
Showing 3 of 225 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1131
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications875
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION451
03/27/2020123463741Open ↗
03/27/2020123463741Open ↗
03/27/2020123463741Open ↗
Showing 3 of 451 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST135
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 135 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT113
07/17/2020140927077Open ↗
06/05/2020140907026Open ↗
Showing 2 of 113 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature48
09/05/2026M00259084-I1Open ↗
09/05/2026M00229128-I1Open ↗
09/05/2026M00229100-I1Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWProgress Inspector Seal & Signature45
09/23/2026M00405351-I1Open ↗
09/23/2026M00229100-P1Open ↗
09/23/2026M00405351-I1Open ↗
Showing 3 of 45 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM41
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 41 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature33
09/23/2026M00405351-I1Open ↗
09/02/2026M01081726-I1Open ↗
09/01/2026M00352635-P1Open ↗
Showing 3 of 33 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
07/17/2020140927077Open ↗
06/05/2020140907026Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
07/17/2020140927077Open ↗
06/05/2020140907026Open ↗
Showing 2 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment227
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE78
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 78 on file for this type
▸BISEQUIPMENT USE PERMITS36
10/07/2022123763150Open ↗
10/07/2022123763150Open ↗
10/07/2022123763150Open ↗
Showing 3 of 36 on file for this type
▸BISSELF-CERT PLUMBING NOTICE32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISSCHEDULE B - PLUMBING27
12/01/2022123763141Open ↗
03/25/2022123763150Open ↗
03/17/2022123763141Open ↗
Showing 3 of 27 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA26
03/15/2022122843842Open ↗
12/30/2021122286365Open ↗
07/30/2021123496163Open ↗
Showing 3 of 26 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT24
10/07/2022123763150Open ↗
03/24/2020123463741Open ↗
Showing 2 of 24 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSIGN HANGER CERTIFICATE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTenant Protection Plan and Notes3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos211
▸BISASBESTOS: CERTIFICATION (DEP ACP5)132
07/17/2020140927077Open ↗
06/05/2020140907026Open ↗
01/15/2020123255459Open ↗
Showing 3 of 132 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report44
09/05/2026M00259084-I1Open ↗
09/05/2026M00229128-I1Open ↗
09/05/2026M00229100-I1Open ↗
Showing 3 of 44 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/24/2026M01167368-I1Open ↗
▸Energy Compliance191
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS131
03/27/2020123463741Open ↗
03/27/2020123463741Open ↗
03/27/2020123463741Open ↗
Showing 3 of 131 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS44
07/07/2020123411708Open ↗
03/27/2020123463741Open ↗
03/02/2020122114149Open ↗
Showing 3 of 44 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
10/06/2022123763150Open ↗
09/24/2021123763150Open ↗
06/05/2020140907026Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
09/24/2021123763150Open ↗
04/08/2021140907026Open ↗
02/02/2021140927077Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
07/17/2020140927077Open ↗
06/05/2020140907026Open ↗
Showing 2 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
09/02/2026M00670808-I1Open ↗
▸Inspections & Test Reports25
▸BISTECHNICAL REPORT: RESPONSIBILITY17
12/27/2022123763141Open ↗
10/06/2022123763150Open ↗
09/24/2021123763150Open ↗
Showing 3 of 17 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸Approvals, Objections & Sign-offs224
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST143
10/06/2022123763150Open ↗
05/05/2022122843842Open ↗
04/20/2022122286365Open ↗
Showing 3 of 143 on file for this type
▸BISADMINISTRATIVE OBJECTIONS46
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 46 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION18
12/15/2022123763141Open ↗
09/08/2021122397147Open ↗
Showing 2 of 18 on file for this type
▸BISSUPERSEDING LETTER8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
03/27/2020123690158Open ↗
Showing 1 of 5 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFLAME SPREAD/FIRE LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP Variance (V5) letter1
08/24/2026M01167368-I1Open ↗
▸Cost, Insurance & Ownership324
▸BISCOST AFFIDAVIT316
04/18/2022122286365Open ↗
04/18/2022122286365Open ↗
11/09/2021122286365Open ↗
Showing 3 of 316 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW38
12/27/2022123763141Open ↗
10/06/2022123763150Open ↗
05/04/2022122843842Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms359
▸BISEFILING COVER SHEET184
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 184 on file for this type
▸BISBOROUGH INTAKE FORM110
12/16/2022123763141Open ↗
12/09/2022123763141Open ↗
05/01/2020123690158Open ↗
Showing 3 of 110 on file for this type
▸BISADDITIONAL INFORMATION58
12/02/2022123763141Open ↗
04/05/2022123763150Open ↗
03/22/2022123763141Open ↗
Showing 3 of 58 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
07/17/2020140927077Open ↗
06/05/2020140907026Open ↗
Showing 2 of 7 on file for this type
▸Other Documents15
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
06/05/2020140907026Open ↗
03/27/2020123463741Open ↗
Showing 2 of 8 on file for this type
▸BISPLOT DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWManufacturer's Specifications2
08/13/2026M01275080-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWCalculations2
08/13/2026M01205919-I1Open ↗
08/13/2026M01275080-I1Open ↗