| Owner | Filings | Most Recent |
|---|---|---|
| ONE LINCOLN PLAZA CONDOMINIUM | 99 | 07/08/2026 |
| LINCOLN PLAZA CONDO | 3 | 03/22/2026 |
| BROADWAY AND 64 PARKING L | 4 | 03/22/2026 |
| NORTH SHORE NEON SIGN CO | 2 | 03/22/2026 |
| OGDEN CAPITAL PROPERTIES LLC | 9 | 03/22/2026 |
| 1 LINCOLN PLAZA CONDO | 6 | 03/22/2026 |
| ONE LINCOLN PLAZA CONDIMU | 1 | 03/22/2026 |
| OGDEN CAP PROPERTIES | 270 | 03/22/2026 |
| MILFORD MGMT GROUP | 2 | 03/22/2026 |
| MILFORD MANAGEMENT | 10 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| MG ENGINEERING D.P.C. | 12 | 09/01/2026 |
| MARCO GIARDINA | 1 | 08/26/2026 |
| MONTROY ARCHITECTURE PLLC | 4 | 06/12/2026 |
| ROSENWASSER/GROSSMAN CONSULTING ENG | 7 | 04/15/2026 |
| RLM ENGINEERING PLLC | 7 | 03/26/2026 |
| JOCK DEBOER, AIA | 2 | 03/26/2026 |
| WSP | 7 | 03/20/2026 |
| FANG ARCHITECT | 3 | 02/26/2026 |
| PATTI & ANTHES CONSULTING ENGINEERS | 8 | 11/12/2025 |
| JOHN F. GIUSEFFI, ARCHITECT, PC | 3 | 11/10/2025 |
| FXCOLLABORATIVE ARCHITECTS LLP | 1 | 08/13/2025 |
| ARRA ARCHITECTURE | 2 | 06/30/2025 |
| KONOSKI ENGINEERING PLLC | 1 | 06/06/2025 |
| STEVEN R. SAVINO ARCHITECT PC | 2 | 05/09/2025 |
| RONALD VILLANO ARCHITECT PC | 3 | 04/09/2025 |
| HUDSON UNION ARCHITECTURE STUDIO | 4 | 11/13/2024 |
| ALTIERISEBORWIEBER LLC | 5 | 10/07/2024 |
| SHADOW ARCHITECT PC | 2 | 09/26/2024 |
| RMM DESIGN STUDIO | 2 | 09/16/2024 |
| TDM CONSULTING ENGINEER | 1 | 04/26/2023 |
| ENGINEERING PROFESSIONAL SERVICE P. | 2 | 02/28/2023 |
| BOJIDAR KADIEV ARCHITECT | 2 | 01/31/2023 |
| STUDIO PPARK LLC | 4 | 01/20/2023 |
| CHRISTOFF:FINIO ARCHITECTURE | 2 | 01/10/2023 |
| BILLAH ENGINEERING PLLC | 3 | 12/15/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| KC EXPEDITING | 4 | 03/21/2026 |
| ARCHETYPE CONSULTANTS | 14 | 03/21/2026 |
| SPRING SCAFFOLDING LLC | 12 | 03/21/2026 |
| CLARKE CONSTRUCTION CONSULTANTS | 10 | 03/21/2026 |
| NOEL BUILDING CONSULTING INC | 8 | 03/21/2026 |
| METROPOLIS GROUP INC | 84 | 03/21/2026 |
| A+ EXPEDITING | 2 | 03/21/2026 |
| HLZAE | 2 | 03/21/2026 |
| ECDESIGN STUDIO | 6 | 03/21/2026 |
| KUSHNER STUDIOS | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| SPRING SCAFFOLDING LLC | General Contractor | 16 | 07/08/2026 |
| TACONIC BUILDERS INC | General Contractor | 13 | 07/08/2026 |
| EMCOR SERVICES NY/NJ INC | General Contractor | 10 | 07/08/2026 |
| STRUCTURE TONE, LLC | General Contractor | 10 | 07/08/2026 |
| ARCHSTONE BUILDERS LLC | General Contractor | 10 | 07/08/2026 |
| CPM BUILDERS INC | General Contractor | 9 | 07/08/2026 |
| DONATO PLUMBING, INC | Plumbing | 8 | 07/08/2026 |
| LAKE CONTRACTING LLC | General Contractor | 7 | 07/08/2026 |
| RAEL AUTOMATIC SPR.CO INC | Fire Protection | 4 | 07/08/2026 |
| VEZANDIO CONTRACTING CORP | General Contractor | 4 | 07/08/2026 |
| TOWER FIRE PROTECTION INC | Fire Protection | 4 | 07/08/2026 |
| MACRO CONSTRUCTION INC | General Contractor | 3 | 07/08/2026 |
| JOSEPH RIZZUTI | General Contractor | 3 | 03/21/2026 |
| COMPLEX DEVELOPMENT INC | General Contractor | 2 | 07/08/2026 |
| PAUL QUINN PLBG & HTG INC | Plumbing | 2 | 07/08/2026 |
| CM PLUMBING INC | Plumbing | 2 | 07/08/2026 |
| WATER DYNAMIC P & H CORP | Plumbing | 2 | 07/08/2026 |
| KJK ELECTRIC INC | Electrical | 2 | 03/22/2026 |
| KG SPRINKLER CORP | Fire Protection | 2 | 07/08/2026 |
| ARIANA CONTRACTING INC | Fire Protection | 2 | 06/28/2026 |
| ROLAND EDWARDS | Electrical | 1 | 03/21/2026 |
| ROCKMOR ELEC. ENTERPR INC | Electrical | 1 | 03/22/2026 |
| HAMILTON WAYNE | Electrical | 1 | 03/21/2026 |
| RICHARD SOBEL | Electrical | 1 | 03/21/2026 |
| CLUNE CONSTRUCTION CO LP | General Contractor | 1 | 04/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| MEP INSPECTIONS, INC | 1102 | 38 | 09/01/2026 |
| MG ENGINEERING D.P.C. | 8546 | 4 | 04/23/2026 |
| METRIC CONSULTING AND INS | 1803 | 6 | 04/15/2026 |
| JOCK DEBOER, AIA - SIA | 7008 | 2 | 03/26/2026 |
| SHAHRISH SHUVO ENGINEERIN | 8524 | 10 | 03/20/2026 |
| FANG ARCHITECT | 5513 | 3 | 02/26/2026 |
| HUDSON PEAKS CONSULTING L | 8381 | 1 | 08/29/2025 |
| KONOSKI ENGINEERING PLLC | 9111 | 1 | 06/06/2025 |
| ASE ENGINEERING PLLC | 5785 | 1 | 04/09/2025 |
| STEVEN R. SAVINO ARCHIT | 1216 | 1 | 03/24/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sign | Signed-off | ACTIVE SIGNS INC | 09/10/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 05/27/2026 |
| DOB NOW | Structural | Permit Issued | MEDCON SERVICES, LLC | 01/07/2026 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 01/02/2026 |
| DOB NOW | Sprinklers | Permit Issued | H M SPRINKLER INC | 12/26/2025 |
| DOB NOW | Plumbing | Signed-off | HYDRO PLBG & HTG CORP | 12/24/2025 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING, INC | 12/23/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | TACONIC BUILDERS INC | 12/16/2025 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 11/19/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 11/19/2025 |
| DOB NOW | Plumbing | Signed-off | DONATO PLUMBING, INC | 11/12/2025 |
| DOB NOW | Sprinklers | Signed-off | RAEL AUTOMATIC SPR.CO INC | 11/06/2025 |
| DOB NOW | Sprinklers | Signed-off | RAEL AUTOMATIC SPR.CO INC | 11/06/2025 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 10/31/2025 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 10/29/2025 |
| DOB NOW | Plumbing | Signed-off | AMM GEN'L CONTRACTING INC | 10/17/2025 |
| DOB NOW | General Construction | Signed-off | LXC CONSTRUCTION INC | 10/17/2025 |
| DOB NOW | General Construction | Signed-off | CLUNE CONSTRUCTION CO LP | 10/08/2025 |
| DOB NOW | Foundation | Signed-off | MEDCON SERVICES, LLC | 10/03/2025 |
| DOB NOW | Mechanical Systems | Signed-off | MEDCON SERVICES, LLC | 10/01/2025 |
| DOB NOW | General Construction | Permit Issued | MEDCON SERVICES, LLC | 10/01/2025 |
| DOB NOW | Construction Fence | Signed-off | MEDCON SERVICES, LLC | 10/01/2025 |
| DOB NOW | Sprinklers | Signed-off | ARIANA CONTRACTING INC | 08/28/2025 |
| DOB NOW | Plumbing | Signed-off | COPPER MECHANICAL INC | 08/28/2025 |
| DOB NOW | Mechanical Systems | Signed-off | MEDCON SERVICES, LLC | 08/28/2025 |
| DOB NOW | Standpipe | Signed-off | ARIANA CONTRACTING INC | 08/28/2025 |
| DOB NOW | General Construction | Signed-off | JOSEPH RIZZUTI | 08/12/2025 |
| DOB NOW | Sign | Signed-off | ENRICO PASSARO | 08/01/2025 |
| DOB NOW | Sprinklers | Signed-off | H M SPRINKLER INC | 07/30/2025 |
| DOB NOW | Plumbing | Signed-off | DONATO PLUMBING, INC | 07/30/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 07/28/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 07/15/2025 |
| DOB NOW | Construction Fence | Signed-off | MEDCON SERVICES, LLC | 07/14/2025 |
| DOB NOW | General Construction | Permit Issued | MEDCON SERVICES, LLC | 07/09/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 07/08/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | SAMIRO SERVICES INC | 06/30/2025 |
| DOB NOW | Plumbing | Signed-off | HYDRO PLBG & HTG CORP | 06/06/2025 |
| DOB NOW | Plumbing | Signed-off | SUPERIOR PLUMBING & HEATI | 05/28/2025 |
| DOB NOW | General Construction | Permit Issued | LAKE CONTRACTING LLC | 05/22/2025 |
| DOB NOW | General Construction | Signed-off | TOMAK GROUP | 05/12/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/20/2026 | Permit Issued | STRUCTURE TONE, LLC | Air Conditioning Systems | Cooling |
| 11/12/2025 | Permit Issued | STRUCTURE TONE, LLC | Air Conditioning Systems | Cooling Climatemaster SC-024 23,700 BTU · Wshp ×2 |
| 11/01/2024 | Permit Issued | EMCOR SERVICES NY/NJ INC | Cooling Towers | Cooling Tower Baltimore Aircoil S3E-8518-07P/V 2,733 tons · Cooling Tower ×6 |
| 04/05/2022 | Signed-off | ARCHSTONE BUILDERS LLC | Air Conditioning Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/23/2026 | Signed-off | ARIANA CONTRACTING INC | 212 heads, 2 outlets |
| 11/12/2025 | Permit Issued | KG SPRINKLER CORP | 93 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/01/2026 | Signed-off | COPPER PLUMBING INC | Gas, Water/Sanitary |
| 04/23/2026 | — | — | — |
| 11/12/2025 | Permit Issued | DONATO PLUMBING, INC | Water/Sanitary |
| 11/06/2025 | Signed-off | DONATO PLUMBING, INC | Water/Sanitary |
| 10/07/2024 | Permit Issued | DONATO PLUMBING, INC | Gas, Water/Sanitary |
| 11/02/2022 | Permit Issued | DONATO PLUMBING, INC | Gas, Water/Sanitary |
| 12/10/2021 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/28/2026 | Permit Issued | WCK ELECTRIC CORP. | General Wiring |
| 06/15/2026 | Permit Issued | JURGEN H. WRIEDT ELEC INC | General Wiring, Lighting |
| 04/02/2026 | Complete | KJK ELECTRIC INC | General Wiring |
| 03/10/2026 | Permit Issued | TUXEDO ELEC'L CONTR'G INC | — |
| 02/16/2026 | Permit Issued | GREEN APPLE ELECL SVCS LL | General Wiring |
| 01/09/2026 | Permit Issued | KJK ELECTRIC INC | General Wiring |
| 01/08/2026 | Permit Issued | FREEDOM ELECTRIC & DATA | General Wiring |
| 10/15/2025 | Permit Issued | THE METRO GROUP ELECTRIC | General Wiring |
| 08/12/2025 | Permit Issued | FREEDOM ELECTRIC & DATA | General Wiring |
| 06/29/2025 | Complete | SUNBIRD ELECTRICAL CONTR | General Wiring |
| 05/21/2025 | Complete | LUNA NYC ELECTRIC CORP | General Wiring |
| 03/26/2024 | Complete | E-J ELEC. INSTALLATION CO | General Wiring |
| 02/05/2024 | Complete | SD ELECTL DIVISION NYC CO | General Wiring |
| 10/18/2023 | Complete | D.R.P. ELEC'L CONTRG INC | General Wiring |
| 07/10/2023 | Complete | LTC ELEC'L CONTR'G LLC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/15/2026 | Permit Issued | CPM BUILDERS INC | Steel, Concrete, Masonry |
| 06/17/2025 | Signed-off | STRUCTURE TONE, LLC | 1 scope_items |
| 12/17/2024 | — | — | Steel |
| 01/31/2022 | Signed-off | EMCOR SERVICES NY/NJ INC | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/15/2026 | Permit Issued | CPM BUILDERS INC | Tenant Protection Plan 72 Hour |
| 04/13/2026 | Permit Issued | CPM BUILDERS INC | Tenant Protection Plan 72 Hour |
| 08/13/2025 | Signed-off | CLUNE CONSTRUCTION CO LP | Tenant Protection Plan 72 Hour |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/10/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/11/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 06/08/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 06/05/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 05/18/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 05/18/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/27/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/27/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/27/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/27/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 04/22/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/16/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/15/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/10/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/03/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/01/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 03/18/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/12/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 02/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/05/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/30/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 01/30/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/29/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/16/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 12/17/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/01/2026 | Post-installed Anchors | Nicolas Crosetto | special |
| 09/01/2026 | Fire-Resistant Penetrations and Joints | Nicolas Crosetto | special |
| 09/01/2026 | Energy Code Compliance Inspections | Nicolas Crosetto | progress |
| 09/01/2026 | Tenant Protection Plan Compliance | — | special |
| 07/17/2026 | Energy Code Compliance Inspections | Nicolas Crosetto | progress |
| 07/17/2026 | Post-installed Anchors | Nicolas Crosetto | special |
| 07/17/2026 | Fire-Resistant Penetrations and Joints | Nicolas Crosetto | special |
| 07/17/2026 | Tenant Protection Plan Compliance | — | special |
| 07/13/2026 | Post-installed Anchors | Nicolas Crosetto | special |
| 07/13/2026 | Fire-Resistant Penetrations and Joints | Nicolas Crosetto | special |
| 07/13/2026 | Tenant Protection Plan Compliance | — | special |
| 07/13/2026 | Energy Code Compliance Inspections | Nicolas Crosetto | progress |
| 06/23/2026 | Sprayed fire-resistant materials | Nicolas Crosetto | special |
| 06/23/2026 | Structural Cold-Formed Steel | SAMI HAJJAR P.E | special |
| 06/23/2026 | Final | Nicolas Crosetto | progress |
| 06/23/2026 | Masonry | SAMI HAJJAR P.E | special |
| 06/23/2026 | Structural Steel - Welding | SAMI HAJJAR P.E | special |
| 06/23/2026 | Structural Stability – Alterations of existing buildings | SAMI HAJJAR P.E | special |
| 06/23/2026 | Post-installed Anchors | SAMI HAJJAR P.E | special |
| 06/23/2026 | Concrete - Cast-In-Place | SAMI HAJJAR P.E | special |
| 06/23/2026 | Fire-Resistant Penetrations and Joints | Nicolas Crosetto | special |
| 06/23/2026 | Tenant Protection Plan Compliance | Nicolas Crosetto | special |
| 06/23/2026 | Structural Steel - High Strength Bolting | SAMI HAJJAR P.E | special |
| 06/23/2026 | Structural Steel - Details | SAMI HAJJAR P.E | special |
| 06/12/2026 | Tenant Protection Plan Compliance | Nicolas Crosetto | special |