← Back
BuildNYC
Elevator apt, semi-fireproof without stores
1901 AVENUE P
BROOKLYN · Midwood · BIN 3182051
💬 Discuss this project
1936Year Built
6Stories
D1Building Class
R7AZoning
70,450 sfGross Floor Area
64Units
LL97 CoveredRent Stabilized29 Active Violations 1 old, status unconfirmed ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 1901 Avenue Realty · 14,000 sf lot · 5.03 FAR built · Flood zone X
Locations of Work
ArchitectureEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 6Exterior facade repair and lintel replacement1p · 1 filing · 9 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
BasementExterior facade repair and lintel replacement2p · 1 filing · 9 docs
Site & exteriorExterior facade repair and lintel replacement5p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1901 Ave Realty703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ashraf211/26/2021
Mohammad Ahead, PE110/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sheikh Expediting403/21/2026
Arsenal Building Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M & J Construction of USAGeneral Contractor407/08/2026
Milicia ElectricGeneral Contractor203/21/2026
Joseph Ferrigno Plumbing HeatgPlumbing103/21/2026
J & G Construction ServicesScaffold107/08/2026
Lamak's ConstructionGeneral Contractor110/26/2011
P.J.B. ContractingGeneral Contractor111/02/2011
Tara BuildersGeneral Contractor207/25/2016
Vertical SolutionsGeneral Contractor105/13/2014
W G ConstructionGeneral Contractor112/09/1999
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ashraf1973411/26/2021
Building Lifecycle
06/17/2026
Elevator Category 1 inspection report filed
04/06/2026
Boiler inspection report filed
Initial · no defects · Accepted
10/20/2025
VC17: failed to obtain and/or produce required certificate of fitness for (fire protection system). VC5: failed to (maintain/produce) records for…
FDNY_NOV violation · closed
05/08/2025
VC20: failed to conduct required (initial/periodic) inspection or test of water based fire protection system at premises.
FDNY_NOV violation · closed
05/07/2025
Boiler inspection report filed
Initial · no defects · Accepted
174 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedM & J Construction of USA11/29/2021
DOB NOWGeneral ConstructionPermit IssuedM & J Construction of USA11/16/2021
DOB NOWSidewalk ShedSigned-offJ & G Construction Services10/13/2021
BISOTISSUEDTara Builders07/25/2016
BISMHISSUEDTara Builders07/25/2016
BISOTISSUEDMilicia Electric03/27/2015
BISMHISSUEDMilicia Electric03/27/2015
BISMHISSUEDVertical Solutions05/13/2014
BISEQISSUEDP.J.B. Contracting11/02/2011
BISOTISSUEDLamak's Construction10/26/2011
BISOTISSUEDW G Construction12/09/1999
BISPLISSUEDJoseph Ferrigno Plumbing and Heatg04/16/1992
BISFBISSUEDStar Industrial Service03/20/1992
1 project · most recent 10/12/2021
FiledStatusContractorScope
10/12/2021Permit IssuedRichard Neu—
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
11/23/2021MasonryAKM HOQUEspecial
11/23/2021Structural Stability – Alterations of existing buildingsAKM HOQUEspecial
11/23/2021FinalJay Kaviprogress
69 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account