← Back
Public elementary, junior or senior high
J.h.s. 050 John D. Wells
191 SOUTH 3 STREET · Williamsburg · BIN 3063128
💬 Discuss this project
1920Year Built
5Stories
W1Building Class
R6Zoning
162,600 sfGross Floor Area
1Units
LL97 Covered7 Open Violations 3 unresolved · 4 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 48,840 sf lot · 3.33 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction39p · 1 filing · 20 docs
Floor 26p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
Site & exteriorUnder Construction61p · 7 filings · 20 docs
Filed — no permit issued20p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY8709/23/2026
NYC DEPARTMENT OF EDUCATION403/22/2026
DEPT OF EDUC. JHS 50203/22/2026
DEPARTMENT OF EDUCATION603/22/2026
DEPARTMENT OF EDUCATION 0103/22/2026
D.O.E. JHS50 0403/22/2026
DEPT OF EDUCATION JHS50203/22/2026
DOE 040203/22/2026
DOE JHS 50 040303/22/2026
JHS 50 DOE503/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STV1803/21/2026
PRECISION 3SIXTY NYC, INC1203/21/2026
DSENY ENGINEERING SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MARIC MECHANICAL INCGeneral Contractor3407/08/2026
BTF CONSTRUCTION LLCGeneral Contractor1707/08/2026
KEL-TECH CONSTRUCTION INCGeneral Contractor909/23/2026
FRANCIS RICHARDSElectrical503/21/2026
EMPIRE CONTROL ABATEMENTGeneral Contractor403/21/2026
LATTY'S GEN PLBG CONT CORPlumbing207/08/2026
FERRITO, ROBERTElectrical103/21/2026
I.M.P. PLBG. & HTG. CORPPlumbing107/08/2026
WIDE FLANGE INCElectrical103/21/2026
JOHN HERRICKElectrical103/21/2026
JOSHUA ANDERSONElectrical103/21/2026
LCJ ELEC'L CONTR'S INCElectrical103/22/2026
MECHANICAL ELECTR'L CORP.Electrical103/22/2026
TRAVALJA, SILVANOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FUTURE TECH CONSULTANTS O5891102/24/2026
SOCOTEC ENGINEERING4983202/24/2026
JPC LOGISTICS DBA JPCL EN351111/11/2025
MUNICIPAL TESTING LABORAT230911/15/2024
Building Lifecycle
All (234)Filed (32)Permit Issued (51)Signed Off (6)Violation (60)Inspection (7)Objection (48)Special Inspection (30)
09/22/2026
Permit issued — Sidewalk Shed
B01267253-I1-SH
06/03/2026
Violation issued (ECB, open)
Construction
06/03/2026
Violation issued (ECB, open)
Construction
06/03/2026
Violation issued (ECB, open)
Construction
05/28/2026
Signed off — Alteration
K050_Proposed work to remove existing roof drain and replace with new.
B00580204-I1
05/28/2026
Signed off — Alteration
K050_Proposed work to remove existing roof drain and replace with new.
B00580204-S1
05/11/2026
Permit issued — Sidewalk Shed
B08001662-I1-SH
03/26/2026
Permit issued — Sidewalk Shed
B08001662-I1-FN
03/26/2026
Permit issued — Sidewalk Shed
B08001662-I1-SF
03/26/2026
Permit issued — Mechanical Systems
B08001662-S2-MS
03/24/2026
Objection resolved — Addressed
03/17/2026
Special inspection requirement — Concrete - Cast-In-Place
Noel Tolentino
02/26/2026
Objection raised — Other
02/24/2026
Filed — Alteration
K050_Proposed work to remove existing roof drain and replace with new.
B00580204-P6
02/17/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/13/2025
Signed off — Alteration
SUBMITTED ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (SCAFFOLD - 250-SF) , IN CONJUNCTION WITH DOB#B00580204, NO CHANGE IN USE, OCCUPANCY OR EGRESS. CONTRACTOR TO USE NEWLY APPROVED EGRESS PLAN.
B08039333-I1
11/11/2025
Filed — Alteration
B01301101-I1
11/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Asma Hashmi
11/11/2025
Special inspection requirement — Maintenance information
Asma Hashmi
11/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
Asma Hashmi
11/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
Asma Hashmi
10/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/17/2025
Signed off — Alteration
SUBMITTED ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (FENCE - 60 LF) , IN CONJUNCTION WITH DOB# B00580204 NO CHANGE IN USE, OCCUPANCY OR EGRESS.
B08039317-I1
10/14/2025
Special inspection requirement — Post-installed Anchors
Asma Hashmi
10/14/2025
Special inspection requirement — Energy Code Compliance Inspections
Asma Hashmi
10/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Asma Hashmi
10/10/2025
Special inspection requirement — Mechanical Systems
Asma Hashmi
10/10/2025
Special inspection requirement — Final
Asma Hashmi
10/07/2025
Violation issued (FDNY_ORDER, closed)
10/07/2025
Violation issued (FDNY_ORDER, closed)
10/07/2025
Violation issued (FDNY_ORDER, closed)
10/07/2025
Violation issued (FDNY_ORDER, closed)
10/07/2025
Violation issued (FDNY_ORDER, closed)
10/07/2025
Violation issued (FDNY_ORDER, closed)
10/07/2025
Violation issued (FDNY_ORDER, closed)
10/07/2025
Violation issued (FDNY_ORDER, closed)
10/07/2025
Violation issued (FDNY_ORDER, closed)
10/07/2025
Violation issued (FDNY_ORDER, closed)
10/07/2025
Violation issued (FDNY_ORDER, closed)
10/01/2025
Permit issued — Sidewalk Shed
B01267253-I1-SH
09/23/2025
Signed off — Alteration
SUBMITTED ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (SHED - 28 LF) , IN CONJUNCTION WITH DOB# B00580204 NO CHANGE IN USE, OCCUPANCY OR EGRESS. CONTRACTOR TO USE APPROVED EGRESS PLAN AS PER CONTRACT DOCUMENTS.
B08039327-I1
09/09/2025
Objection resolved — Addressed
08/26/2025
Objection raised — Other
08/19/2025
Filed — Alteration
SH/JHS50K - FOR TEMPORARY CONSTRUCTION EQUIPMENT (EMERGENCY SHED)SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO LLW # 142835, NO CHANGE IN USE,OCCUPANCY OR EGRESS
B01267253-I1
08/15/2025
Violation issued (FDNY_ORDER, closed)
08/15/2025
Violation issued (FDNY_ORDER, closed)
08/14/2025
Special inspection requirement — Structural Steel - Details
Noel Tolentino
08/14/2025
Special inspection requirement — Lighting controls
Noel Tolentino
08/14/2025
Special inspection requirement — Exterior lighting power
Noel Tolentino
08/14/2025
Special inspection requirement — Masonry
Noel Tolentino
08/14/2025
Special inspection requirement — Post-installed Anchors
Noel Tolentino
08/14/2025
Special inspection requirement — Structural Steel - Welding
Noel Tolentino
08/14/2025
Special inspection requirement — Final
Noel Tolentino
08/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Noel Tolentino
08/13/2025
Permit issued — General Construction
B00580204-I1-GC-CX
08/13/2025
Permit issued — Supported Scaffold
B08039333-I1-SF
08/13/2025
Permit issued — Construction Fence
B08039317-I1-FN
Latest 60 of 234 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedKEL-TECH CONSTRUCTION INC09/22/2026
DOB NOWSidewalk ShedPermit IssuedMARIC MECHANICAL INC05/11/2026
DOB NOWSidewalk ShedPermit IssuedMARIC MECHANICAL INC03/26/2026
DOB NOWSidewalk ShedPermit IssuedMARIC MECHANICAL INC03/26/2026
DOB NOWMechanical SystemsPermit IssuedMARIC MECHANICAL INC03/26/2026
DOB NOWSidewalk ShedPermit IssuedKEL-TECH CONSTRUCTION INC10/01/2025
DOB NOWGeneral ConstructionSigned-offBTF CONSTRUCTION LLC08/13/2025
DOB NOWSupported ScaffoldSigned-offBTF CONSTRUCTION LLC08/13/2025
DOB NOWConstruction FenceSigned-offBTF CONSTRUCTION LLC08/13/2025
DOB NOWPlumbingSigned-offLATTY'S GEN PLBG CONT COR08/04/2025
DOB NOWSupported ScaffoldPermit IssuedMARIC MECHANICAL INC04/07/2025
DOB NOWMechanical SystemsPermit IssuedMARIC MECHANICAL INC03/19/2025
DOB NOWSupported ScaffoldPermit IssuedMARIC MECHANICAL INC03/19/2025
DOB NOWSidewalk ShedSigned-offBTF CONSTRUCTION LLC03/13/2025
DOB NOWConstruction FenceSigned-offBTF CONSTRUCTION LLC03/12/2025
DOB NOWSupported ScaffoldPermit IssuedMARIC MECHANICAL INC01/22/2025
DOB NOWMechanical SystemsPermit IssuedMARIC MECHANICAL INC01/21/2025
DOB NOWSupported ScaffoldPermit IssuedMARIC MECHANICAL INC01/21/2025
DOB NOWConstruction FencePermit IssuedMARIC MECHANICAL INC01/17/2025
DOB NOWGeneral ConstructionSigned-offBTF CONSTRUCTION LLC12/31/2024
DOB NOWSupported ScaffoldSigned-offBTF CONSTRUCTION LLC12/17/2024
DOB NOWPlumbingSigned-offLATTY'S GEN PLBG CONT COR08/07/2024
DOB NOWPlumbingPermit IssuedI.M.P. PLBG. & HTG. CORP08/01/2024
DOB NOWGeneral ConstructionPermit IssuedEMPIRE CONTROL ABATEMENT07/24/2024
DOB NOWMechanical SystemsPermit IssuedEMPIRE CONTROL ABATEMENT07/24/2024
DOB NOWSidewalk ShedPermit IssuedMARIC MECHANICAL INC06/21/2024
DOB NOWMechanical SystemsPermit IssuedMARIC MECHANICAL INC04/09/2024
DOB NOWSidewalk ShedPermit IssuedMARIC MECHANICAL INC04/09/2024
DOB NOWSidewalk ShedSigned-offBTF CONSTRUCTION LLC01/25/2024
DOB NOWStructuralSigned-offBTF CONSTRUCTION LLC12/18/2023
DOB NOWSupported ScaffoldSigned-offBTF CONSTRUCTION LLC12/18/2023
DOB NOWConstruction FenceSigned-offBTF CONSTRUCTION LLC12/13/2023
DOB NOWSidewalk ShedPermit IssuedMARIC MECHANICAL INC04/05/2023
DOB NOWSidewalk ShedPermit IssuedMARIC MECHANICAL INC04/05/2023
DOB NOWSupported ScaffoldPermit IssuedMARIC MECHANICAL INC04/05/2023
DOB NOWSidewalk ShedPermit IssuedMARIC MECHANICAL INC04/01/2023
DOB NOWMechanical SystemsPermit IssuedMARIC MECHANICAL INC03/31/2023
DOB NOWStructuralSigned-offBTF CONSTRUCTION LLC01/17/2023
DOB NOWSidewalk ShedSigned-offBTF CONSTRUCTION LLC01/11/2023
DOB NOWSupported ScaffoldSigned-offBTF CONSTRUCTION LLC01/09/2023
+ 60 more permits on file
1 project · most recent 11/15/2024
Water/Sanitary
FiledStatusContractorScope
11/15/2024Permit IssuedI.M.P. PLBG. & HTG. CORPWater/Sanitary
20 projects · most recent 05/27/2026
General Wiring Lighting
FiledStatusContractorScope
05/27/2026CompleteGEMINI ELECTRIC CO., INC.—
02/25/2026Permit IssuedACE ELEC'L CONSTRUCTIONGeneral Wiring
09/11/2025Permit IssuedSTANCO SYSTEM ELEC'L CONT—
08/26/2025CompleteCHARAN ELEC'L ENTERP'S IN—
06/28/2024CompleteJAMES F. VOLPE ELEC'LGeneral Wiring
08/16/2023CompleteCHARAN ELEC'L ENTERP'S IN—
06/28/2023CompleteCHARAN ELEC'L ENTERP'S IN—
01/11/2023CompleteDYNAMO ELECTRICAL CORPGeneral Wiring
11/10/2022Permit IssuedTRIBECA ELECTRICAL CORP—
09/22/2022Permit IssuedLCJ ELEC'L CONTR'S INCGeneral Wiring
09/22/2022Permit IssuedLCJ ELEC'L CONTR'S INC—
03/08/2022CompleteCHARAN ELEC'L ENTERP'S IN—
10/05/2021CompleteSTANCO SYSTEM ELEC'L CONT—
01/21/2020CancelledSAMCO ELECTRIC CORP.—
09/11/2019CompleteCHARAN ELEC'L ENTERP'S IN—
1 project · most recent 09/06/2023
Steel Concrete
FiledStatusContractorScope
09/06/2023——Steel, Concrete
2 projects · most recent 08/19/2025
Sidewalk Shed Fence Scaffold
FiledStatusContractorScope
08/19/2025Permit IssuedKEL-TECH CONSTRUCTION INCSidewalk Shed
03/13/2025Permit IssuedMARIC MECHANICAL INCFence, Scaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
02/17/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/24/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/20/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/27/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/20/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 69
DateRequirementInspectorRole
03/17/2026Concrete - Cast-In-PlaceNoel Tolentinospecial
11/11/2025HVAC-R and service water heating equipmentAsma Hashmienergy_progress
11/11/2025HVAC-R and service water piping design and insulationAsma Hashmienergy_progress
11/11/2025HVAC-R and service water heating system controlsAsma Hashmienergy_progress
11/11/2025Maintenance informationAsma Hashmienergy_progress
10/14/2025Post-installed AnchorsAsma Hashmispecial
10/14/2025Fire-Resistant Penetrations and JointsAsma Hashmispecial
10/14/2025Energy Code Compliance InspectionsAsma Hashmiprogress
10/10/2025Mechanical SystemsAsma Hashmispecial
10/10/2025FinalAsma Hashmiprogress
08/14/2025Structural Stability – Alterations of existing buildingsNoel Tolentinospecial
08/14/2025Lighting controlsNoel Tolentinoenergy_progress
08/14/2025Post-installed AnchorsNoel Tolentinospecial
08/14/2025MasonryNoel Tolentinospecial
08/14/2025Structural Steel - WeldingNoel Tolentinospecial
08/14/2025Exterior lighting powerNoel Tolentinoenergy_progress
08/14/2025FinalNoel Tolentinoprogress
08/14/2025Structural Steel - DetailsNoel Tolentinospecial
03/14/2025Post-installed AnchorsNoel Tolentinospecial
03/10/2025Post-installed AnchorsNoel Tolentinospecial
11/19/2024Fire-Resistant Penetrations and JointsSTEPHEN LATUSspecial
11/14/2024Fire-Resistant Penetrations and JointsSTEPHEN LATUSspecial
11/14/2024Energy Code Compliance InspectionsCLOUD LEEprogress
11/14/2024Fire-Resistant Penetrations and JointsSTEPHEN LATUSspecial
11/14/2024HVAC-R and service water piping design and insulationCLOUD LEEenergy_progress
Latest 25 of 69.
▾Documents — 245 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch31
08/28/2026B08039317-I1Request digital key ↗
08/27/2026B08039333-I1Request digital key ↗
08/25/2026B01050351-P2Request digital key ↗
Showing 3 of 31 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00300241-I1Request digital key ↗
▸Applications & Permits3
▸BISWORK PERMIT APPLICATION3
04/16/2025322053558Open ↗
02/21/2024322053558Open ↗
02/02/2023322053558Open ↗
▸Seals & Professional Certifications71
▸DOB NOWDPL-1: Design Professional Seal & Signature32
08/28/2026B08039317-I1Open ↗
08/28/2026B08039317-P1Open ↗
08/27/2026B08039327-P1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/24/2026B01050351-P1Open ↗
09/23/2026B01050351-P2Open ↗
09/23/2026B08001662-S1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/24/2026B01050351-P1Open ↗
09/24/2026B01050351-P1Open ↗
09/01/2026B08001662-S2Open ↗
Showing 3 of 16 on file for this type
▸Safety & Tenant Protection13
▸DOB NOWNYCSCA - Approved Site Safety Plans13
08/13/2026B08039317-I1Open ↗
08/13/2026B08001662-P5Open ↗
08/13/2026B08039327-P1Open ↗
Showing 3 of 13 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/22/2026B08001662-S2Open ↗
08/18/2026B00580204-S1Open ↗
08/18/2026B00580204-P4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/25/2026B01050351-I1Open ↗
08/25/2026B01050351-S1Open ↗
08/25/2026B01050351-S2Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/15/2026B00580204-I1Open ↗
▸Approvals, Objections & Sign-offs74
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter32
08/18/2026B00580204-P2Open ↗
08/18/2026B00580204-S1Open ↗
08/18/2026B00580204-P5Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)32
08/13/2026B00929144-I1Open ↗
08/13/2026B01050351-S2Open ↗
08/13/2026B08001662-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)7
08/18/2026B00580204-S1Open ↗
08/15/2026B00580204-I1Open ↗
08/13/2026B01050351-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/13/2026B01050351-S2Open ↗
08/13/2026B01050351-S1Open ↗
08/13/2026B01050351-I1Open ↗
▸Filing & Intake Forms3
▸DOB NOWAI1 Form2
08/18/2026B00580204-S1Open ↗
08/15/2026B00580204-I1Open ↗
▸BISBOROUGH INTAKE FORM1
02/02/2023322053558Open ↗
▸Other Documents37
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal33
08/15/2026B00580204-I1Open ↗
08/14/2026B00580204-P6Open ↗
08/13/2026B08001662-P3Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWNYCSCA Exhibit 24
08/18/2026B00580204-S1Open ↗
08/15/2026B00580204-I1Open ↗
08/13/2026B08039333-I1Open ↗
Showing 3 of 4 on file for this type