| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00580204 ↗ | 191 SOUTH 3 STREET BROOKLYN | Alteration | Signed-off | 08/20/2021 | 08/13/2025 | Design STV INCORPORATED Filer STV INCORPORATED | K050_Proposed work to repair structural defects at canopy exterior wall and roof. |
| B08039317 ↗ | 191 SOUTH 3 STREET BROOKLYN | Alteration | Signed-off | 11/16/2022 | 08/13/2025 | Design MSS ENGINEERING PLLC | SUBMITTED ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (FENCE - 60 LF) , IN CONJUNCTION WITH DOB# B00580… |
| B08039333 ↗ | 191 SOUTH 3 STREET BROOKLYN | Alteration | Signed-off | 11/23/2022 | 08/13/2025 | Design MSS ENGINEERING PLLC | SUBMITTED ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (SCAFFOLD - 250-SF) , IN CONJUNCTION WITH DOB#B00… |
| B08039327 ↗ | 191 SOUTH 3 STREET BROOKLYN | Alteration | Signed-off | 11/16/2022 | 03/13/2025 | Design MSS ENGINEERING PLLC | SUBMITTED ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (SHED - 28 LF) , IN CONJUNCTION WITH DOB# B005802… |
| S08032665 ↗ | 58 SUMMIT STREET STATEN ISLAND | Alteration | Signed-off | 11/02/2022 | 08/08/2024 | Design DRG ARCHITECTS Filer CASO & ASSOCIATES,INC. | Structural work/foundation for exterior canopy self supported by steel columns |
| S01024074 ↗ | 58 SUMMIT STREET STATEN ISLAND | Alteration | Signed-off | 03/25/2024 | 06/27/2024 | Design ALPHA ENGINEERING Filer DESIGN STUDIO X | PS 001R NSTALLATION OF SUPPORT OF EXCAVATION AS SHOWN ON DRAWINGS. NO CHANGE IN USEEGRESS OROCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2… |
| Name | Projects together | Most recent |
|---|---|---|
| MSS ENGINEERING PLLC | 3 | 11/22/2023 |
| ALPHA ENGINEERING | 2 | 05/09/2025 |
| DRG ARCHITECTS | 1 | 04/10/2025 |
| STV INCORPORATED | 1 | 02/24/2026 |
| YSRAEL A. SEINUK, P.C. | 1 | 04/10/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| LATTY'S GEN PLBG CONT COR | 2 | 02/24/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| NYC SCHOOL CONSTRUCTION AUTHORITY | 6 | 02/24/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| CASO & ASSOCIATES,INC. | 1 | 04/10/2025 |
| DESIGN STUDIO X | 1 | 05/09/2025 |
| STV INCORPORATED | 1 | 02/24/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B00580204 ↗ | 191 SOUTH 3 STREET BROOKLYN | Alteration | Signed-off | 08/20/2021 | 08/13/2025 | Design STV INCORPORATED Filer STV INCORPORATED | K050_Proposed work to repair structural defects at canopy exterior wall and roof. |
| B08039317 ↗ | 191 SOUTH 3 STREET BROOKLYN | Alteration | Signed-off | 11/16/2022 | 08/13/2025 | Design MSS ENGINEERING PLLC | SUBMITTED ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (FENCE - 60 LF) , IN CONJUNCTION WITH DOB# B00580… |
| B08039333 ↗ | 191 SOUTH 3 STREET BROOKLYN | Alteration | Signed-off | 11/23/2022 | 08/13/2025 | Design MSS ENGINEERING PLLC | SUBMITTED ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (SCAFFOLD - 250-SF) , IN CONJUNCTION WITH DOB#B00… |
| B08039327 ↗ | 191 SOUTH 3 STREET BROOKLYN | Alteration | Signed-off | 11/16/2022 | 03/13/2025 | Design MSS ENGINEERING PLLC | SUBMITTED ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPORARY CONSTRUCTION EQUIPMENT (SHED - 28 LF) , IN CONJUNCTION WITH DOB# B005802… |
| S08032665 ↗ | 58 SUMMIT STREET STATEN ISLAND | Alteration | Signed-off | 11/02/2022 | 08/08/2024 | Design DRG ARCHITECTS Filer CASO & ASSOCIATES,INC. | Structural work/foundation for exterior canopy self supported by steel columns |
| S01024074 ↗ | 58 SUMMIT STREET STATEN ISLAND | Alteration | Signed-off | 03/25/2024 | 06/27/2024 | Design ALPHA ENGINEERING Filer DESIGN STUDIO X | PS 001R NSTALLATION OF SUPPORT OF EXCAVATION AS SHOWN ON DRAWINGS. NO CHANGE IN USEEGRESS OROCCUPANCY. WE SHALL COMPLY WITH CHAPTER 33 OF 2… |
| S01021274 ↗ | 58 SUMMIT STREET STATEN ISLAND | Alteration | Signed-off | 03/18/2024 | 06/17/2024 | Design ALPHA ENGINEERING | Installation of about 200 ft of Temporary Construction Fence , at the building , No change of Use or Egress Or Occupancy of the building. |
| 201196945BIS | 718 BRYANT AVENUE BRONX | — | ISSUED | 04/12/2017 | 04/12/2017 | — | OT |
| 201200084BIS | 718 BRYANT AVENUE BRONX | — | ISSUED | 04/12/2017 | 04/12/2017 | — | EQ |
| Building | Filings | Most Recent |
|---|---|---|
| 58 SUMMIT STREET ↗ | 6 | 07/08/2026 |
| 191 SOUTH 3 STREET ↗ | 17 | 07/08/2026 |