← Back
Primarily 3 family with 1 store or office
192 UNION STREET
BROOKLYN · BIN 3004510
💬 Discuss this project
1900Year Built
4Stories
S3Building Class
R6BZoning
3,400 sfGross Floor Area
4Units
Rent Stabilized67 Open Violations ▸
Primarily 3 family with 1 store or office · Owner of record: 192-194 UNION ST. LLC · 1,200 sf lot · 2.83 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof2p · 2 filings · 15 docs
Floor 110p · 2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS503/22/2026
192-194 UNION ST LLC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FL&M ENGINEERING DESIGN &INSPECTION307/19/2025
MOHAMMAD AHEAD, PE111/15/2021
SOWLAKIS ARCHITECT406/25/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
I L CONSULTING403/21/2026
JME BUILDING CONSULTING, LLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MICHAEL DEMAROGeneral Contractor403/21/2026
AD LINE NYC INCGeneral Contractor303/21/2026
J & G CONSTRUCTION SVCSGeneral Contractor303/21/2026
RAHMANN CONTRACT CO. LTD*General Contractor203/21/2026
JBJ CONCRETE RENOVATIONSGeneral Contractor107/08/2026
LIQUID PLBG & HTNG SCS INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GEIGER ENGINEERING. PC689307/19/2025
Building Lifecycle
All (96)Filed (8)Permit Issued (7)Signed Off (1)Violation (60)Inspection (2)Objection (9)Special Inspection (9)
05/06/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
09/16/2025
Violation issued (ECB, open)
Construction
08/01/2025
Objection resolved — Resolved
07/28/2025
Objection raised — Structural
07/28/2025
Objection raised — Admin
07/19/2025
Filed — Alteration
Repair to the 1 Story rear extension west exterior wall . Removing and reconstructing of the cracked upper portion , all as per plans , no change in use egress or occupancy .
B00459441-P1
06/22/2025
Special inspection requirement — Masonry
ELISHA GEIGER
06/22/2025
Special inspection requirement — Final
ELISHA GEIGER
06/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ELISHA GEIGER
06/11/2025
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, open)
I
04/12/2024
Violation issued (HPD, open)
A
11/22/2023
Violation issued (HPD, open)
I
08/31/2023
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
B00628014-I1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/27/2023
Violation issued (HPD, open)
A
11/14/2022
Violation issued (HPD, open)
I
09/27/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/21/2022
Permit issued — General Construction
B00544730-I1-GC
03/31/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/02/2022
Violation issued (HPD, open)
I
03/02/2022
Violation issued (HPD, open)
A
11/23/2021
Permit issued — Plumbing
B00491753-I1-PL
11/15/2021
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
B00628014-I1
11/15/2021
Permit issued — Sidewalk Shed
B00628014-I1-SH
11/09/2021
Permit issued — General Construction
B00582729-I1-GC
11/03/2021
Permit issued — General Construction
B00459441-I1-GC
10/01/2021
Permit issued — General Construction
B00544730-I1-GC
09/26/2021
Filed — Alteration
Facade repairs filed as per plans filed herewith. no change in use, egress or occupancy.
B00582729-I1
09/14/2021
Special inspection requirement — Final
ELISHA GEIGER
09/14/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
ELISHA GEIGER
07/01/2021
Permit issued — General Construction
B00544730-I1-GC
06/25/2021
Filed — Alteration
B00544730-I1
06/01/2021
Objection raised — Scope
06/01/2021
Objection resolved — Addressed
06/01/2021
Objection raised — Inspections
06/01/2021
Objection resolved — Addressed
06/01/2021
Objection raised — Inspections
06/01/2021
Objection resolved — Addressed
05/29/2021
Filed — Alteration
Repair to the 1 Story rear extension west exterior wall . Removing and reconstructing of the cracked upper portion , all as per plans , no change in use egress or occupancy .
B00459441-I1
05/25/2021
Filed — Alteration
FILING FOR THE ALTERATION OF GROUND FLOOR RETAIL SPACE WITH INTERIOR PARTITIONS , REPLACING MILLWORK AS PER TPPN #3 /97 .NO CHANGE IN USE , EGRESS AND OCCUPANCY .
B00464438-P1
05/22/2021
Special inspection requirement — Final
james sowlakis
04/13/2021
Violation issued (HPD, open)
A
04/09/2021
Filed — Alteration
B00491753-I1
04/09/2021
Filed — Alteration
FILING FOR THE ALTERATION OF GROUND FLOOR RETAIL SPACE WITH INTERIOR PARTITIONS , REPLACING MILLWORK AS PER TPPN #3 /97 .NO CHANGE IN USE , EGRESS AND OCCUPANCY .
B00464438-I1
01/24/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
ELISHA GEIGER
01/24/2021
Special inspection requirement — Masonry
ELISHA GEIGER
01/24/2021
Special inspection requirement — Final
ELISHA GEIGER
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/22/2018
Violation issued (HPD, closed)
I
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/15/2016
Violation issued (HPD, closed)
I
10/14/2015
Violation issued (HPD, closed)
I
10/01/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/01/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedMICHAEL DEMARO09/21/2022
DOB NOWPlumbingSigned-offLIQUID PLBG & HTNG SCS IN11/23/2021
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS11/15/2021
DOB NOWGeneral ConstructionPermit IssuedRAHMANN CONTRACT CO. LTD*11/09/2021
DOB NOWGeneral ConstructionPermit IssuedJBJ CONCRETE RENOVATIONS11/03/2021
DOB NOWGeneral ConstructionPermit IssuedMICHAEL DEMARO10/01/2021
DOB NOWGeneral ConstructionPermit IssuedAD LINE NYC INC07/01/2021
1 project · most recent 03/01/2022
General Wiring
FiledStatusContractorScope
03/01/2022CompleteL.S. ELECTRIC CORPGeneral Wiring
1 project · most recent 05/25/2021
FiledStatusContractorScope
05/25/2021——1 scope_items
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/27/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/31/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/22/2025MasonryELISHA GEIGERspecial
06/22/2025FinalELISHA GEIGERprogress
06/22/2025Structural Stability – Alterations of existing buildingsELISHA GEIGERspecial
09/14/2021FinalELISHA GEIGERprogress
09/14/2021Structural Stability – Alterations of existing buildingsELISHA GEIGERspecial
05/22/2021Finaljames sowlakisprogress
01/24/2021Structural Stability – Alterations of existing buildingsELISHA GEIGERspecial
01/24/2021MasonryELISHA GEIGERspecial
01/24/2021FinalELISHA GEIGERprogress
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch4
09/01/2026B00491753-I1Request digital key ↗
09/01/2026B00544730-I1Request digital key ↗
09/01/2026B00582729-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction4
09/01/2026B00464438-I1Request digital key ↗
09/01/2026B00464438-P1Request digital key ↗
08/21/2026B00459441-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/01/2026B00464438-I1Open ↗
09/01/2026B00464438-P1Open ↗
09/01/2026B00491753-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/23/2026B00582729-I1Open ↗
08/23/2026B00459441-I1Open ↗
08/23/2026B00459441-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/24/2026B00464438-P1Open ↗
08/23/2026B00582729-I1Open ↗
08/23/2026B00459441-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/01/2026B00464438-I1Open ↗
09/01/2026B00464438-P1Open ↗
09/01/2026B00491753-I1Open ↗
Showing 3 of 5 on file for this type