← Back
City university
Begrisch Hall
1930 SEDGWICK AVENUE · University Heights (South)-Morris Heights · BIN 2100241
💬 Discuss this project
1930Year Built
4Stories
W5Building Class
R5Zoning
631,237 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized21 Open Violations 5 unresolved · 16 paperwork only ▸FDNY Report ↗
City university · 1,347,500 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalFire ProtectionGeneralOther
Basement2p · 1 filing · 20 docs
Sub-Basement8p · 2 filings · 20 docs
Filed — no permit issued15p · 3 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CUNY DEPT OF DESIGN CONSTRUCTI1503/21/2026
DASNY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.803/21/2026
P WOLFE CONSULTANTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AKS INTERNATIONAL INCGeneral Contractor207/08/2026
GHEORGHE VOICUElectrical103/21/2026
UNIVERSAL FIRE SPR LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106205/26/2022
Building Lifecycle
All (42)Filed (7)Permit Issued (3)Signed Off (3)Violation (6)Inspection (2)Objection (6)Special Inspection (15)
07/02/2026
Filed — Alteration
X01228790-I1
10/07/2025
Objection resolved — Addressed
07/21/2025
Violation issued (FDNY_ORDER, closed)
12/26/2024
Objection raised — Other
12/09/2024
Filed — Alteration
HEREWITH FILING FOR LIKE-TO-LIKE REPLACEMENT OF EXISTING DAMPER AND/OR ACTUATOR ASSEMBLY ON ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
X01035298-I1
12/09/2024
Filed — Alteration
HEREWITH FILING FOR LIKE-TO-LIKE REPLACEMENT OF EXISTING DAMPER AND/OR ACTUATOR ASSEMBLY ON THE 3RD FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
X01025955-I1
03/26/2024
Special inspection requirement — Mechanical Systems
03/26/2024
Special inspection requirement — Post-installed Anchors
03/26/2024
Special inspection requirement — Final
03/26/2024
Special inspection requirement — Energy Code Compliance Inspections
03/26/2024
Special inspection requirement — Shutoff dampers
04/27/2023
Signed off — Alteration
General Construction work for the installation of concrete pads
X00652725-S1
04/20/2023
Objection resolved — Addressed
04/20/2023
Special inspection requirement — Final
MARK STIER
04/14/2023
Filed — Alteration
General Construction work for the installation of concrete pads
X00652725-P1
04/14/2023
Objection raised — Other
04/10/2023
Special inspection requirement — Final
04/06/2023
Signed off — Alteration
X00742485-I1
04/04/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/14/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/07/2023
Signed off — Alteration
General Construction work for the installation of concrete pads
X00652725-I1
09/13/2022
Permit issued — Sprinklers
X00742485-I1-EW-SP
08/23/2022
Permit issued — Mechanical Systems
X00652725-I1-MS
07/29/2022
Permit issued — General Construction
X00652725-S1-GC
07/20/2022
Objection resolved — Addressed
07/07/2022
Objection raised — Scope
07/05/2022
Filed — Alteration
General Construction work for the installation of concrete pads
X00652725-S1
05/26/2022
Filed — Alteration
X00742485-I1
05/12/2022
Filed — Alteration
General Construction work for the installation of concrete pads
X00652725-I1
05/12/2022
Special inspection requirement — Electrical motors and elevators
MARK STIER
05/12/2022
Special inspection requirement — Maintenance information
MARK STIER
04/08/2022
Special inspection requirement — HVAC-R and service water heating system controls
MARK STIER
04/08/2022
Special inspection requirement — Heating Systems
MARK STIER
04/08/2022
Special inspection requirement — HVAC-R and service water heating equipment
MARK STIER
04/08/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
MARK STIER
02/22/2022
Violation issued (FDNY_NOV, closed)
12/22/2021
Special inspection requirement — Mechanical Systems
MARK STIER
12/22/2021
Special inspection requirement — Final
MARK STIER
05/05/2021
Violation issued (FDNY_ORDER, closed)
11/07/2019
Violation issued (FDNY_ORDER, closed)
07/06/2018
Violation issued (FDNY_ORDER, closed)
06/21/2011
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offUNIVERSAL FIRE SPR LLC09/13/2022
DOB NOWMechanical SystemsPermit IssuedAKS INTERNATIONAL INC08/23/2022
DOB NOWGeneral ConstructionSigned-offAKS INTERNATIONAL INC07/29/2022
BISMHISSUEDAKS INTERNATIONAL INC06/23/2025
BISOTISSUEDAKS INTERNATIONAL INC06/23/2025
BISMHISSUEDAKS INTERNATIONAL INC03/27/2024
BISOTISSUEDAKS INTERNATIONAL INC03/27/2024
BISMHISSUEDAKS INTERNATIONAL INC03/27/2023
BISOTISSUEDAKS INTERNATIONAL INC03/27/2023
BISMHISSUEDAKS INTERNATIONAL INC06/10/2022
BISOTISSUEDAKS INTERNATIONAL INC03/25/2022
BISOTISSUEDAKS INTERNATIONAL INC03/30/2021
BISOTISSUEDAKS INTERNATIONAL INC05/04/2020
BISMHISSUEDACS SYSTEM ASSOCIATES INC.04/29/2020
BISOTISSUEDTDI CONSTRUCTION INC01/08/2020
BISOTISSUEDAKS INTERNATIONAL INC11/25/2019
BISMHISSUEDACS SYSTEM ASSOCIATES INC.03/27/2019
BISMHISSUEDACS SYSTEM ASSOCIATES INC.07/18/2018
BISMHISSUEDR & L HTG. & AIR COND INC07/20/2015
BISOTISSUEDSIERRA MECHANICAL CONTRACTING07/10/2015
BISMHISSUEDMARIC MECHANICAL INC01/02/2013
BISMHISSUEDMARIC MECHANICAL INC03/15/2012
BISPLISSUEDARISTA PLBG & HTG CORP01/06/2012
BISMHISSUEDMARIC MECHANICAL INC12/27/2011
2 projects · most recent 04/08/2026
Lighting General Wiring
FiledStatusContractorScope
04/08/2026CompleteOHM'S ELECTRICAL CORPLighting
07/07/2020Permit IssuedWELSBACH ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/04/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/14/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
03/26/2024Mechanical Systems—special
03/26/2024Post-installed Anchors—special
03/26/2024Final—progress
03/26/2024Energy Code Compliance Inspections—progress
03/26/2024Shutoff dampers—energy_progress
04/20/2023FinalMARK STIERprogress
04/10/2023Final—progress
05/12/2022Electrical motors and elevatorsMARK STIERenergy_progress
05/12/2022Maintenance informationMARK STIERenergy_progress
04/08/2022HVAC-R and service water heating system controlsMARK STIERenergy_progress
04/08/2022Heating SystemsMARK STIERspecial
04/08/2022HVAC-R and service water heating equipmentMARK STIERenergy_progress
04/08/2022HVAC-R and service water piping design and insulationMARK STIERenergy_progress
12/22/2021Mechanical SystemsMARK STIERspecial
12/22/2021FinalMARK STIERprogress
▾Documents — 211 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026X00742485-I1Request digital key ↗
08/24/2026X00652725-I1Request digital key ↗
08/20/2026X01035298-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits39
▸BISPLAN / WORK APPROVAL APPLICATION21
04/04/2025220683142Open ↗
03/07/2025220683142Open ↗
03/04/2025220683142Open ↗
Showing 3 of 21 on file for this type
▸BISWORK PERMIT APPLICATION10
06/10/2022220683142Open ↗
05/05/2020220683142Open ↗
01/08/2020220668855Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWLPC Approval/Permit6
08/16/2026X01228790-I1Open ↗
08/13/2026X00652725-I1Open ↗
08/13/2026X00652725-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
12/05/2022220538014Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
11/28/2022220538014Open ↗
▸Seals & Professional Certifications48
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION24
05/24/2019220683142Open ↗
05/24/2019220683142Open ↗
05/20/2019220683142Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026X00742485-I1Open ↗
08/24/2026X00652725-P1Open ↗
08/24/2026X00652725-S1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/11/2026X00652725-I1Open ↗
09/11/2026X00652725-I1Open ↗
09/11/2026X00652725-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
09/26/2018220668855Open ↗
05/15/2018220648761Open ↗
06/26/2015220465716Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
09/26/2018220668855Open ↗
05/15/2018220648761Open ↗
06/26/2015220465716Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/11/2026X00652725-I1Open ↗
09/11/2026X00652725-I1Open ↗
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE2
10/04/2012220133861Open ↗
10/04/2012220133861Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
09/28/2020220538014Open ↗
▸BISSCHEDULE B - PLUMBING1
08/24/2011220133861Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
09/26/2018220668855Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/24/2026X00742485-I1Open ↗
08/24/2026X00652725-I1Open ↗
08/15/2026X00652725-S1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
08/16/2019220683142Open ↗
05/15/2018220648761Open ↗
06/22/2016220538014Open ↗
Showing 3 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
07/20/2015220348826Open ↗
▸Energy Compliance25
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS11
05/24/2019220683142Open ↗
01/28/2019220683142Open ↗
12/24/2018220683142Open ↗
Showing 3 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
12/21/2020220648761Open ↗
12/16/2020220648761Open ↗
11/14/2017220348826Open ↗
Showing 3 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections3
11/21/2014220133861Open ↗
03/19/2014220348826Open ↗
12/31/2013220348826Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
04/23/2025220683142Open ↗
04/07/2025220683142Open ↗
▸BISTECHNICAL REPORT: ENERGY2
08/24/2011220133861Open ↗
08/24/2011220133861Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/08/2020220668855Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00652725-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
04/23/2025220683142Open ↗
04/07/2025220683142Open ↗
12/21/2020220648761Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs35
▸BISLETTERS - SUPPORTING DOCUMENTATION11
03/17/2020220668855Open ↗
05/07/2019220683142Open ↗
01/28/2019220683142Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
12/05/2022220538014Open ↗
12/21/2020220648761Open ↗
12/16/2020220648761Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/24/2026X00742485-I1Open ↗
08/24/2026X00652725-I1Open ↗
08/16/2026X01228790-I1Open ↗
Showing 3 of 7 on file for this type
▸BISLANDMARKS APPROVAL4
09/26/2018220668855Open ↗
07/10/2015220465716Open ↗
11/18/2014220391396Open ↗
Showing 3 of 4 on file for this type
▸BISLANDMARKS SIGNOFF1
12/05/2022220538014Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/24/2011220133861Open ↗
▸Cost, Insurance & Ownership17
▸BISCOST AFFIDAVIT17
11/23/2022220538014Open ↗
11/23/2022220538014Open ↗
12/21/2020220648761Open ↗
Showing 3 of 17 on file for this type
▸Filing & Intake Forms17
▸BISEFILING COVER SHEET10
01/28/2019220683142Open ↗
12/24/2018220683142Open ↗
12/11/2018220680216Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION5
04/29/2025220683142Open ↗
04/29/2025220683142Open ↗
11/14/2017220348826Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
03/17/2020220668855Open ↗
11/14/2017220348826Open ↗
▸Other Documents2
▸BISBPP - SUPPORTING DOCUMENTATION2
12/05/2022220538014Open ↗
12/05/2022220538014Open ↗