← Back
BuildNYC
Public elementary, junior or senior high
195-15 73RD AVENUE
QUEENS · BIN 4623555
💬 Discuss this project
1963Year Built
3Stories
W1Building Class
R4Zoning
86,700 sfGross Floor Area
0Units
LL97 Covered0 Active Violations
Public elementary, junior or senior high · Owner of record: NYC Department of Parks and Recreation · 234,720 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofP.S. 26QUnder Construction93p · 2 filings · 17 docs
Floor 4P.S. 26QUnder Construction94p · 2 filings · 17 docs
Floor 3P.S. 26QUnder Construction93p · 2 filings · 17 docs
Floor 2P.S. 26QUnder Construction92p · 2 filings · 17 docs
Floor 1P.S. 26QUnder Construction94p · 3 filings · 17 docs
CellarP.S. 26QUnder Construction89p · 2 filings · 17 docs
Site & exteriorNew 4-story building constructionUnder Construction18p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority8107/08/2026
Navillus103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
High Point Piping Protection203/21/2026
DI Domenico + Partners3003/21/2026
Tarek M. Zeid, P.E403/21/2026
Tarek M Zeid P E403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Navillus TileGeneral Contractor2107/08/2026
Current Fire ProtectionFire Protection907/08/2026
Navillus TileScaffold804/09/2026
S & L Plumbing & HeatingPlumbing607/08/2026
Nycom ElectricalElectrical103/22/2026
North Shore Climate ContractingGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Universal Testing and Ins4002308/18/2025
Hartland Engineering7307107/14/2021
Building Lifecycle
All (153)Filed (28)Permit Issued (46)Signed Off (3)Violation (1)Inspection (12)Objection (33)Special Inspection (30)
09/10/2026
Signed off — Alteration
SPRINKLER / STANDPIPE SYSTEM REQUIRED FOR NEW 4 STORY SCHOOL BUILDING,IN CONJUNCTION WITH NB 421899930
Q00548741-I1
06/15/2026
Permit issued — Standpipe
Q00548741-I1-EW-SD
06/15/2026
Permit issued — Sprinklers
Q00548741-I1-EW-SP
04/03/2026
Signed off — Alteration
PS 26Q - Proposed Fence and shed filed in conjunction to: 4 Story NB # 421899930 & Q00548727 & Q00594545. All as per plans filed herewith.
Q08007929-I1
03/23/2026
Permit issued — General Construction
Q00548727-S7-GC
03/20/2026
Permit issued — Structural
Q00548727-S1-GC
02/24/2026
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
02/23/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
09/08/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/19/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/18/2025
Filed — Alteration
CIVIL - SITE DRAINAGE, WATER AND SANITARY SEWER FOR NEW 4 STORY BUILDING
Q00548727-P9
08/18/2025
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
08/18/2025
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
NELSON LOPEZ
08/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
08/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
NELSON LOPEZ
08/18/2025
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
08/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
NELSON LOPEZ
08/18/2025
Special inspection requirement — Maintenance information
NELSON LOPEZ
08/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
NELSON LOPEZ
08/06/2025
Signed off — Alteration
PS 26Q - Proposed SOE filing in conjunction to: 4 Story NB # 421899930 & Q00548727 & Q00594545- All as per plans filed herewith
Q08010965-I1
05/06/2025
Permit issued — Standpipe
Q00548741-I1-EW-SP
05/06/2025
Permit issued — Standpipe
Q00548741-I1-EW-SD
03/28/2025
Permit issued — General Construction
Q00548727-S7-GC
03/28/2025
Permit issued — General Construction
Q00548727-S4-GC
03/27/2025
Permit issued — General Construction
Q00548727-S4-GC
03/27/2025
Permit issued — Structural
Q00548727-S1-GC
01/31/2025
Special inspection requirement — Concrete - Precast
NELSON LOPEZ
01/31/2025
Special inspection requirement — Subgrade Inspections
NELSON LOPEZ
01/31/2025
Special inspection requirement — Concrete - Cast-In-Place
NELSON LOPEZ
01/27/2025
Filed — Alteration
CIVIL - SITE DRAINAGE, WATER AND SANITARY SEWER FOR NEW 4 STORY BUILDING
Q00548727-P8
01/24/2025
Special inspection requirement — Subgrade Inspections
NELSON LOPEZ
01/24/2025
Special inspection requirement — Concrete - Cast-In-Place
NELSON LOPEZ
01/24/2025
Special inspection requirement — Concrete - Precast
NELSON LOPEZ
12/05/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
11/26/2024
Inspection — Pass-Final SD - Up to 9 Requested Floors
Pass
View inspection ↗
11/26/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
11/14/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
11/14/2024
Special inspection requirement — Duct leakage testing, insulation and design
NELSON LOPEZ
11/14/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
NELSON LOPEZ
11/14/2024
Special inspection requirement — Maintenance information
NELSON LOPEZ
11/14/2024
Special inspection requirement — Energy Code Compliance Inspections
NELSON LOPEZ
11/14/2024
Special inspection requirement — Chimneys and vents
NELSON LOPEZ
11/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
11/14/2024
Special inspection requirement — Mechanical Systems
NELSON LOPEZ
11/14/2024
Special inspection requirement — Post-installed Anchors
NELSON LOPEZ
11/14/2024
Special inspection requirement — Heating Systems
NELSON LOPEZ
11/14/2024
Special inspection requirement — HVAC-R and service water heating system controls
NELSON LOPEZ
11/14/2024
Special inspection requirement — HVAC-R and service water heating equipment
NELSON LOPEZ
11/14/2024
Special inspection requirement — Final
NELSON LOPEZ
11/14/2024
Special inspection requirement — Ventilation and air distribution system
NELSON LOPEZ
11/14/2024
Special inspection requirement — Shutoff dampers
NELSON LOPEZ
11/13/2024
Filed — Alteration
CIVIL - SITE DRAINAGE, WATER AND SANITARY SEWER FOR NEW 4 STORY BUILDING
Q00548727-P7
11/06/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
11/06/2024
Special inspection requirement — Concrete - Cast-In-Place
NELSON LOPEZ
11/06/2024
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
NELSON LOPEZ
11/05/2024
Filed — Alteration
CIVIL - SITE DRAINAGE, WATER AND SANITARY SEWER FOR NEW 4 STORY BUILDING
Q00548727-P2
11/04/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/01/2024
Permit issued — Boiler Equipment
Q00548727-S8-BE
10/31/2024
Objection raised — Other
10/31/2024
Objection resolved — Addressed
Latest 60 of 153 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipeSigned-offCurrent Fire Protection06/15/2026
DOB NOWSprinklersSigned-offCurrent Fire Protection06/15/2026
DOB NOWGeneral ConstructionPermit IssuedNavillus Tile03/23/2026
DOB NOWStructuralPermit IssuedNavillus Tile03/20/2026
DOB NOWSprinklersSigned-offCurrent Fire Protection I05/06/2025
DOB NOWStandpipeSigned-offCurrent Fire Protection I05/06/2025
DOB NOWGeneral ConstructionPermit IssuedNavillus Tile03/28/2025
DOB NOWGeneral ConstructionPermit IssuedNavillus Tile03/28/2025
DOB NOWGeneral ConstructionPermit IssuedNavillus Tile03/27/2025
DOB NOWStructuralPermit IssuedNavillus Tile03/27/2025
DOB NOWBoiler EquipmentSigned-offS & L Plumbing & Heating11/01/2024
DOB NOWSprinklersSigned-offCurrent Fire Protection I05/17/2024
DOB NOWStandpipeSigned-offCurrent Fire Protection I05/17/2024
DOB NOWStandpipeSigned-offCurrent Fire Protection I05/17/2024
DOB NOWMechanical SystemsSigned-offNorth Shore Climate Contracting05/15/2024
DOB NOWSidewalk ShedSigned-offNavillus Tile05/14/2024
DOB NOWGeneral ConstructionPermit IssuedNavillus Tile05/14/2024
DOB NOWSidewalk ShedSigned-offNavillus Tile05/14/2024
DOB NOWSidewalk ShedSigned-offNavillus Tile05/13/2024
DOB NOWGeneral ConstructionPermit IssuedNavillus Tile05/13/2024
DOB NOWMechanical SystemsSigned-offDW Plumbing02/28/2024
DOB NOWBoiler EquipmentSigned-offS & L Plumbing & Heating01/25/2024
DOB NOWPlumbingPermit IssuedS & L Plumbing & Heating12/12/2023
DOB NOWPlumbingPermit IssuedS & L Plumbing & Heating12/12/2023
DOB NOWStructuralPermit IssuedNavillus Tile12/12/2023
DOB NOWGeneral ConstructionPermit IssuedNavillus Tile12/11/2023
DOB NOWGeneral ConstructionPermit IssuedNavillus Tile12/11/2023
DOB NOWSidewalk ShedSigned-offNavillus Tile12/11/2023
DOB NOWConstruction FenceSigned-offNavillus Tile12/04/2023
DOB NOWSidewalk ShedSigned-offNavillus Tile11/29/2023
DOB NOWSprinklersSigned-offCurrent Fire Protection I05/31/2023
DOB NOWStandpipeSigned-offCurrent Fire Protection I05/31/2023
DOB NOWSupport of ExcavationSigned-offNavillus Tile05/10/2023
DOB NOWGeneral ConstructionPermit IssuedNavillus Tile05/10/2023
DOB NOWFoundationPermit IssuedNavillus Tile05/08/2023
DOB NOWStructuralPermit IssuedNavillus Tile02/15/2023
DOB NOWGeneral ConstructionPermit IssuedNavillus Tile02/15/2023
DOB NOWFoundationPermit IssuedNavillus Tile02/15/2023
DOB NOWGeneral ConstructionPermit IssuedNavillus Tile02/15/2023
DOB NOWPlumbingPermit IssuedS & L Plumbing & Heating01/10/2023
+ 12 more permits on file
1 project · most recent 08/18/2025
Air Conditioning Systems Associated Ducts and Piping Heating Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/18/2025Permit IssuedNavillus TileAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Refrigeration Systems
Cooling
Lg LSN363HLV3 34,200 BTU · Split System ×9
LSU363HLV3 34,200 BTU · Condensing Unit ×9
LSN243HLV3 24,000 BTU · Vrf Indoor ×3
LSU243HLV3 24,000 BTU · Condensing Unit ×3
Annexair AHU-E-09-H-C 9,800 CFM · Ahu ×3
ERP-E-09-EW05-H-C-SW-SS 10,630 CFM · Ahu ×3
ERP-E-12-EW07-H-C-SW-SS 12,660 CFM · Ahu ×3
Ventilation
Twin City Fan VC-089 500 CFM · Exhaust Fan ×12
VC-098 400 CFM · Exhaust Fan ×9
BCRD-160DHP 1,370 CFM · Exhaust Fan ×6
VC-077 100 CFM · Exhaust Fan ×6
BCRD-180D 3,000 CFM · Exhaust Fan ×3
BCRFS-090 600 CFM · Exhaust Fan ×3
BSI-135A 1,865 CFM · Exhaust Fan ×3
Loren Cook VC-089 200 CFM · Exhaust Fan ×3
Pennbarry FX24BHFT 4,250 CFM · Kitchen Exhaust ×3
Refrigeration
Arctic PACVMV0300D3-MM-VS2 360,000 CFM · Chiller ×18
PACVMC0300D3-MM-VS2 155 tons · Chiller ×3
Ducts & Piping
Heating
Indeeco 240-U1050D-D 5 kW · Electric Heater ×6
937U05000DW-D1R2 5 kW · Electric Heater ×3
240-U1038D-D 3 kW · Electric Heater ×2
1 project · most recent 04/08/2024
FiledStatusContractorScope
04/08/2024Signed-offCurrent Fire Protection I493 heads, 1 outlets
1 project · most recent 08/18/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/18/2025Signed-offS & L Plumbing & HeatingGas, Storm, Water/Sanitary
3 projects · most recent 01/06/2025
General Wiring Lighting
FiledStatusContractorScope
01/06/2025CompleteRMD ElectricGeneral Wiring, Lighting
06/02/2023CompleteNycom Electrical—
11/28/2022CompleteRMD Electric—
1 project · most recent 08/18/2025
Steel Concrete
FiledStatusContractorScope
08/18/2025Permit IssuedNavillus TileSteel, Concrete
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
02/24/2026Pass-Final SD - Up to 9 Requested FloorsPassView ↗
02/23/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
09/08/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/05/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/26/2024Pass-Final SD - Up to 9 Requested FloorsPassView ↗
11/26/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
11/14/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/06/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/04/2024Pass-Final Boiler Equipment InspectionPassView ↗
07/01/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/01/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 136
DateRequirementInspectorRole
08/18/2025HVAC-R and service water heating equipmentNELSON LOPEZenergy_progress
08/18/2025Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
08/18/2025High-Pressure Fuel-Gas Piping (Welding)NELSON LOPEZspecial
08/18/2025Post-installed AnchorsNELSON LOPEZspecial
08/18/2025Energy Code Compliance InspectionsNELSON LOPEZprogress
08/18/2025HVAC-R and service water piping design and insulationNELSON LOPEZenergy_progress
08/18/2025Maintenance informationNELSON LOPEZenergy_progress
08/18/2025HVAC-R and service water heating system controlsNELSON LOPEZenergy_progress
01/31/2025Subgrade InspectionsNELSON LOPEZspecial
01/31/2025Concrete - PrecastNELSON LOPEZspecial
01/31/2025Concrete - Cast-In-PlaceNELSON LOPEZspecial
01/24/2025Concrete - PrecastNELSON LOPEZspecial
01/24/2025Subgrade InspectionsNELSON LOPEZspecial
01/24/2025Concrete - Cast-In-PlaceNELSON LOPEZspecial
11/14/2024Maintenance informationNELSON LOPEZenergy_progress
11/14/2024HVAC-R and service water heating system controlsNELSON LOPEZenergy_progress
11/14/2024Shutoff dampersNELSON LOPEZenergy_progress
11/14/2024Ventilation and air distribution systemNELSON LOPEZenergy_progress
11/14/2024HVAC-R and service water heating equipmentNELSON LOPEZenergy_progress
11/14/2024Duct leakage testing, insulation and designNELSON LOPEZenergy_progress
11/14/2024Heating SystemsNELSON LOPEZspecial
11/14/2024Post-installed AnchorsNELSON LOPEZspecial
11/14/2024Mechanical SystemsNELSON LOPEZspecial
11/14/2024Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
11/14/2024Chimneys and ventsNELSON LOPEZspecial
Latest 25 of 136.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 26QEducationCellar, Floors 1–4, Roof
Project Q00548741 Alteration · LOC Issued · 07/15/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 242 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch24
08/25/2026Q08007929-I1Request digital key ↗
08/21/2026Q00548727-P6Request digital key ↗
08/21/2026Q00548727-S1Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
08/21/2026Q00575520-P2Request digital key ↗
08/21/2026Q00575520-P1Request digital key ↗
08/21/2026Q00575520-I1Request digital key ↗
▸Applications & Permits5
▸DOB NOWDEP Stormwater Construction Permit3
08/15/2026Q08010965-P1Open ↗
08/14/2026Q08010965-I1Open ↗
08/13/2026Q08010965-P2Open ↗
▸BISCertificate Of Occupancy Application1
11/06/2024421899930Open ↗
▸DOB NOWDEP Stormwater Maintenance Permit/Notice of Termination1
08/14/2026Q08010965-I1Open ↗
▸Seals & Professional Certifications106
▸DOB NOWSpecial Inspector Seal & Signature52
10/03/2026Q00548727-P9Open ↗
09/23/2026Q00548727-S8Open ↗
09/23/2026Q00548727-S8Open ↗
Showing 3 of 52 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature28
08/25/2026Q08007929-I1Open ↗
08/23/2026Q00548741-P2Open ↗
08/23/2026Q00548741-P1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWProgress Inspector Seal & Signature26
10/03/2026Q00548727-P9Open ↗
10/03/2026Q00548727-P9Open ↗
09/23/2026Q00548727-S8Open ↗
Showing 3 of 26 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWFDNY: Letter of No Objection1
08/13/2026Q00548727-S3Open ↗
▸Safety & Tenant Protection1
▸DOB NOWNYCSCA - Approved Site Safety Plans1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance4
▸DOB NOWPreliminary Commissioning Report Certification3
08/13/2026Q00548727-S5Open ↗
08/13/2026Q00548727-S7Open ↗
08/13/2026Q00548727-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00548727-I1Open ↗
▸Approvals, Objections & Sign-offs55
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter27
08/15/2026Q08010965-P1Open ↗
08/15/2026Q08010965-P2Open ↗
08/14/2026Q08010965-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)25
08/15/2026Q08010965-P1Open ↗
08/14/2026Q08010965-I1Open ↗
08/13/2026Q00548727-S5Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
08/14/2026Q08010965-I1Open ↗
08/13/2026Q00548727-S8Open ↗
08/13/2026Q08007929-I1Open ↗
▸Other Documents43
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal28
08/15/2026Q08010965-P1Open ↗
08/14/2026Q08010965-I1Open ↗
08/13/2026Q00548727-P4Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWNYCSCA Exhibit 210
08/14/2026Q08010965-I1Open ↗
08/13/2026Q00548727-S4Open ↗
08/13/2026Q00548727-S3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlot Diagram3
08/15/2026Q08010965-P1Open ↗
08/14/2026Q08010965-I1Open ↗
08/13/2026Q08010965-P2Open ↗
▸DOB NOWAdjoining Owners Notification1
08/14/2026Q08010965-I1Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type