← Back
Four families
197 JEFFERSON AVENUE
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3051970
💬 Discuss this project
1888Year Built
3Stories
C3Building Class
R6BZoning
4,200 sfGross Floor Area
4Units
Rent Stabilized11 Open Violations ▸FDNY Report ↗
Four families · Owner of record: JJ JEFFERSON LLC · 2,000 sf lot · 2.1 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Floor 312p · 3 filings · 20 docs
Floor 211p · 3 filings · 20 docs
Floor 110p · 3 filings · 20 docs
Cellar12p · 3 filings · 20 docs
Basement5p · 1 filing · 20 docs
Sub-Basement5p · 2 filings · 9 docs
Site & exterior7p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITED 24411407/08/2026
J G CONSTRUCTION SRVCS803/22/2026
JJ JEFFERSON LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/20/2022$1.8M—— → —$417/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS307/31/2023
SIDERIS KEFALAS ENGINEERS PC104/03/2023
MOHAMMAD AHEAD, PE103/16/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J CALIENDO ARCHITECT P C603/21/2026
ARSENAL BUILDING CONSULTANTS LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & G CONSTRUCTION SVCSGeneral Contractor603/21/2026
IVAN ROSA LLCGeneral Contractor303/21/2026
ALL PRO PLBG HTGPlumbing303/22/2026
ALL PRO PLBG & HTG INCPlumbing307/08/2026
GERALD CALIENDOElectrical203/21/2026
RICHARD NEUElectrical103/22/2026
ALL PRO PLBG & HTG INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616407/31/2023
Building Lifecycle
All (127)Filed (5)Permit Issued (5)Signed Off (3)Violation (60)Inspection (8)Objection (16)Special Inspection (30)
06/10/2025
Violation issued (HPD, closed)
A
11/27/2024
Violation issued (HPD, closed)
I
10/17/2023
Violation issued (HPD, open)
A
10/17/2023
Violation issued (HPD, open)
C
10/17/2023
Violation issued (HPD, open)
A
10/03/2023
Signed off — Alteration
HEREWITH FILING FOR HYDRAULICALLY CALCULATED SPRINKLER SYSTEM THROUGH-OUT BUILDING. FILED IN CONJUNCTION WITH ALT TYPE 1, DOB NOW #B00583809.
B00789879-I1
10/02/2023
Signed off — Alteration
B00598401-I1
09/27/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
09/27/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/05/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/23/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/21/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/18/2023
Special inspection requirement — Mechanical Systems
FAHAD FATEH
08/18/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
08/18/2023
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
08/18/2023
Special inspection requirement — Final
FAHAD FATEH
08/18/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
08/18/2023
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
08/18/2023
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
08/18/2023
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
08/18/2023
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
08/18/2023
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
08/18/2023
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
08/18/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
08/18/2023
Special inspection requirement — Permanent certificate
FAHAD FATEH
08/18/2023
Special inspection requirement — Metering
FAHAD FATEH
08/16/2023
Objection resolved — Addressed
08/16/2023
Objection resolved — Addressed
08/16/2023
Objection resolved — Addressed
08/16/2023
Objection resolved — Addressed
08/16/2023
Objection resolved — Addressed
08/07/2023
Objection resolved — Addressed
08/03/2023
Objection raised — Other
08/03/2023
Objection raised — Admin
08/03/2023
Objection raised — Scope
08/03/2023
Objection raised — Scope
08/03/2023
Objection raised — Other
08/03/2023
Objection raised — Other
07/31/2023
Filed — Alteration CO
HEREWITH FILING ALT 1 TO RESTORE CONDITIONS WITH INTERIOR RENOVATION FOR EXISTING THREE FAMILY DWELLING AND CONVERT TO PROPOSED 4 FAMILY DWELLING. PLUMBING, FENCE, AND MECHANICAL WORK TYPES FILED SEPARATELY IN DOB NOW BUILD. OBTAIN C OF O.
B00583809-P1
07/31/2023
Special inspection requirement — Permanent certificate
FAHAD FATEH
07/31/2023
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
07/31/2023
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
07/31/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/31/2023
Special inspection requirement — Mechanical Systems
FAHAD FATEH
07/31/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
07/31/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
07/31/2023
Special inspection requirement — Final
FAHAD FATEH
07/31/2023
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
07/31/2023
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
07/31/2023
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
07/31/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
07/31/2023
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
07/31/2023
Special inspection requirement — Metering
FAHAD FATEH
07/31/2023
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
05/30/2023
Signed off — Alteration
B00836730-I1
04/19/2023
Permit issued — Sprinklers
B00789879-I1-EW-SP
04/19/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/19/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/19/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offALL PRO PLBG & HTG INC04/19/2023
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC04/06/2023
DOB NOWMechanical SystemsPermit IssuedIVAN ROSA LLC04/05/2023
DOB NOWSupported ScaffoldSigned-offJ & G CONSTRUCTION SVCS03/16/2023
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS03/16/2023
BISMHISSUEDCAPEZZANO CONSTRUCTION03/26/2018
1 project · most recent 07/31/2023
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/31/2023Permit IssuedIVAN ROSA LLCAir Conditioning Systems
Cooling
Panasonic AOU36RLXFZ1 39,000 BTU · Condensing Unit ×16
2 projects · most recent 03/01/2023
General Wiring
FiledStatusContractorScope
03/01/2023CompleteRICHARD NEU—
01/18/2023CompleteRONEY ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/27/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/05/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/23/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/21/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/19/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/19/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
08/18/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/18/2023Mechanical SystemsFAHAD FATEHspecial
08/18/2023Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
08/18/2023Fire-Resistance Rated ConstructionFAHAD FATEHprogress
08/18/2023FinalFAHAD FATEHprogress
08/18/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
08/18/2023Insulation placement and R valuesFAHAD FATEHenergy_progress
08/18/2023Duct leakage testing, insulation and designFAHAD FATEHenergy_progress
08/18/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
08/18/2023Lighting in dwelling unitsFAHAD FATEHenergy_progress
08/18/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
08/18/2023Air barrier - visual inspectionFAHAD FATEHenergy_progress
08/18/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
08/18/2023Permanent certificateFAHAD FATEHenergy_progress
08/18/2023MeteringFAHAD FATEHenergy_progress
07/31/2023Permanent certificateFAHAD FATEHenergy_progress
07/31/2023Insulation placement and R valuesFAHAD FATEHenergy_progress
07/31/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
07/31/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/31/2023Mechanical SystemsFAHAD FATEHspecial
07/31/2023Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
07/31/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
07/31/2023FinalFAHAD FATEHprogress
07/31/2023Fire-Resistance Rated ConstructionFAHAD FATEHprogress
07/31/2023Air barrier - visual inspectionFAHAD FATEHenergy_progress
Latest 25 of 32.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/30/2026B00598401-I1Request digital key ↗
08/27/2026B00836730-I1Request digital key ↗
08/27/2026B00583809-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits6
▸DOB NOWLPC Approval/Permit3
08/13/2026B00583809-P1Open ↗
08/13/2026B00583809-I1Open ↗
08/13/2026B00598401-I1Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
10/26/2023321700833Open ↗
01/18/2018321700833Open ↗
▸BISWORK PERMIT APPLICATION1
03/26/2018321700833Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00583809-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/30/2026B00598401-I1Open ↗
08/27/2026B00583809-P1Open ↗
08/27/2026B00583809-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B00583809-I1Open ↗
09/01/2026B00583809-I1Open ↗
08/25/2026B00583809-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B00583809-I1Open ↗
08/25/2026B00583809-P1Open ↗
08/23/2026B00789879-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
03/26/2018321700833Open ↗
01/18/2018321700833Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/18/2018321700833Open ↗
▸BISProfessional and Owner Certification (POC3)1
01/18/2018321700833Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/18/2018321700833Open ↗
▸Safety & Tenant Protection7
▸BISTenant Protection Plan and Notes2
01/19/2018321700833Open ↗
01/18/2018321700833Open ↗
▸DOB NOWStreet Tree Checklist2
08/27/2026B00583809-I1Open ↗
08/14/2026B00583809-P1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00583809-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00583809-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00583809-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/30/2026B00598401-I1Open ↗
08/27/2026B00583809-I1Open ↗
08/14/2026B00583809-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/18/2018321700833Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/26/2018321700833Open ↗
01/18/2018321700833Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00583809-I1Open ↗
08/13/2026B00598401-I1Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
01/18/2018321700833Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
01/18/2018321700833Open ↗
01/18/2018321700833Open ↗
▸BISEFILING COVER SHEET1
01/19/2018321700833Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/27/2026B00583809-I1Open ↗
08/14/2026B00583809-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00583809-I1Open ↗