← Back
Elevator apt, semi-fireproof without stores
1996 ANTHONY AVENUE
BRONX · BIN 2007778
💬 Discuss this project
1941Year Built
6Stories
D1Building Class
R7-1Zoning
56,400 sfGross Floor Area
56Units
LL97 CoveredRent Stabilized56 Open Violations ▸FISP: No Report Filed
Elevator apt, semi-fireproof without stores · Owner of record: ST. NIKOLAS HOLDINGS & MANAGEMENT LLC · 12,500 sf lot · 4.51 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KAJ NY CONSTRUCTION407/08/2026
ST NIKOLAS HOLDINGS MANAGEMENT L1407/08/2026
MGM BUILDERS407/08/2026
R & B CONTRACTING CO503/22/2026
ST. NICHOLAS HOLDINGS AND203/22/2026
ST. NIKOLAS HOLDINGS 2 MA103/22/2026
VUKSANAJ REALTY LLC303/22/2026
OWNER OF 1996 ANTHONY AVE103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MULLEN PALANDRANI ARCHITECTS311/23/2022
ENTHINK ENGINEERS LLC207/05/2022
EMPIRE DESIGN CORP106/29/2022
ASHRAF CORP105/05/2022
SYED ENGINEERING, P.C.109/21/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
R CONSULTING303/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARIF CHOUDHRYGeneral Contractor303/21/2026
EMPIRE CITY CONSTRUCTIONGeneral Contractor307/08/2026
JOSEPH GENERAL CONSTRUCTIGeneral Contractor107/08/2026
KAJ NY CONSTRUCTION INCGeneral Contractor107/08/2026
MGM BUILDERS CORPGeneral Contractor107/08/2026
L.L.G. PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MULLEN PALANDRANI ARCHITE4022108/23/2022
EMPIRE DESIGN CORP5474106/29/2022
LIGHTHOUSE5538105/05/2022
Building Lifecycle
All (102)Filed (8)Permit Issued (6)Signed Off (4)Violation (60)Inspection (3)Objection (16)Special Inspection (5)
06/07/2026
Violation issued (HPD, open)
A
04/26/2026
Violation issued (HPD, closed)
C
03/29/2026
Violation issued (HPD, open)
C
03/04/2026
Violation issued (HPD, open)
C
03/04/2026
Violation issued (HPD, closed)
C
02/25/2026
Violation issued (ECB, closed)
Elevators
02/15/2026
Violation issued (HPD, closed)
B
11/30/2025
Violation issued (HPD, open)
C
11/11/2025
Violation issued (HPD, closed)
C
11/11/2025
Violation issued (HPD, closed)
C
11/11/2025
Violation issued (HPD, closed)
C
11/05/2025
Violation issued (HPD, closed)
C
11/05/2025
Violation issued (HPD, closed)
B
11/05/2025
Violation issued (HPD, open)
C
04/02/2025
Violation issued (HPD, closed)
C
04/02/2025
Violation issued (HPD, closed)
C
03/24/2025
Violation issued (HPD, closed)
C
03/24/2025
Violation issued (HPD, closed)
C
02/07/2025
Violation issued (ECB, closed)
Construction
11/14/2024
Violation issued (ECB, closed)
Construction
07/05/2024
Violation issued (HPD, closed)
C
01/20/2024
Violation issued (HPD, closed)
C
01/20/2024
Violation issued (HPD, closed)
C
12/18/2023
Violation issued (HPD, closed)
C
12/18/2023
Violation issued (HPD, closed)
C
12/18/2023
Violation issued (HPD, closed)
C
11/30/2023
Violation issued (HPD, open)
C
11/30/2023
Violation issued (HPD, closed)
C
09/12/2023
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00696946-I1
03/30/2023
Signed off — Alteration
APPLICATION FILE FOR FACADE REPAIR WORK AS PER PLAN. THERE WILL BE NO CHANGE IN THE USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
X00767193-I1
01/22/2023
Violation issued (ECB, closed)
Elevators
12/30/2022
Signed off — Alteration
We respectfully wish to renovate apartment 1b as per plans. no change in use,egress or occupancy
X00786924-I1
12/21/2022
Signed off — Alteration
We respectfully wish to renovate apartment 1B as per plans. We are replacing the bath tub ,lav, toilet on existing roughing. we are replacing the kitchen sink, Dishwasher and Gas Range on existiing roughing..
X00797036-I1
12/15/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/15/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/13/2022
Violation issued (HPD, closed)
B
12/13/2022
Violation issued (HPD, closed)
B
12/13/2022
Violation issued (HPD, closed)
B
11/23/2022
Filed — Alteration
We respectfully wish to renovate apartment 1B as per plans. We are replacing the bath tub ,lav, toilet on existing roughing. we are replacing the kitchen sink, Dishwasher and Gas Range on existiing roughing..
X00797036-P1
10/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/05/2022
Permit issued — Plumbing
X00797036-I1-PL
09/30/2022
Permit issued — Supported Scaffold
X00696946-I1-SF
09/08/2022
Permit issued — General Construction
X00786924-I1-GC
09/01/2022
Objection raised — Scope
09/01/2022
Objection resolved — Addressed
09/01/2022
Objection raised — Admin
09/01/2022
Objection resolved — Addressed
08/30/2022
Objection raised — Zoning
08/30/2022
Objection resolved — Addressed
08/30/2022
Objection raised — Other
08/30/2022
Objection resolved — Addressed
08/30/2022
Objection raised — Energy
08/30/2022
Objection resolved — Addressed
08/30/2022
Objection raised — Scope
08/30/2022
Objection resolved — Addressed
08/30/2022
Objection raised — Other
08/30/2022
Objection resolved — Addressed
08/30/2022
Objection raised — Fire_Protection
08/30/2022
Objection resolved — Addressed
08/23/2022
Filed — Alteration
We respectfully wish to renovate apartment 1b as per plans. no change in use,egress or occupancy
X00786924-I1
Latest 60 of 102 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offL.L.G. PLBG & HTG INC10/05/2022
DOB NOWSupported ScaffoldSigned-offEMPIRE CITY CONSTRUCTION09/30/2022
DOB NOWGeneral ConstructionSigned-offJOSEPH GENERAL CONSTRUCTI09/08/2022
DOB NOWGeneral ConstructionSigned-offARIF CHOUDHRY07/07/2022
DOB NOWGeneral ConstructionPermit IssuedMGM BUILDERS CORP05/09/2022
DOB NOWSupported ScaffoldSigned-offEMPIRE CITY CONSTRUCTION03/17/2022
2 projects · most recent 09/22/2022
General Wiring
FiledStatusContractorScope
09/22/2022Permit IssuedABCO ELECTRICAL CONT CORPGeneral Wiring
09/20/2021Permit IssuedRICHARD NEU—
1 project · most recent 09/21/2021
Sidewalk Shed
FiledStatusContractorScope
09/21/2021——Sidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/15/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/14/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/22/2022Fire-Resistant Penetrations and JointsRichard Palandranispecial
08/03/2022FinalRichard Palandraniprogress
05/04/2022MasonrySAMIR ABDALLAspecial
05/04/2022Structural Stability – Alterations of existing buildingsSAMIR ABDALLAspecial
05/04/2022FinalBRIAN MCCAFFREYprogress
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/25/2026X00596543-I1Request digital key ↗
08/24/2026X00731799-I1Request digital key ↗
08/24/2026X00767193-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026X00596543-I1Open ↗
08/24/2026X00731799-I1Open ↗
08/24/2026X00696946-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026X00786924-I1Open ↗
08/23/2026X00731799-I1Open ↗
08/23/2026X00731799-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026X00786924-I1Open ↗
08/23/2026X00731799-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026X00797036-P1Open ↗
08/13/2026X00786924-I1Open ↗
08/13/2026X00797036-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/24/2026X00731799-I1Open ↗
08/13/2026X00767193-I1Open ↗