← Back
Single or multiple dwelling with stores or offices
2 3 STREET
BROOKLYN · BIN 3007962
💬 Discuss this project
1899Year Built
3Stories
S9Building Class
R6BZoning
5,384 sfGross Floor Area
4Units
Rent Stabilized0 Open Violations
Single or multiple dwelling with stores or offices · Owner of record: TOWNHOUSE RENTAL, L.L.C. · 2,332 sf lot · 2.31 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 32p · 1 filing · 7 docs
Floor 21p · 1 filing · 9 docs
Floor 14p · 2 filings · 20 docs
Cellar1p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GREENBROOK PARTNERS1607/08/2026
ACE GROUP NY CORP.703/22/2026
TOWNHOUSE RENTAL, LLC103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/27/2023$4.8M—2 3 ST LLC → TOWNHOUSE RENTAL II, L.L.C.$898/sf building
02/24/2021$2.5M—— → —$465/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VOLUME SPACE CONSULTING INC.112/04/2023
EAST + WEST ARCHITECTURE PC407/21/2023
CPENGINEERING PC512/07/2022
RAAD207/11/2022
SOTIR ASSOCIATES204/06/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CASA GROUP603/21/2026
METROPOLIS GROUP INC203/21/2026
SOTIR ASSOCIATES203/21/2026
XUX CONSULTING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACE GROUP NY CORPGeneral Contractor603/21/2026
TECHCREW INCGeneral Contractor507/08/2026
CUBE BUILDERS GROUP NYGeneral Contractor303/21/2026
BLUSHI CONSTRUCTION INCGeneral Contractor303/21/2026
XH&RC PLBG AND HTG INCPlumbing307/08/2026
DONATO PLUMBING, INCPlumbing107/08/2026
CONSTRUCTION EXPERT INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EAST+WEST ARCHITECTURE, P3269407/21/2023
PSI AGENCY INC.254308/02/2022
RAAD7727207/11/2022
Building Lifecycle
All (64)Filed (14)Permit Issued (10)Signed Off (8)Violation (4)Inspection (5)Objection (10)Special Inspection (13)
03/06/2024
Violation issued (HPD, closed)
B
03/06/2024
Violation issued (HPD, closed)
B
03/06/2024
Violation issued (HPD, closed)
A
12/04/2023
Filed — Alteration
B00969842-I1
12/04/2023
Permit issued — Supported Scaffold
B00969842-I1-SH
12/04/2023
Permit issued — Supported Scaffold
B00969842-I1-SF
08/02/2023
Signed off — Alteration
INTERIOR WORK RENOVATION OF EXISTING RETAIL STORE / EATING AND DRINKING ESTABLISHMENT ON FIRST FLOOR; NON-LOAD BEARING PARTITIONS, PLUMBING WORK FILED UNDER JOB B00855271-S1; NO CHANGE TO OCCUPANCY; USE AND EGRESS
B00855271-I1
08/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BARBARA HESS
08/01/2023
Special inspection requirement — Final
BARBARA HESS
07/27/2023
Objection resolved — Addressed
07/26/2023
Signed off — Alteration
INTERIOR WORK RENOVATION OF EXISTING RETAIL STORE / EATING AND DRINKING ESTABLISHMENT ON FIRST FLOOR; NON-LOAD BEARING PARTITIONS, PLUMBING WORK FILED UNDER JOB B00855271-S1; NO CHANGE TO OCCUPANCY; USE AND EGRESS
B00855271-S1
07/25/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/25/2023
Objection raised — Fire_Protection
07/21/2023
Filed — Alteration
INTERIOR WORK RENOVATION OF EXISTING RETAIL STORE / EATING AND DRINKING ESTABLISHMENT ON FIRST FLOOR; NON-LOAD BEARING PARTITIONS, PLUMBING WORK FILED UNDER JOB B00855271-S1; NO CHANGE TO OCCUPANCY; USE AND EGRESS
B00855271-P1
07/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BARBARA HESS
07/05/2023
Filed — Alteration
INTERIOR WORK RENOVATION OF EXISTING RETAIL STORE / EATING AND DRINKING ESTABLISHMENT ON FIRST FLOOR; NON-LOAD BEARING PARTITIONS, PLUMBING WORK FILED UNDER JOB B00855271-S1; NO CHANGE TO OCCUPANCY; USE AND EGRESS
B00855271-P2
06/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BARBARA HESS
06/30/2023
Special inspection requirement — Final
BARBARA HESS
06/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BARBARA HESS
05/25/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/11/2023
Permit issued — General Construction
B00855271-I1-GC
05/09/2023
Permit issued — Plumbing
B00855271-S1-PL
05/04/2023
Objection resolved — Addressed
04/27/2023
Objection resolved — Addressed
04/14/2023
Filed — Alteration
INTERIOR WORK RENOVATION OF EXISTING RETAIL STORE / EATING AND DRINKING ESTABLISHMENT ON FIRST FLOOR; NON-LOAD BEARING PARTITIONS, PLUMBING WORK FILED UNDER JOB B00855271-S1; NO CHANGE TO OCCUPANCY; USE AND EGRESS
B00855271-S1
04/14/2023
Objection resolved — Addressed
04/14/2023
Objection resolved — Addressed
04/11/2023
Objection raised — Admin
04/11/2023
Objection raised — Fire_Protection
04/11/2023
Objection raised — Accessibility
04/11/2023
Objection raised — Scope
04/06/2023
Filed — Alteration
INTERIOR WORK RENOVATION OF EXISTING RETAIL STORE / EATING AND DRINKING ESTABLISHMENT ON FIRST FLOOR; NON-LOAD BEARING PARTITIONS, PLUMBING WORK FILED UNDER JOB B00855271-S1; NO CHANGE TO OCCUPANCY; USE AND EGRESS
B00855271-I1
01/05/2023
Signed off — Alteration
IINSTALLATION OF HVAC SYSTEM.
B00655550-S1
12/24/2022
Permit issued — Mechanical Systems
B00655550-S1-MS
12/22/2022
Signed off — Alteration
IINSTALLATION OF HVAC SYSTEM.
B00655550-I1
12/16/2022
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENTS ON 2ND & 3RD FLOORS. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
B00495408-I1
12/16/2022
Signed off — Alteration
B00495461-I1
12/08/2022
Special inspection requirement — Final
MAURICIO ANDRADE
12/07/2022
Filed — Alteration
IINSTALLATION OF HVAC SYSTEM.
B00655550-P2
12/01/2022
Special inspection requirement — Final
MAURICIO ANDRADE
11/28/2022
Signed off — Alteration
B00717707-I1
08/02/2022
Filed — Alteration
IINSTALLATION OF HVAC SYSTEM.
B00655550-S1
08/01/2022
Filed — Alteration
IINSTALLATION OF HVAC SYSTEM.
B00655550-P1
07/19/2022
Signed off — Alteration
Installation of New HVAC System
B00518820-I1
07/11/2022
Filed — Alteration
Installation of New HVAC System
B00518820-P1
04/20/2022
Permit issued — Construction Fence
B00717707-I1-FN
04/12/2022
Filed — Alteration
B00717707-I1
03/30/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/21/2022
Permit issued — General Construction
B00655550-I1-GC
02/25/2022
Filed — Alteration
IINSTALLATION OF HVAC SYSTEM.
B00655550-I1
11/15/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/10/2021
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/15/2021
Permit issued — Mechanical Systems
B00518820-I1-MS
09/08/2021
Permit issued — Plumbing
B00495461-I1-PL
05/14/2021
Filed — Alteration
Installation of New HVAC System
B00518820-I1
05/10/2021
Permit issued — General Construction
B00495408-I1-GC
04/06/2021
Filed — Alteration
INTERIOR RENOVATION OF EXISTING APARTMENTS ON 2ND & 3RD FLOORS. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
B00495408-I1
04/06/2021
Filed — Alteration
B00495461-I1
03/31/2021
Special inspection requirement — Fire-Resistance Rated Construction
MAURICIO ANDRADE
03/31/2021
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedACE GROUP NY CORP12/04/2023
DOB NOWSupported ScaffoldPermit IssuedACE GROUP NY CORP12/04/2023
DOB NOWGeneral ConstructionSigned-offCONSTRUCTION EXPERT INC05/11/2023
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC05/09/2023
DOB NOWMechanical SystemsSigned-offTECHCREW INC12/24/2022
DOB NOWConstruction FenceSigned-offTECHCREW INC04/20/2022
DOB NOWGeneral ConstructionSigned-offTECHCREW INC03/21/2022
DOB NOWMechanical SystemsSigned-offCUBE BUILDERS GROUP NY10/15/2021
DOB NOWPlumbingSigned-offDONATO PLUMBING, INC09/08/2021
DOB NOWGeneral ConstructionSigned-offBLUSHI CONSTRUCTION INC05/10/2021
3 projects · most recent 07/13/2026
General Wiring
FiledStatusContractorScope
07/13/2026Permit IssuedMAC ELECT'L CONTR. INC.1 meters, 1 new_meters
05/09/2022CompleteMLS ELECTRIC LLCGeneral Wiring
04/04/2022CompleteDENNISON ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/25/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/25/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/30/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/15/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/10/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
08/01/2023Fire-Resistant Penetrations and JointsBARBARA HESSspecial
08/01/2023FinalBARBARA HESSprogress
07/12/2023Fire-Resistant Penetrations and JointsBARBARA HESSspecial
06/30/2023Fire-Resistant Penetrations and JointsBARBARA HESSspecial
06/30/2023FinalBARBARA HESSprogress
06/30/2023Fire-Resistant Penetrations and JointsBARBARA HESSspecial
12/08/2022FinalMAURICIO ANDRADEprogress
12/01/2022FinalMAURICIO ANDRADEprogress
03/31/2021Fire-Resistance Rated ConstructionMAURICIO ANDRADEprogress
03/31/2021Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
03/31/2021Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
03/31/2021Lighting in dwelling unitsMAURICIO ANDRADEenergy_progress
03/30/2021FinalPETER GEORGYprogress
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
09/01/2026B00495408-I1Request digital key ↗
09/01/2026B00495461-I1Request digital key ↗
09/01/2026B00518820-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/01/2026B00495408-I1Open ↗
09/01/2026B00495461-I1Open ↗
09/01/2026B00518820-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026B00495408-I1Open ↗
09/23/2026B00495408-I1Open ↗
09/23/2026B00495408-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026B00855271-P1Open ↗
09/23/2026B00495408-I1Open ↗
09/21/2026B00855271-P2Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/01/2026B00495408-I1Open ↗
09/01/2026B00495461-I1Open ↗
09/01/2026B00518820-I1Open ↗
Showing 3 of 12 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
09/01/2026B00495408-I1Open ↗
08/13/2026B00518820-I1Open ↗