← Back
BuildNYC
Condo, residential unit in elevator building
2 BAY CLUB DRIVE
QUEENS · BIN 4610766
💬 Discuss this project
1983Year Built
21Stories
R4Building Class
R5Zoning
960,850 sfGross Floor Area
1,037Units
LL97 CoveredRent Stabilized41 Active Violations 35 unresolved · 6 paperwork only ▸FISP: SAFEFDNY Report ↗
Condo, residential unit in elevator building · Owner of record: The Bay Club Condo · 123,373 sf lot · 7.79 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofElliman Property Management13p · 4 filings · 20 docs
Floor 21Elliman Property Management1 filing · 7 docs
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8Unit 8V1 filing · 6 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3Elliman Property Management1p · 1 filing · 16 docs
Floor 2Elliman Property Management1p · 1 filing · 16 docs
Floor 1Elliman Property Management7p · 7 filings · 20 docs
CellarElliman Property Management11p · 5 filings · 20 docs
Sub-CellarElliman Property Management1 filing · 7 docs
Site & exteriorElliman Property Management20p · 4 filings · 20 docs
Filed — no permit issued4p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
The Bay Club Condo403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Stone209/17/2026
Queens304/07/2026
Mehdi Ghazi, P.E.209/02/2025
Node Architecture, Engineering206/30/2025
Robert Germain Jr. PE1101/10/2024
Midtown Preservation310/31/2023
Becker Engineering107/01/2021
JLS Designs103/05/2021
All City Engineering212/08/2020
Stavros I. Malliaros, P.E.110/13/2020
Green Design305/01/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Midtown Preservation Architecture603/21/2026
Atlantic Building Supply603/21/2026
Mei Architect403/21/2026
Node Architecture, Engineering203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CC Controlled PlumbingPlumbing807/08/2026
Exo IndustriesScaffold407/08/2026
Bay RestorationScaffold407/08/2026
Xinos ConstructionGeneral Contractor207/08/2026
Bay Restorationspecialty_contractor203/21/2026
C C Controlled CombustionGeneral Contractor203/21/2026
Manda InternationalGeneral Contractor207/08/2026
Kraft ElectricElectrical103/22/2026
Jen-AirGeneral Contractor103/21/2026
JVS RestorationGeneral Contractor103/21/2026
Best PBG Heating & CoolPlumbing107/08/2026
Empire State Electric MaintenanceElectrical103/22/2026
Alklem PlumbingPlumbing108/18/2017
Bay RestorationGeneral Contractor210/24/2022
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Queens Engineering8898304/07/2026
Node Architecture, Engineering6799106/30/2025
Robert F. Germain Jr. PE51001101/10/2024
Midtown Preservation2634203/28/2023
NY Restoration Technology6187112/06/2022
Becker Engineering633107/01/2021
JD Engineering9859112/08/2020
All City Engineering7115112/08/2020
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
11/10/2026
Failure to maintain building in code compliant manner. At time of appointment inspection, observed, a small crack & hole in the building's lobby…
ECB violation · open
09/17/2026
Filed — Alteration
Pool HVAC Replacement project as per plans. No change in use, egress, or occupancy.
Q01386195-P1
09/15/2026
Special inspection requirement — Mechanical Systems
09/15/2026
Special inspection requirement — Maintenance information
195 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationSigned-offXinos Construction08/20/2025
DOB NOWGeneral ConstructionSigned-offBay Restoration04/05/2023
DOB NOWGeneral ConstructionSigned-offXinos Construction01/30/2023
DOB NOWPlumbingPermit IssuedCC Controlled Plumbing10/31/2022
DOB NOWPlumbingPermit IssuedCC Controlled Plumbing07/08/2022
DOB NOWGeneral ConstructionSigned-offManda International05/31/2022
DOB NOWGeneral ConstructionSigned-offManda International03/28/2022
DOB NOWSidewalk ShedSigned-offBay Restoration02/24/2022
DOB NOWPlumbingPermit IssuedCC Controlled Plumbing09/03/2021
DOB NOWPlumbingPermit IssuedBest PBG Heating & Cool05/06/2021
DOB NOWSidewalk ShedSigned-offBay Restoration01/14/2021
DOB NOWPlumbingPermit IssuedCC Controlled Plumbing11/18/2020
DOB NOWSidewalk ShedSigned-offBay Restoration10/22/2020
DOB NOWPlumbingPermit IssuedCC Controlled Plumbing04/28/2020
DOB NOWSidewalk ShedSigned-offExo Industries11/14/2019
DOB NOWSidewalk ShedSigned-offExo Industries02/22/2019
BISFBISSUEDCC Controlled Plumbing06/14/2023
BISPLISSUEDCC Controlled Plumbing06/14/2023
BISOTISSUEDBay Restoration10/24/2022
BISPLISSUEDCC Controlled Plumbing03/28/2022
BISOTISSUEDC C Controlled Combustion03/28/2022
BISBLISSUEDCC Controlled Plumbing03/28/2022
BISOTISSUEDBay Restoration11/22/2021
BISOTISSUEDJen-Air08/07/2020
BISMHISSUEDJen-Air07/31/2020
BISFBISSUEDCC Controlled Plumbing04/28/2020
BISFBISSUEDCC Controlled Plumbing07/12/2019
BISPLISSUEDCC Controlled Plumbing04/23/2019
BISOTISSUEDC C Controlled Combustion04/23/2019
BISMHISSUEDJen-Air01/31/2019
BISPLISSUEDAlklem Plumbing08/18/2017
BISOTISSUEDJVS Restoration04/14/2017
BISOTISSUEDJVS Restoration10/26/2016
2 projects · most recent 09/17/2026
Heating and Air Conditioning Systems Air Conditioning Systems Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScope
09/17/2026——Heating and Air Conditioning Systems
12/08/2020——Air Conditioning Systems, Associated Ducts and Piping, Ventilation Systems
4 projects · most recent 09/02/2025
Water/Sanitary Gas
FiledStatusContractorScope
09/02/2025——Water/Sanitary
01/10/2024Permit IssuedCC Controlled PlumbingGas
07/01/2021——Water/Sanitary
03/30/2020——Gas
13 projects · most recent 09/11/2025
General Wiring Lighting Boiler Controls
FiledStatusContractorScope
09/11/2025Permit IssuedY.S. ElectricGeneral Wiring, Lighting
02/14/2023CompleteAtmos Electric SvceGeneral Wiring
12/08/2022CompleteLion Heart ElectricGeneral Wiring
12/07/2022CompleteKraft ElectricBoiler Controls
05/24/2022CompleteLion Heart Electric—
05/02/2022CancelledNY Electric Maintenance & DataGeneral Wiring
03/09/2022CompleteLion Heart ElectricGeneral Wiring
01/24/2022CompleteEmpire State Electric MaintenanceGeneral Wiring
05/30/2021CompleteConcorde Electrical ServicesGeneral Wiring
10/24/2019Permit IssuedRichard Neu—
05/08/2019Permit IssuedTriangle ElectricGeneral Wiring
04/02/2019Permit IssuedGlendale Electl ContngGeneral Wiring
02/18/2019CompleteRichard Neu—
2 projects · most recent 04/07/2026
FiledStatusContractorScope
04/07/2026Signed-offXinos Construction—
09/02/2025———
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/02/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/03/2022Pass-Final PL - More than 10 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
09/15/2026Mechanical Systems—special
09/15/2026Maintenance information—energy_progress
09/15/2026HVAC-R and service water piping design and insulation—energy_progress
09/15/2026Shutoff dampers—energy_progress
09/15/2026HVAC-R and service water heating system controls—energy_progress
09/15/2026Electrical motors and elevators—energy_progress
09/15/2026HVAC-R and service water heating equipment—energy_progress
09/15/2026Final—progress
09/15/2026Tenant Protection Plan Compliance—special
06/01/2026HVAC-R and service water heating system controls—energy_progress
06/01/2026HVAC-R and service water heating equipment—energy_progress
06/01/2026Shutoff dampers—energy_progress
06/01/2026Maintenance information—energy_progress
06/01/2026Electrical motors and elevators—energy_progress
06/01/2026HVAC-R and service water piping design and insulation—energy_progress
05/12/2026Subsurface Investigations (Borings/Test Pits)ELIAS RASABIspecial
05/12/2026Excavations - Sheeting, Shoring, and BracingANDREAS CHRISTOFOROUspecial
04/13/2026Mechanical Systems—special
04/13/2026Final—progress
04/28/2025MasonryRadomir Delicspecial
04/28/2025Tenant Protection Plan ComplianceRadomir Delicspecial
04/09/2025FinalRadomir Delicprogress
01/22/2024Fire-Resistant Penetrations and JointsRobert Germain Jr.special
12/20/2023Fire-Resistant Penetrations and JointsRobert Germain Jr.special
11/13/2023FinalKATHLEEN NEEDHAM-INOCCOprogress
Latest 25 of 44.
268 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account