← Back
BuildNYC
Condo, commercial tower (mixed-use) [derived]
Fifth & Fifty-Fifth Condominium
2 EAST 55TH STREET · BIN 1035762
💬 Discuss this project
1904Year Built
20Stories
RCBuilding Class
C5-3Zoning
323,504 sfGross Floor Area
48Units
LL97 CoveredRent Stabilized8 Active Violations 2 old, status unconfirmed ▸FISP: UNSAFE
Condo, commercial tower (mixed-use) [derived] · 22,544 sf lot · 14.35 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSt Regis Hotel11p · 6 filings · 20 docs
PenthouseAntenna replacement and equipment retrofit3p · 1 filing · 6 docs
Floor 16QIA SR NY Hotel, LLC2p · 1 filing · 7 docs
Floor 15
Floor 14
Floor 13QIA SR NY Hotel, LLC3p · 1 filing · 7 docs
Floor 12
Floor 11Marriott Vacations WorldwideUnder Construction2p · 1 filing · 8 docs
Floor 10Marriott Vacations WorldwideUnder Construction2p · 1 filing · 8 docs
Floor 9Marriott Vacations WorldwideUnder Construction2p · 1 filing · 8 docs
Floor 8Marriott Vacations Worldwide, St Regis HotelUnder Construction4p · 2 filings · 19 docs
Floor 7St Regis Hotel4p · 1 filing · 11 docs
Floor 6St Regis Hotel4p · 1 filing · 11 docs
Floor 5St Regis Hotel4p · 1 filing · 11 docs
Floor 4St Regis Hotel4p · 1 filing · 11 docs
Floor 3St Regis HotelUnder Construction5p · 2 filings · 20 docs
Floor 2St Regis Hotel, BlancpainUnder Construction30p · 3 filings · 20 docs
Floor 1St Regis Hotel, Blancpain +113p · 12 filings · 20 docs
MezzanineSt Regis Hotel29p · 1 filing · 20 docs
CellarSt Regis Hotel, BlancpainUnder Construction69p · 6 filings · 20 docs
Sub-CellarSt Regis HotelUnder Construction19p · 3 filings · 20 docs
BasementSt Regis HotelUnder Construction1p · 1 filing · 20 docs
Sub-BasementBlancpain1 filing · 4 docs
Site & exteriorSt Regis HotelUnder Construction42p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
St Regis New York Holding11207/08/2026
St Regis Hotel7807/08/2026
Vornado Realty Trust3804/09/2026
Rre Holdings1003/21/2026
SLT Realty603/21/2026
Itt Sheraton Co GP of First Hot603/21/2026
The Swatch Group (U.S.)307/08/2026
SLT Realty LP Dba St Regis Hot203/21/2026
Quantum Design203/21/2026
Prudential Holding Joint203/21/2026
Itt Sheraton203/21/2026
St Regis Hotel Joint Venture203/21/2026
Bigman Brothers103/21/2026
Harry Winston103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 Expediting Service1403/21/2026
Milrose Consultants3803/21/2026
Smep Design & Consultation403/21/2026
Fzad Architecture + Design103/21/2026
Casa Group203/21/2026
Rand Engineering & Arch203/21/2026
CCM Services Group103/21/2026
Metropolis Group203/21/2026
GM Zoning Filing203/21/2026
Streling Engineering Services P203/21/2026
Xinos Construction203/21/2026
Nagan EX Consultants203/21/2026
Riggining Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Structure ToneGeneral Contractor2110/21/2026
Safway AtlanticScaffold1010/09/2026
Trystate Mechanicalspecialty_contractor1007/08/2026
Xinos ConstructionScaffold607/08/2026
B&B Contracting GroupGeneral Contractor404/09/2026
CJS IndustriesGeneral Contractor304/09/2026
Bigman BrothersElectrical203/21/2026
Xinos ConstructionGeneral Contractor203/21/2026
Manengeering BureauFire Protection207/08/2026
DynaireGeneral Contractor207/08/2026
A.S.R. Electrical ContractingElectrical203/21/2026
DPC New YorkScaffold107/08/2026
Par Plumbing CoPlumbing107/08/2026
Difalzo Electric NYElectrical103/22/2026
Phoenix Plumbing & MechanicalFire Protection107/08/2026
Kleinknecht Electric CoElectrical103/21/2026
Lite-Tron ElectricalElectrical103/21/2026
Kleinknecht Electric CoElectrical103/22/2026
Allran Electric of N.YElectrical103/21/2026
Dobs Elevator CompanyElectrical103/21/2026
Lawrence J. LevineFire Protection103/21/2026
Lane Refrigeration Cospecialty_contractor104/09/2026
LG TechGeneral Contractor104/09/2026
Andamio ScaffoldingScaffold104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rand Engineering & Architects266209/17/2026
Bazini Engineering1808105/05/2026
G. Blinn Consulting2894502/23/2026
Shahrish Shuvo Engineering8524502/12/2026
Vincent J. Liotta P. E1974101/07/2026
PSI Agency2541503/26/2025
TSF Engineering1274111/15/2024
Fzad Architecture + Desig2041111/13/2024
W. Allen Engineering664109/19/2022
Amka & Associates8239208/31/2022
Renant Antren9494107/29/2022
KMB Design Group513106/12/2020
Alan Margolin & Associates423111/01/2019
Building Lifecycle
All (266)Filed (44)Permit Issued (60)Signed Off (26)Facade (FISP) (27)Violation (60)Inspection (9)Objection (10)Special Inspection (30)
10/20/2026
Signed off — Alteration
M00947398-I1
10/20/2026
Signed off — Alteration
Addition and modifications to existing HVAC system and related ducts and piping, installation of commercial kitchen, and hood and duct ventilation system. No change in use, egress or occupancy.
M00947417-I1
10/20/2026
Signed off — Alteration
Installation of new non-bearing partitions, millwork, finishes, and decorative metal and glass assemblies. No change in use, egress or occupancy
M00947574-I1
10/20/2026
Permit issued — General Construction
M01288954-S1-GC
10/15/2026
Permit issued — General Construction
M01288954-I1-GC
10/07/2026
Permit issued — Sidewalk Shed
M01274654-I1-SH
09/24/2026
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01274654-S3
09/24/2026
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01274654-S4
09/24/2026
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01274654-S1
09/24/2026
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01274654-S2
09/17/2026
Filed — Alteration
Limited Structural Repair program, sidewalk lift. No change to use, egress or occupancy.
M00959544-P1
09/15/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/02/2026
Permit issued — General Construction
M01288954-S1-GC
09/02/2026
Permit issued — General Construction
M01288954-I1-GC
08/26/2026
Special inspection requirement — Structural Steel - Details
James Vignola
08/26/2026
Special inspection requirement — Concrete - Cast-In-Place
James Vignola
08/26/2026
Special inspection requirement — Post-installed Anchors
James Vignola
08/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
James Vignola
08/26/2026
Special inspection requirement — Sprayed fire-resistant materials
James Vignola
08/26/2026
Special inspection requirement — Structural Steel - Welding
James Vignola
08/26/2026
Special inspection requirement — Structural Steel - High Strength Bolting
James Vignola
08/26/2026
Special inspection requirement — Masonry
James Vignola
08/26/2026
Special inspection requirement — Final
James Vignola
07/17/2026
Signed off — Alteration
M00947116-I1
07/17/2026
Signed off — Alteration
Refurbishment without alteration of partitions, openings, plumbing or mechanical systems. Temporary work area separations. No change in use, egress or occupancy.
M00947194-I1
06/11/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/03/2026
Signed off — Alteration
INSTALL REPLACEMENT PLATE AND FRAME HEAT EXCHANGER AS PER THE ATTACHED PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01391709-I1
05/29/2026
Permit issued — General Construction
M01288954-S1-GC
05/11/2026
Permit issued — General Construction
M01391709-I1-GC
05/08/2026
Permit issued — Mechanical Systems
M01391709-I1-MS
05/05/2026
Filed — Alteration
INSTALL REPLACEMENT PLATE AND FRAME HEAT EXCHANGER AS PER THE ATTACHED PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01391709-I1
05/04/2026
Signed off — Alteration
M00783922-I1
04/29/2026
Violation issued (HPD, open)
A
04/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
04/23/2026
Special inspection requirement — Mechanical Systems
Joseph Bazini
04/23/2026
Special inspection requirement — Heating Systems
Joseph Bazini
04/23/2026
Special inspection requirement — Final
Joseph Bazini
04/07/2026
Signed off — Alteration
INSTALL SPRINKLER HEADS AND RELATED PIPING AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00763924-I1
03/25/2026
Signed off — Alteration
The assembly of new steel platform for AC units on 2nd FLOOR ROOF. Structural members , steel/aluminum grating and post installed anchors.
M01174767-I1
03/13/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
M01058003-I1
03/13/2026
Signed off — Alteration
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor:Jesus Decola
M01184616-I1
02/28/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY SUPPORTED SCAFFOLDING AS PER PLANS SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES, CHAPTER 33. NO CHANGES IN USE, EGRESS, OR OCCUPANCY.
M00452110-I1
02/27/2026
Signed off — Alteration
REMOVAL OF TRANFER FAN, UNIT HEATER, ASSOCIATED DUCTWORK, CONTROLS, WIRING ETC UNDER STAIRS, REMOVAL OF LINEAR DIFFUSERS& CAP DUCTWORK AT 1ST FLOOR, RE-SUPPORT EXISTING DUCTS & DIFFUSERS AS NEEDED TO ALLOW DEMOLITION WORK IN CELLAR.
M01137610-I1
02/27/2026
Signed off — Alteration
Additions/Modifications to existing Sprinkler systems as per plans filed herewith. No change in use, egress or occupancy under this application
M00947597-I1
02/26/2026
Signed off — Alteration
AT&T - Replacement of existing antennas on roof. Retrofit of existing cabinet with installation and replacement of RRH units in existing penthouse equipment room. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
M00283987-I1
02/26/2026
Permit issued — General Construction
M01324860-I1-GC
02/23/2026
Filed — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01274654-P1
02/12/2026
Filed — Alteration
General refurbishment and minor alterations to select guestrooms
M01324860-I1
02/12/2026
Filed — Alteration
exterior removal of selective exterior windows and masonry facade
M01288954-S1
02/12/2026
Signed off — Alteration
REPLACEMET OF 2 SPLIT SYSTEMS ON THE ROOF AND ROOF MER WITH A TOTAL CAPACITY OF 8 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01343281-I1
02/05/2026
Filed — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01274654-P2
02/03/2026
Special inspection requirement — Post-installed Anchors
GREG BLINN
02/03/2026
Special inspection requirement — Post-installed Anchors
GREG BLINN
02/02/2026
Permit issued — General Construction
M01324854-I1-GC
01/13/2026
Filed — Alteration
General refurbishment of guestrooms & corridors and minor alterations to select rooms
M01324854-I1
01/13/2026
Signed off — Alteration
M00947600-I1
01/12/2026
Permit issued — Mechanical Systems
M01343281-I1-MS
01/07/2026
Filed — Alteration
REPLACEMET OF 2 SPLIT SYSTEMS ON THE ROOF AND ROOF MER WITH A TOTAL CAPACITY OF 8 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01343281-I1
01/07/2026
Special inspection requirement — Maintenance information
Vincent Liotta
01/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
Latest 60 of 266 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedStructure Tone10/20/2026
DOB NOWGeneral ConstructionPermit IssuedStructure Tone10/15/2026
DOB NOWSidewalk ShedPermit IssuedSafway Atlantic10/07/2026
DOB NOWGeneral ConstructionPermit IssuedStructure Tone09/02/2026
DOB NOWGeneral ConstructionPermit IssuedStructure Tone09/02/2026
DOB NOWGeneral ConstructionPermit IssuedStructure Tone05/29/2026
DOB NOWGeneral ConstructionSigned-offDynaire05/11/2026
DOB NOWMechanical SystemsSigned-offDynaire05/08/2026
DOB NOWGeneral ConstructionPermit IssuedStructure Tone02/26/2026
DOB NOWGeneral ConstructionPermit IssuedStructure Tone02/02/2026
DOB NOWMechanical SystemsSigned-offLane Refrigeration Co01/12/2026
DOB NOWGeneral ConstructionPermit IssuedStructure Tone12/19/2025
DOB NOWStructuralPermit IssuedB&B Contracting Group12/11/2025
DOB NOWSupported ScaffoldSigned-offSafway Atlantic10/14/2025
DOB NOWProtection and Mechanical MethodsSigned-offSafway Atlantic09/29/2025
DOB NOWProtection and Mechanical MethodsSigned-offSafway Atlantic09/29/2025
DOB NOWConstruction FenceSigned-offSafway Atlantic09/29/2025
DOB NOWSidewalk ShedPermit IssuedSafway Atlantic09/16/2025
DOB NOWProtection and Mechanical MethodsSigned-offSafway Atlantic08/25/2025
DOB NOWConstruction FenceSigned-offSafway Atlantic08/25/2025
DOB NOWProtection and Mechanical MethodsSigned-offSafway Atlantic08/25/2025
DOB NOWStructuralPermit IssuedB&B Contracting Group07/31/2025
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System07/02/2025
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System07/02/2025
DOB NOWStructuralSigned-offStructure Tone05/15/2025
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding03/31/2025
DOB NOWMechanical SystemsSigned-offStructure Tone02/26/2025
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System02/25/2025
DOB NOWMechanical SystemsSigned-offCJS Industries12/23/2024
DOB NOWGeneral ConstructionSigned-offCJS Industries12/23/2024
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System06/14/2024
DOB NOWSprinklersSigned-offManengeering Bureau01/22/2024
DOB NOWSprinklersSigned-offManengeering Bureau01/22/2024
DOB NOWPlumbingSigned-offPar Plumbing Co01/22/2024
DOB NOWGeneral ConstructionSigned-offStructure Tone12/28/2023
DOB NOWStructuralSigned-offStructure Tone12/27/2023
DOB NOWGeneral ConstructionSigned-offStructure Tone12/27/2023
DOB NOWMechanical SystemsSigned-offStructure Tone12/27/2023
DOB NOWGeneral ConstructionSigned-offStructure Tone12/27/2023
DOB NOWGeneral ConstructionSigned-offStructure Tone12/27/2023
+ 60 more permits on file
1 project · most recent 03/26/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/26/2025Signed-offStructure ToneHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PUHY- EP144TNU-A1 960,000 BTU · Vrf Outdoor ×3
PUHY-EP-144TNU-A1 960,000 BTU · Vrf Outdoor ×1
Ventilation
Mainstream MLR-72X50-2.0-HD 6,750 CFM · Kitchen Exhaust ×1
15 projects · most recent 09/24/2026
General Wiring
FiledStatusContractorScope
09/24/2026Permit IssuedTF ElectricalGeneral Wiring
01/12/2026CompleteKleinknecht Electric CoGeneral Wiring
01/12/2026Permit IssuedP.E. StoneGeneral Wiring
11/25/2025CompleteH. & L. ElectricGeneral Wiring
09/16/2025Permit IssuedCorporate Electric Group—
07/14/2025CompleteH. & L. Electric—
07/10/2025Permit IssuedWarren Ostroff ElectricGeneral Wiring
04/01/2025CompleteBorowide Elect'l Contractors—
02/06/2025CompleteH. & L. ElectricGeneral Wiring
11/01/2022Permit IssuedDifalzo Electric NYGeneral Wiring
10/24/2022Permit IssuedDifalzo Electric NYGeneral Wiring
10/24/2022CompleteDifalzo Electric NYGeneral Wiring
03/09/2021CompleteLowy & DonnathGeneral Wiring
02/19/2019Permit IssuedDifazio Electric NYGeneral Wiring
04/25/2018CompleteInter Connection ElectricGeneral Wiring
1 project · most recent 09/17/2026
Steel Concrete Masonry
FiledStatusContractorScope
09/17/2026Permit IssuedB&B Contracting GroupSteel, Concrete, Masonry
2 projects · most recent 02/23/2026
Fence Scaffold
FiledStatusContractorScope
02/23/2026Permit IssuedSafway AtlanticFence, Scaffold
———Fence
1 project · most recent 01/13/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
01/13/2026Permit IssuedStructure ToneTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/11/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/03/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/11/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/06/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/06/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/27/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/21/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/30/2022Pass-Final SP - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 89
DateRequirementInspectorRole
09/15/2026Tenant Protection Plan Compliance—special
08/26/2026MasonryJames Vignolaspecial
08/26/2026Concrete - Cast-In-PlaceJames Vignolaspecial
08/26/2026Post-installed AnchorsJames Vignolaspecial
08/26/2026Sprayed fire-resistant materialsJames Vignolaspecial
08/26/2026FinalJames Vignolaprogress
08/26/2026Structural Steel - DetailsJames Vignolaspecial
08/26/2026Structural Steel - High Strength BoltingJames Vignolaspecial
08/26/2026Structural Steel - WeldingJames Vignolaspecial
08/26/2026Structural Stability – Alterations of existing buildingsJames Vignolaspecial
04/23/2026Tenant Protection Plan ComplianceJoseph Bazinispecial
04/23/2026Heating SystemsJoseph Bazinispecial
04/23/2026Mechanical SystemsJoseph Bazinispecial
04/23/2026FinalJoseph Baziniprogress
02/03/2026Post-installed AnchorsGREG BLINNspecial
02/03/2026Post-installed AnchorsGREG BLINNspecial
01/07/2026HVAC-R and service water heating system controlsVincent Liottaenergy_progress
01/07/2026HVAC-R and service water heating equipmentVincent Liottaenergy_progress
01/07/2026HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
01/07/2026Maintenance informationVincent Liottaenergy_progress
12/19/2025FinalKevin Brownprogress
12/19/2025Tenant Protection Plan ComplianceShahrish Shuvospecial
12/19/2025Tenant Protection Plan ComplianceShahrish Shuvospecial
12/19/2025FinalKevin Brownprogress
10/09/2025Post-installed AnchorsGREG BLINNspecial
Latest 25 of 89.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Marriott Vacations WorldwideHotel / LodgingFloors 8–11
Project M01324860 Alteration · Permit Entire · 02/12/2026
St Regis HotelHotel / LodgingSub-cellar, Cellar, Floors 1–8, Mezzanine, Roof
Project M01324854 Alteration · Permit Entire · 01/13/2026
Project M01343281 Alteration · LOC Issued · 01/07/2026
Project M01274654 Alteration · Permit Entire · 08/22/2025
Project M00959544 Alteration · Plan Examiner Review · 05/06/2025
Project M00947417 Alteration · LOC Issued · 12/08/2023
Project M00947116 Alteration · LOC Issued · 12/07/2023
Project M00947398 Alteration · LOC Issued · 12/07/2023
Project M00947574 Alteration · LOC Issued · 12/07/2023
Project M00947600 Alteration · LOC Issued · 12/06/2023
Project M00947597 Alteration · LOC Issued · 12/04/2023
Project M00947435 Alteration · LOC Issued · 12/12/2023
Project M00947581 Alteration · Permit Entire · 12/12/2023
BlancpainRetailCellar, Sub-basement, Floors 1, 2
Project M01137610 Alteration · LOC Issued · 11/15/2024
Project M01094329 Alteration · LOC Issued · 11/13/2024
BreguetRetailFloor 1
Project M00763924 Alteration · LOC Issued · 09/19/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,557 on file (BIS + DOB NOW)
▸Plans & Drawings45
▸DOB NOWPlans/Sketch41
09/06/2026M00975347-I1Request digital key ↗
09/02/2026M00783922-I1Request digital key ↗
09/01/2026M00789162-I1Request digital key ↗
Showing 3 of 41 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00140461-I1Request digital key ↗
09/04/2026M00452110-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
09/04/2026M00283987-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00213081-I1Request digital key ↗
▸Applications & Permits309
▸BISPLAN / WORK APPROVAL APPLICATION164
10/10/2024122840060Open ↗
09/04/2024104634834Open ↗
04/05/2023122840060Open ↗
Showing 3 of 164 on file for this type
▸BISWORK PERMIT APPLICATION113
04/20/2022122840060Open ↗
03/06/2020121621637Open ↗
07/02/2019123045800Open ↗
Showing 3 of 113 on file for this type
▸DOB NOWLPC Approval/Permit29
10/14/2026M00959544-P1Open ↗
08/27/2026M00947417-I1Open ↗
08/27/2026M00947417-P1Open ↗
Showing 3 of 29 on file for this type
▸BISPLACE OF ASSEMBLY3
09/11/2024104634834Open ↗
Showing 1 of 3 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZONING EXHIBIT I: CERTIFICATION1
06/28/2017123045800Open ↗
▸Seals & Professional Certifications341
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION153
04/04/2019123716023Open ↗
04/04/2019123716023Open ↗
11/14/2018123534639Open ↗
Showing 3 of 153 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature43
10/14/2026M00959544-P1Open ↗
09/06/2026M00975347-I1Open ↗
09/05/2026M00140461-I1Open ↗
Showing 3 of 43 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST41
04/04/2019123716023Open ↗
Showing 1 of 41 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature30
10/14/2026M00959544-P1Open ↗
10/03/2026M00947417-P1Open ↗
09/03/2026M00959544-I1Open ↗
Showing 3 of 30 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT29
03/29/2022141008335Open ↗
04/04/2019123716023Open ↗
06/28/2017123045800Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
10/14/2026M00959544-P1Open ↗
10/03/2026M00947417-P1Open ↗
09/23/2026M01343281-I1Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
03/29/2022141008335Open ↗
Showing 1 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
03/29/2022141008335Open ↗
Showing 1 of 4 on file for this type
▸Trade Schedules & Equipment132
▸BISSELF-CERT PLUMBING NOTICE44
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 44 on file for this type
▸BISSCHEDULE B - PLUMBING27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE20
06/26/2017123045800Open ↗
Showing 1 of 20 on file for this type
▸BISEQUIPMENT USE PERMITS15
07/31/2017122819664Open ↗
07/31/2017122819664Open ↗
Showing 2 of 15 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA14
07/12/2022121273727Open ↗
Showing 1 of 14 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
07/31/2017122819664Open ↗
07/31/2017122819664Open ↗
Showing 2 of 6 on file for this type
▸BISSPRINKLER INSP REPORT : FP-856
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Safety & Tenant Protection101
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist43
10/14/2026M00959544-P1Open ↗
09/06/2026M00975347-I1Open ↗
08/27/2026M00947417-I1Open ↗
Showing 3 of 43 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST35
03/29/2022141008335Open ↗
03/29/2022141008335Open ↗
04/04/2019123716023Open ↗
Showing 3 of 35 on file for this type
▸BISTenant Protection Plan and Notes16
04/03/2019123716023Open ↗
Showing 1 of 16 on file for this type
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00213081-I1Open ↗
08/13/2026M00283987-I1Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos93
▸BISASBESTOS: CERTIFICATION (DEP ACP5)45
11/14/2018123534639Open ↗
07/24/2017123045800Open ↗
Showing 2 of 45 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report27
10/14/2026M00959544-P1Open ↗
09/05/2026M00213081-I1Open ↗
08/28/2026M00947597-I1Open ↗
Showing 3 of 27 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Energy Compliance56
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS30
11/14/2018123534639Open ↗
03/12/2018123057440Open ↗
03/12/2018123057440Open ↗
Showing 3 of 30 on file for this type
▸BISTR8: Energy Code Progress Inspections11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
09/01/2020121621637Open ↗
03/12/2018123057440Open ↗
Showing 2 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
09/01/2020121621637Open ↗
09/01/2020121621637Open ↗
Showing 2 of 3 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY16
05/30/2023122840060Open ↗
05/08/2023122840060Open ↗
03/19/2022123716023Open ↗
Showing 3 of 16 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
10/15/2024122840060Open ↗
▸Approvals, Objections & Sign-offs149
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST63
12/02/2024122840060Open ↗
09/12/2022101369412Open ↗
03/21/2022123716023Open ↗
Showing 3 of 63 on file for this type
▸BISLANDMARKS APPROVAL40
03/29/2022141008335Open ↗
03/18/2022101369412Open ↗
09/11/2019122822945Open ↗
Showing 3 of 40 on file for this type
▸BISADMINISTRATIVE OBJECTIONS24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
04/20/2022122840060Open ↗
04/20/2022122840060Open ↗
02/09/2018140635524Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSUPERSEDING LETTER4
03/06/2020121621637Open ↗
09/26/2017123074010Open ↗
09/15/2017122864882Open ↗
Showing 3 of 4 on file for this type
▸BISSHED LETTER2
01/22/2018140601506Open ↗
Showing 1 of 2 on file for this type
▸BISLANDMARKS SIGNOFF2
11/29/2024122840060Open ↗
03/21/2022123716023Open ↗
▸Cost, Insurance & Ownership110
▸BISCOST AFFIDAVIT104
03/31/2022122840060Open ↗
03/29/2022141008335Open ↗
09/08/2021122759835Open ↗
Showing 3 of 104 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISOK TO ISSUE TCO PENDING RESOLUTION OFOPEN FACADE VIOLATION - AFFIDAVIT ATTACHED2
10/23/2025121446925Open ↗
06/30/2025121446925Open ↗
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms154
▸BISEFILING COVER SHEET74
11/14/2018123534639Open ↗
06/27/2017123045800Open ↗
Showing 2 of 74 on file for this type
▸BISADDITIONAL INFORMATION44
05/21/2020122840060Open ↗
02/26/2019121284779Open ↗
09/07/2017123074010Open ↗
Showing 3 of 44 on file for this type
▸BISBOROUGH INTAKE FORM19
03/25/2020122840060Open ↗
02/20/2020121446925Open ↗
11/27/2019121446925Open ↗
Showing 3 of 19 on file for this type
▸BISHPD-3 - SRO MD ANTI-HARASSEMENT CHECKLIST10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
03/29/2022141008335Open ↗
Showing 1 of 6 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026M01274654-P1Open ↗
▸Other Documents29
▸DOB NOWProof of Historic Building15
08/27/2026M00947417-I1Open ↗
08/27/2026M00947417-P1Open ↗
08/26/2026M00947574-I1Open ↗
Showing 3 of 15 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWIRA Certification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWWaiver Document1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type