| Owner | Filings | Most Recent |
|---|---|---|
| BOP WEST 31ST STREET | 330 | 07/08/2026 |
| BROOKFIELD PROPERTIES | 249 | 07/08/2026 |
| BROOKFIELD POWERED BY CBRE | 9 | 07/08/2026 |
| BENSON INDUSTRIES | 9 | 07/08/2026 |
| TISHMAN CONSTRUCTION | 16 | 03/22/2026 |
| METROPOLITAN WALTERS LLC | 4 | 03/22/2026 |
| JOHN G CIVETT & SONS INC | 1 | 03/22/2026 |
| JOHN CIYETTA&SOMS INC | 1 | 03/22/2026 |
| HENRY CASO/C/O BOP WEST 3 | 1 | 03/22/2026 |
| MANAGEMENT BUILDING | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| BELLSEY & ASSOCIATES | 1 | 08/26/2026 |
| ROBERT DERECTOR ASSOCIATES | 70 | 08/11/2026 |
| GENSLER | 24 | 08/10/2026 |
| HOK | 14 | 08/03/2026 |
| GILSANZ MURRAY STEFICEK LLP | 1 | 06/30/2026 |
| VOCON | 1 | 06/24/2026 |
| AMA CONSULTING ENGINEERS, PC | 48 | 05/05/2026 |
| TED MOUDIS ASSOCIATES | 3 | 04/21/2026 |
| TPG ARCHITECTURE, LLP | 5 | 03/18/2026 |
| HIGHLAND ASSOCIATES | 4 | 01/22/2026 |
| JAROS BAUM & BOLLES | 81 | 12/17/2025 |
| SKIDMORE OWINGS & MERRILL LLP | 19 | 08/07/2025 |
| PERKINS and WILL | 1 | 08/05/2025 |
| PLAN B ENGINEERING | 25 | 02/21/2025 |
| MMOSER ASSOCIATES | 9 | 02/04/2025 |
| AKF ENGINEERS, LLP | 5 | 01/06/2025 |
| IW ARCHITECTURE, PLLC | 4 | 12/04/2024 |
| ELIZABETH MARR | 4 | 07/17/2024 |
| HLW INTL LLP | 1 | 05/08/2024 |
| SSM DESIGN LLP D/B/A SPECTOR GROUP | 3 | 04/22/2024 |
| MARMOL RADZINER | 3 | 11/20/2023 |
| INTERIOR ARCHITECTS | 1 | 08/31/2023 |
| NAPACH DESIGN GROUP | 1 | 05/03/2023 |
| SAFWAY ATLANTIC LLC | 16 | 04/19/2023 |
| HLW INTERNATIONAL | 1 | 02/24/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| DVA Advisors | 233 | 03/21/2026 |
| EUROCELT EXPEDITING, INC | 50 | 03/21/2026 |
| WILLIAM VITACCO ASSOCIATES | 52 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 36 | 03/21/2026 |
| NEW YORK SIGN CONSULTANTS | 8 | 03/21/2026 |
| ALL IN PERMIT CONSULTANTS | 1 | 03/21/2026 |
| FRAMEWORK CONSULTANTS | 2 | 03/21/2026 |
| ARUP | 2 | 03/21/2026 |
| LOMBARDO BUILDING CONSULTANTS | 4 | 03/21/2026 |
| LOUIS STRIAR | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| TURNER CONSTRUCTION COMPANY | General Contractor | 56 | 07/08/2026 |
| PLATFORM SOLUTIONS, INC | General Contractor | 46 | 07/08/2026 |
| STRUCTURE TONE, LLC | General Contractor | 45 | 07/08/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 26 | 07/08/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 25 | 08/25/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 20 | 07/08/2026 |
| RAEL AUTOMATIC SPR.CO INC | Fire Protection | 17 | 07/08/2026 |
| TISHMAN INTERIORS CORP | General Contractor | 17 | 07/08/2026 |
| PAR PLUMBING CO., INC | Plumbing | 13 | 08/30/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 10 | 07/08/2026 |
| PREFERRED MECHANICAL INC | Plumbing | 10 | 07/29/2026 |
| AGGRESSIVE FIRE PROT LLC | Fire Protection | 8 | 07/15/2026 |
| JT MAGEN & COMPANY INC | General Contractor | 8 | 07/08/2026 |
| PHASE 3 INTERIORS LLC | General Contractor | 7 | 07/08/2026 |
| PREFERRED SPKLR AND MECH | Fire Protection | 7 | 07/28/2026 |
| NYC FIRE SPRINKLER CORP | Fire Protection | 6 | 07/08/2026 |
| SWINERTON BUILDERS | General Contractor | 5 | 07/08/2026 |
| ELTON ZYKA | Electrical | 5 | 03/21/2026 |
| REIDY CONTRACTING GROUP | General Contractor | 5 | 07/04/2026 |
| PETRETTI & ASSOCIATES LLC | General Contractor | 4 | 07/08/2026 |
| BENSON INDUSTRIES INC | General Contractor | 4 | 07/08/2026 |
| GOING SIGN SVCNG | Scaffold | 4 | 07/08/2026 |
| LAB PLBG & HTG CO INC | Plumbing | 4 | 07/08/2026 |
| ALLRAN ELECTRIC OF NY LLC | Electrical | 3 | 03/22/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 3 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CONSULTING AND TESTING SE | 6152 | 6 | 08/26/2026 |
| SOCOTEC ENGINEERING | 4983 | 11 | 08/11/2026 |
| AK ENGINEERING PC | 678 | 128 | 08/03/2026 |
| SAG ENGINEERING & CONSULT | 608 | 5 | 06/30/2026 |
| OUTSOURCE SPECIAL INSPECT | 2827 | 4 | 04/23/2026 |
| ALAN MARGOLIN & ASSOC | 423 | 4 | 01/22/2026 |
| ENTHINK ENGINEERS LLC | 6247 | 1 | 03/12/2025 |
| JS BUILDING CONSULTING | 4959 | 5 | 01/06/2025 |
| DNA CONTROLLED INSPECTION | 554 | 59 | 09/30/2024 |
| ATLAS ATC ENGINEERING INC | 8011 | 50 | 07/23/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | WAGER CONTRACTING CO, INC | 08/31/2026 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 08/27/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM CONSTRUCTION MGMT LLC | 08/24/2026 |
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 08/24/2026 |
| DOB NOW | Plumbing | Permit Issued | PREFERRED MECHANICAL INC | 07/28/2026 |
| DOB NOW | Sprinklers | Permit Issued | PREFERRED SPKLR AND MECH | 07/27/2026 |
| DOB NOW | Sprinklers | Permit Issued | PREFERRED SPKLR AND MECH | 07/27/2026 |
| DOB NOW | Sprinklers | Permit Issued | AGGRESSIVE FIRE PROT LLC | 07/14/2026 |
| DOB NOW | Structural | Permit Issued | STRUCTURE TONE, LLC | 07/06/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 07/06/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 07/06/2026 |
| DOB NOW | General Construction | Permit Issued | REIDY CONTRACTING GROUP | 07/02/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | REIDY CONTRACTING GROUP | 07/01/2026 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 06/25/2026 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 06/24/2026 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 06/17/2026 |
| DOB NOW | Standpipe | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 06/17/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | HARBOUR MECHANICAL CORP | 05/15/2026 |
| DOB NOW | Plumbing | Permit Issued | PAR PLUMBING CO., INC | 05/07/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR FIRE PROTECTION LLC | 05/06/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | ICON INTERIORS INC | 04/27/2026 |
| DOB NOW | General Construction | Permit Issued | ICON INTERIORS INC | 04/27/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 04/16/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 04/16/2026 |
| DOB NOW | General Construction | Permit Issued | BENCHMARK BUILDERS LLC | 04/01/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 03/19/2026 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 03/19/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | REIDY CONTRACTING GROUP | 02/10/2026 |
| DOB NOW | Plumbing | Permit Issued | PREFERRED MECHANICAL INC | 02/04/2026 |
| DOB NOW | Standpipe | Signed-off | ABCO-PEERLESS SPRKLR CORP | 02/03/2026 |
| DOB NOW | Sprinklers | Signed-off | ABCO-PEERLESS SPRKLR CORP | 02/03/2026 |
| DOB NOW | Sprinklers | Permit Issued | SIRINA FIRE PROT CORP | 12/24/2025 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 12/24/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 12/24/2025 |
| DOB NOW | Structural | Signed-off | STRUCTURE TONE, LLC | 09/11/2025 |
| DOB NOW | Sprinklers | Signed-off | LAWRENCE J. LEVINE | 08/20/2025 |
| DOB NOW | Standpipe | Signed-off | LAWRENCE J. LEVINE | 08/19/2025 |
| DOB NOW | Plumbing | Signed-off | PAR PLUMBING CO., INC | 08/14/2025 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 08/13/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 08/13/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/11/2026 | Permit Issued | JRM CONSTRUCTION MGMT LLC | Air Conditioning Systems, Ventilation Systems | |
| 08/03/2026 | Signed-off | STRUCTURE TONE, LLC | Air Conditioning Systems, Heating and Air Conditioning Systems | |
| 06/30/2026 | Permit Issued | STRUCTURE TONE, LLC | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Above Air MCW-011B-4-E1M0 39,300 BTU · Crac Unit ×1 Florida Heat Pump CL048 43,800 BTU · Wshp ×1 Ventilation Greenheck CSP-A1050-VG 1,000 CFM · Exhaust Fan ×3 |
| 05/05/2026 | Signed-off | STRUCTURE TONE, LLC | Air Conditioning Systems, Heating Systems | |
| 04/23/2026 | Permit Issued | ICON INTERIORS INC | Heating and Air Conditioning Systems | Heat / Cool Geocomfort VS030 32,000 BTU · Wshp ×1 |
| 04/01/2026 | Signed-off | STRUCTURE TONE, LLC | Air Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems | Cooling Liebert MTC69WD 1,800 CFM · Wshp ×12 MT060HE 1,800 CFM · Wshp ×10 MT036HE1A 3 tons · Wshp ×2 MTC38WD 3 tons · Wshp ×2 Heat / Cool Climatemaster TCH-036 33,500 BTU · Wshp ×20 TCH-048 46,400 BTU · Wshp ×18 TCH-024 22,900 BTU · Wshp ×12 Ventilation N/A N/a 400 CFM · Fan Powered Box ×2 |
| 03/19/2026 | Permit Issued | HARBOUR MECHANICAL CORP | Air Conditioning Systems, Heating and Air Conditioning Systems | Cooling Above Air MCW-011S-4-0000-EC-00-EFO-XS 38,000 BTU · Crac Unit ×1 Heat / Cool |
| 03/05/2026 | Signed-off | PETRETTI & ASSOCIATES LLC | Air Conditioning Systems | Cooling Above Air MCW-004S1-7-00000-EC-00-UF1-XS 22,300 BTU ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/11/2026 | — | — | Sprinkler System |
| 08/03/2026 | Signed-off | ABCO-PEERLESS SPRKLR CORP | Sprinkler System |
| 06/30/2026 | Permit Issued | PREFERRED SPKLR AND MECH | Sprinkler System |
| 05/05/2026 | Signed-off | PAR FIRE PROTECTION LLC | Sprinkler System |
| 04/23/2026 | Permit Issued | AGGRESSIVE FIRE PROT LLC | — |
| 04/01/2026 | Signed-off | ABCO-PEERLESS SPRKLR CORP | 963 heads |
| 03/28/2026 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | Sprinkler System |
| 03/19/2026 | Permit Issued | PAR FIRE PROTECTION LLC | 259 heads |
| 03/05/2026 | Signed-off | A & F FIRE PROTECTION CO | 23 heads |
| 08/20/2025 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/11/2026 | Permit Issued | PAR PLUMBING CO., INC | Water/Sanitary |
| 08/03/2026 | Permit Issued | PREFERRED MECHANICAL INC | Water/Sanitary |
| 06/30/2026 | Permit Issued | PREFERRED MECHANICAL INC | Water/Sanitary |
| 05/05/2026 | Signed-off | PAR PLUMBING CO., INC | Water/Sanitary |
| 04/23/2026 | Permit Issued | PAR PLUMBING CO., INC | Water/Sanitary |
| 04/01/2026 | Signed-off | PREFERRED MECHANICAL INC | — |
| 03/28/2026 | Permit Issued | PAR PLUMBING CO., INC | Water/Sanitary |
| 03/19/2026 | Permit Issued | PAR PLUMBING CO., INC | Water/Sanitary |
| 03/05/2026 | Permit Issued | PREFERRED MECHANICAL INC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/27/2026 | Permit Issued | UNI-LITE ELECTRIC, LLC | General Wiring |
| 07/10/2026 | Permit Issued | UNI-LITE ELECTRIC, LLC | General Wiring |
| 07/01/2026 | Permit Issued | POLO ELECTRIC CORP. D/B/A | General Wiring |
| 06/01/2026 | Permit Issued | ALLRAN ELECTRIC OF NY LLC | General Wiring |
| 04/24/2026 | Complete | FRED GELLER ELEC'L INC. | — |
| 04/22/2026 | Complete | FRED GELLER ELEC'L INC. | — |
| 03/20/2026 | Permit Issued | NEAD ELECTRIC INC. | General Wiring |
| 01/08/2026 | Permit Issued | ALLRAN ELECTRIC OF NY LLC | General Wiring |
| 12/17/2025 | Permit Issued | ALLRAN ELECTRIC OF NY LLC | General Wiring |
| 08/18/2025 | Complete | ALLRAN ELECTRIC OF NY LLC | General Wiring |
| 04/16/2025 | Complete | FRED GELLER ELEC'L INC. | — |
| 03/13/2025 | Complete | NEAD ELECTRIC INC. | General Wiring |
| 01/13/2025 | Complete | H. & L. ELECTRIC INC | General Wiring |
| 01/03/2025 | Complete | ALLRAN ELECTRIC OF NY LLC | General Wiring |
| 01/03/2025 | Complete | ALLRAN ELECTRIC OF NY LLC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/30/2026 | Permit Issued | PREFERRED MECHANICAL INC | Steel |
| 05/05/2026 | Signed-off | STRUCTURE TONE, LLC | Steel |
| 04/01/2026 | Signed-off | PREFERRED MECHANICAL INC | Steel |
| 03/05/2026 | Signed-off | A & F FIRE PROTECTION CO | 1 scope_items |
| — | — | — | Steel |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/21/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/18/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/14/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 08/13/2026 | Pass-Final PL - Underground | Pass | View ↗ |
| 08/07/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/07/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 07/17/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 07/17/2026 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 07/17/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 07/15/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/29/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/22/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/01/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/23/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 03/17/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 12/10/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 11/25/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/18/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/13/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 11/12/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/12/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/17/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/21/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/19/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/11/2026 | Fire-Resistant Penetrations and Joints | DANIEL CREIGHTON | special |
| 08/11/2026 | Fire-Resistance Rated Construction | DANIEL CREIGHTON | progress |
| 07/29/2026 | Sprinkler Systems | Ari Kamo | special |
| 07/29/2026 | Energy Code Compliance Inspections | Ari Kamo | progress |
| 07/29/2026 | Post-installed Anchors | Ari Kamo | special |
| 07/29/2026 | Mechanical Systems | Ari Kamo | special |
| 07/29/2026 | Lighting controls | Ari Kamo | energy_progress |
| 07/29/2026 | HVAC-R and service water heating system controls | Ari Kamo | energy_progress |
| 07/29/2026 | HVAC-R and service water heating equipment | Ari Kamo | energy_progress |
| 07/29/2026 | HVAC-R and service water piping design and insulation | Ari Kamo | energy_progress |
| 07/29/2026 | Duct leakage testing, insulation and design | Ari Kamo | energy_progress |
| 07/29/2026 | Post-installed Anchors | Ari Kamo | special |
| 07/29/2026 | Final | Ari Kamo | progress |
| 07/29/2026 | Interior lighting power | Ari Kamo | energy_progress |
| 07/29/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 07/29/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 07/29/2026 | Maintenance information | Ari Kamo | energy_progress |
| 07/27/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 07/27/2026 | Sprayed fire-resistant materials | ALEXIS SCHLESSINGERMAN | special |
| 07/27/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 07/21/2026 | Post-installed Anchors | Ari Kamo | special |
| 07/21/2026 | Sprinkler Systems | Ari Kamo | special |
| 07/21/2026 | Post-installed Anchors | Ari Kamo | special |
| 07/21/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 07/21/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Cravath, Swaine & Moore | Office | Floors 9, 10, 13, 24–37 | Project M01436618 Project M00873109 Project M00873114 Project M00873117 Project M00803647 Project M00803668 Project M00803686 Project M00843808 Project M00843821 Project M00843836 Project M00803020 Project M08053395 |
| Vista | Office | Floor 57 | Project M01406455 |
| LMR Partners | Office | Floors 11, 12 | Project M01384763 |
| Clifford Chance | Office | Floors 38–42 | Project M01373728 Project M01356130 Project M00969302 Project M00808604 Project M00808641 Project M00808644 Project M00814549 Project M00834649 Project M00820151 |
| BBVA | Office | Floors 5, 6, 8, 9 | Project M01347832 Project M01166064 Project M00943156 |
| The D. E. Shaw Group | Office | Floors 47–56 | Project M01345701 Project M01233705 Project M01121368 Project M00905720 Project M00905726 Project M00897167 Project M00897174 Project M00897179 Project M00897184 Project M00851888 Project M00851866 Project M00851876 |
| Crowell & Moring | Office | Floors 43–46 | Project M01237162 Project M00814100 Project M00814108 Project M00814116 Project M00814126 Project M00821296 |
| KPMG | Office | Floors 12–23 | Project M01190576 Project M01190591 Project M01190598 Project M01190602 Project M01062724 Project M01063007 Project M01063037 |
| Prudential Financial | Office | — | Project M01023273 |