← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Wavecrest Gardens
20-20 SEAGIRT BOULEVARD · BIN 4440246
💬 Discuss this project
1952Year Built
6Stories
D1Building Class
R5Zoning
—Gross Floor Area
572Units
3 Active Violations 1 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: Rockaway One Company · 1.34 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalMechanicalEquipmentLandscapeGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
BulkheadPelican Management INC.1p · 1 filing · 6 docs
Floor 1Installation of Heavy Duty Sidewalk Shed3p · 1 filing · 2 docs
BasementPelican Management INC.1p · 1 filing · 6 docs
Site & exteriorPelican Management INC.4p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Rockaway One1003/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Asr Engineering101/24/2024
Firm Engineering108/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Pelican Management203/21/2026
Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A J Ianni Electrical ContsElectrical203/22/2026
AL-Arsh ConstructionGeneral Contractor203/21/2026
AL-Arsh ConstructionScaffold203/21/2026
Cardone ConcreteGeneral Contractor103/21/2026
AM Brothers ConstructionGeneral Contractor111/04/2020
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Benazzi Engineering5603108/07/2023
Firm Engineering6012108/07/2023
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
09/02/2026
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING AND WEST AND SOUTH WALL IN THE PRIVATE HALLWAY…
HPD violation · open
03/11/2026
§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE,…
HPD violation · closed
03/11/2026
§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN…
HPD violation · closed
03/11/2026
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT NORTH WALL AT WINDOW IN THE…
HPD violation · closed
56 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offAL-Arsh Construction01/25/2024
DOB NOWGeneral ConstructionSigned-offAL-Arsh Construction08/24/2023
BISOTISSUEDAM Brothers Construction11/04/2020
BISOTISSUEDCardone Concrete03/26/2010
9 projects · most recent 04/05/2023
General Wiring
FiledStatusContractorScope
04/05/2023CancelledA J Ianni Electrical ContsGeneral Wiring
10/06/2020Permit IssuedA J Ianni Electrical ContsGeneral Wiring
09/01/2020Permit IssuedA J Ianni Electrical ContsGeneral Wiring
02/06/2020Permit IssuedA J Ianni Electrical ContsGeneral Wiring
08/20/2019Permit IssuedA J Ianni Electrical ContsGeneral Wiring
08/09/2019Permit IssuedA J Ianni Electrical ContsGeneral Wiring
07/13/2019Permit IssuedVlashava Electric ContractingGeneral Wiring
07/07/2019CompleteA J Ianni Electrical ContsGeneral Wiring
06/19/2019CompleteA J Ianni Electrical ContsGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/07/2023Energy Code Compliance InspectionsTerence Hudsonprogress
08/04/2023Tenant Protection Plan ComplianceGregory Benazzispecial
08/04/2023MasonryTerence Hudsonspecial
08/04/2023Structural Stability – Alterations of existing buildingsTerence Hudsonspecial
07/24/2023FinalTerence Hudsonprogress
42 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account