Elevator apt, fireproof without stores
Cooper Park (NYCHA)
20 DEBEVOISE AVENUE · BIN 3327827
💬 Discuss this project
1950Year Built
8Stories
D3Building Class
R6Zoning
611,340 sfGross Floor Area
700Units
LL97 Covered11 Active Violations 7 unresolved · 4 paperwork only 1 old, status unconfirmed ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 510,960 sf lot · 1.2 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFISP facade inspection using rope access1p · 1 filing · 3 docs
Floor 1State Phase II a Boiler Replacement and Hot Water HeatersUnder Construction1p · 1 filing · 20 docs
CellarState Phase II a Boiler Replacement and Hot Water HeatersUnder Construction112p · 2 filings · 20 docs
Site & exteriorState Phase II a Boiler Replacement and Hot Water HeatersUnder Construction7p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority5407/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cameron Engineering1810/23/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Tarek M. Zeid, P.E903/21/2026
Smep Design & Consultation203/21/2026
Tarek M Zeid P E903/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dynamic USGeneral Contractor1307/08/2026
Dynamic ContractingPlumbing707/08/2026
Alliance Elevator CompanyElectrical203/21/2026
Dynamic ContractingGeneral Contractor203/22/2026
Skyline P & HPlumbing203/22/2026
Waschitz NElectrical203/21/2026
Jemco Electric ContractorsElectrical203/22/2026
HY-Lee Electric CoElectrical203/21/2026
Polaris Electrical ConstructionElectrical103/22/2026
Dynamic Electric SystemElectrical103/22/2026
M & M Elect'l ContractingElectrical103/21/2026
Stasi/Dallas Electrical ContElectrical103/21/2026
Vic ElectricElectrical103/21/2026
Mike Lewkovicz Electric CompanyElectrical103/21/2026
Carbone JohnElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Distinct Engineering Solu26411710/23/2025
Building Lifecycle
All (115)Filed (19)Permit Issued (18)Signed Off (1)Facade (FISP) (8)Violation (19)Inspection (4)Objection (16)Special Inspection (30)
06/16/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
B01129640-I1
06/09/2026
Permit issued — Suspended Scaffold
B01129640-I1-SC
02/04/2026
Permit issued — Structural
B00447683-S1-ST
01/27/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/22/2026
Permit issued — Plumbing
B00447989-I1-PL
11/17/2025
Permit issued — Mechanical Systems
B00447683-I1-MS
11/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
YAZAN YANES
11/07/2025
Special inspection requirement — Final
YAZAN YANES
11/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Ramnarayan Tirumala
11/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
Ramnarayan Tirumala
11/07/2025
Special inspection requirement — Mechanical Systems
YAZAN YANES
11/07/2025
Special inspection requirement — Chimneys and vents
YAZAN YANES
11/07/2025
Special inspection requirement — Energy Code Compliance
YAZAN YANES
11/07/2025
Special inspection requirement — Heating Systems
YAZAN YANES
11/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
Ramnarayan Tirumala
10/28/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/23/2025
Filed — Alteration
Building 9-Work in Tank room only- Demolition of steam and condensate piping, condensate pumps and vacuum pumps. Replacement of condensate pumps, vacuum pumps and piping. New flues for domestic hot water heaters
B00447683-P9
10/06/2025
Special inspection requirement — Final
Ramnarayan Tirumala
10/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Ramnarayan Tirumala
10/06/2025
Special inspection requirement — Mechanical Systems
Ramnarayan Tirumala
10/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
Ramnarayan Tirumala
10/06/2025
Special inspection requirement — Energy Code Compliance
Ramnarayan Tirumala
10/06/2025
Special inspection requirement — Chimneys and vents
Ramnarayan Tirumala
10/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ramnarayan Tirumala
10/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
Ramnarayan Tirumala
10/06/2025
Special inspection requirement — Heating Systems
Ramnarayan Tirumala
08/04/2025
Filed — Alteration
Building 9- Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas piping to DHW Htr; new hot & cold water supply/return piping to DHW Htr; install temp DHW Htr as shown on plans
B00447989-P3
07/31/2025
Special inspection requirement — Post-installed Anchors
Ramnarayan Tirumala
07/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ramnarayan Tirumala
07/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/23/2025
Permit issued — Plumbing
B00447683-S2-PL
03/06/2025
Permit issued — Structural
B00447683-S1-ST
03/06/2025
Permit issued — General Construction
B00447683-S4-GC
03/06/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/13/2024
Permit issued — Plumbing
B00447989-I1-PL
12/12/2024
Permit issued — Suspended Scaffold
B01129640-I1-SC
12/05/2024
Objection raised — Other
12/05/2024
Objection resolved — Addressed
12/03/2024
Objection resolved — Addressed
12/02/2024
Objection raised — Other
11/19/2024
Filed — Alteration
Building 9-Work in Tank room only- Demolition of steam and condensate piping, condensate pumps and vacuum pumps. Replacement of condensate pumps, vacuum pumps and piping. New flues for domestic hot water heaters
B00447683-P8
11/19/2024
Special inspection requirement — Permanent certificate
11/19/2024
Special inspection requirement — Maintenance information
11/18/2024
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
B01129640-I1
11/04/2024
Special inspection requirement — Final
Ramnarayan Tirumala
11/04/2024
Special inspection requirement — Energy Code Compliance
Ramnarayan Tirumala
11/04/2024
Special inspection requirement — Mechanical Systems
Ramnarayan Tirumala
11/04/2024
Special inspection requirement — Heating Systems
Ramnarayan Tirumala
11/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ramnarayan Tirumala
11/04/2024
Special inspection requirement — Chimneys and vents
Ramnarayan Tirumala
11/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
Ramnarayan Tirumala
11/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Ramnarayan Tirumala
10/23/2024
Filed — Alteration
Building 9-Work in Tank room only- Demolition of steam and condensate piping, condensate pumps and vacuum pumps. Replacement of condensate pumps, vacuum pumps and piping. New flues for domestic hot water heaters
B00447683-P7
08/07/2024
Permit issued — Mechanical Systems
B00447683-I1-MS
07/15/2024
Violation issued (FDNY_NOV, closed)
07/12/2024
Objection resolved — Addressed
06/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/03/2024
Objection raised — Scope
05/31/2024
Filed — Alteration
Building 9- Removal of HW tank/heater, cold water supply & HW supply/return to tank.Install new gas DHW Htr,, HW re-circ pumps; new gas piping to DHW Htr; new hot & cold water supply/return piping to DHW Htr; install temp DHW Htr as shown on plans
B00447989-P2
05/28/2024
Filed — Alteration
Building 9-Work in Tank room only- Demolition of steam and condensate piping, condensate pumps and vacuum pumps. Replacement of condensate pumps, vacuum pumps and piping. New flues for domestic hot water heaters
B00447683-P6
Latest 60 of 115 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System06/09/2026
DOB NOWStructuralPermit IssuedDynamic US02/04/2026
DOB NOWPlumbingSigned-offDynamic Contracting01/22/2026
DOB NOWMechanical SystemsPermit IssuedDynamic US11/17/2025
DOB NOWPlumbingPermit IssuedDynamic Contracting04/23/2025
DOB NOWStructuralPermit IssuedDynamic US03/06/2025
DOB NOWGeneral ConstructionPermit IssuedDynamic US03/06/2025
DOB NOWPlumbingSigned-offDynamic Contracting12/13/2024
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System12/12/2024
DOB NOWMechanical SystemsPermit IssuedDynamic US08/07/2024
DOB NOWPlumbingPermit IssuedDynamic Contracting05/17/2024
DOB NOWGeneral ConstructionPermit IssuedDynamic US04/05/2024
DOB NOWStructuralPermit IssuedDynamic US04/05/2024
DOB NOWPlumbingSigned-offDynamic Contracting01/12/2024
DOB NOWMechanical SystemsPermit IssuedDynamic US08/08/2023
DOB NOWPlumbingPermit IssuedDynamic Contracting06/15/2023
DOB NOWStructuralPermit IssuedDynamic US05/03/2023
DOB NOWGeneral ConstructionPermit IssuedDynamic US05/03/2023
BISOTISSUEDM.S.T. General Contracting03/26/2015
BISEQISSUEDM.S.T. General Contracting11/06/2014
BISEQISSUEDM.S.T. General Contracting11/06/2014
BISEQISSUEDM.S.T. General Contracting11/06/2014
BISEQISSUEDE. Coast Construction & Design03/18/2004
BISEQISSUEDE. Coast Construction & Design09/08/2003
BISPLISSUEDReyvin Plumbing & Heating07/11/2000
BISOTISSUEDGCJ Construction05/10/2000
BISPLISSUEDGCJ Construction08/02/1999
BISOTISSUEDConlin of N.Y08/02/1999
BISPLISSUEDDelphi Plumbing & Heating12/16/1997
BISOTISSUEDA.h.a.general Construction12/16/1997
BISOTISSUEDA.H.A. General Construction11/21/1995
1 project · most recent 10/23/2025
Heating Systems
FiledStatusContractorScope
10/23/2025Permit IssuedDynamic USHeating Systems
2 projects · most recent 10/23/2025
Gas Water/Sanitary
FiledStatusContractorScope
10/23/2025Permit IssuedDynamic ContractingGas
08/04/2025Signed-offDynamic ContractingGas, Water/Sanitary
8 projects · most recent 07/08/2026
General Wiring
FiledStatusContractorScope
07/08/2026CompletePolaris Electrical ConstructionGeneral Wiring
04/14/2025CompletePolaris Electrical Construction—
04/14/2025CompletePolaris Electrical Construction—
12/31/2024CancelledDynamic Electric SystemGeneral Wiring
02/22/2023CompleteTru-Val ElectricGeneral Wiring
10/08/2020CompleteJemco Electric ContractorsGeneral Wiring
10/24/2018CancelledJemco Electric ContractorsGeneral Wiring
10/24/2018CancelledJemco Electric ContractorsGeneral Wiring
1 project · most recent 10/23/2025
Steel Concrete Masonry
FiledStatusContractorScope
10/23/2025Permit IssuedDynamic USSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/28/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/06/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
11/07/2025Fire-Resistant Penetrations and JointsYAZAN YANESspecial
11/07/2025Chimneys and ventsYAZAN YANESspecial
11/07/2025Mechanical SystemsYAZAN YANESspecial
11/07/2025HVAC-R and service water heating equipmentRamnarayan Tirumalaenergy_progress
11/07/2025HVAC-R and service water heating system controlsRamnarayan Tirumalaenergy_progress
11/07/2025HVAC-R and service water piping design and insulationRamnarayan Tirumalaenergy_progress
11/07/2025Heating SystemsYAZAN YANESspecial
11/07/2025Energy Code ComplianceYAZAN YANESprogress
11/07/2025FinalYAZAN YANESprogress
10/06/2025Mechanical SystemsRamnarayan Tirumalaspecial
10/06/2025HVAC-R and service water piping design and insulationRamnarayan Tirumalaenergy_progress
10/06/2025HVAC-R and service water heating system controlsRamnarayan Tirumalaenergy_progress
10/06/2025HVAC-R and service water heating equipmentRamnarayan Tirumalaenergy_progress
10/06/2025FinalRamnarayan Tirumalaprogress
10/06/2025Energy Code ComplianceRamnarayan Tirumalaprogress
10/06/2025Chimneys and ventsRamnarayan Tirumalaspecial
10/06/2025Fire-Resistant Penetrations and JointsRamnarayan Tirumalaspecial
10/06/2025Heating SystemsRamnarayan Tirumalaspecial
07/31/2025Fire-Resistant Penetrations and JointsRamnarayan Tirumalaspecial
07/31/2025Post-installed AnchorsRamnarayan Tirumalaspecial
11/19/2024Maintenance information—energy_progress
11/19/2024Permanent certificate—energy_progress
11/04/2024HVAC-R and service water heating system controlsRamnarayan Tirumalaenergy_progress
11/04/2024HVAC-R and service water heating equipmentRamnarayan Tirumalaenergy_progress
11/04/2024Chimneys and ventsRamnarayan Tirumalaspecial
Latest 25 of 61.
▾Documents — 174 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch13
08/20/2026B00447683-P1Request digital key ↗
08/20/2026B00447683-S4Request digital key ↗
08/20/2026B00447683-S4Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
08/20/2026B00447683-I1Request digital key ↗
08/20/2026B00447683-P9Request digital key ↗
08/20/2026B00447683-P8Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/25/2026B00447989-I1Request digital key ↗
08/25/2026B00447989-P2Request digital key ↗
08/25/2026B00447989-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION5
11/05/2014340201524Open ↗
11/05/2014340201533Open ↗
11/05/2014340201515Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION4
03/27/2015320831285Open ↗
11/05/2014340201524Open ↗
11/05/2014340201533Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications57
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/25/2026B00447989-I1Open ↗
08/25/2026B00447989-P1Open ↗
08/25/2026B00447989-P2Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION14
10/13/2015320831285Open ↗
10/13/2015320831285Open ↗
07/13/2015340201524Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026B00447989-P3Open ↗
09/23/2026B00447989-P3Open ↗
09/02/2026B00447683-P9Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026B00447683-P9Open ↗
09/02/2026B00447683-P9Open ↗
09/01/2026B00447683-P8Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
11/05/2014340201524Open ↗
11/05/2014340201533Open ↗
11/05/2014340201515Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
11/05/2014340201524Open ↗
11/05/2014340201533Open ↗
11/05/2014340201515Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
11/05/2014340201524Open ↗
11/05/2014340201533Open ↗
11/05/2014340201515Open ↗
▸Environmental & Asbestos20
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
08/25/2026B00447989-I1Open ↗
08/25/2026B00447989-P1Open ↗
08/25/2026B00447989-P2Open ↗
Showing 3 of 19 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
10/13/2015320831285Open ↗
▸Energy Compliance5
▸BISTR8: Energy Code Progress Inspections3
09/25/2014320831285Open ↗
09/25/2014320831285Open ↗
08/15/2013320831285Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/13/2015320831285Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
11/05/2014340201515Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
11/05/2014340201524Open ↗
11/05/2014340201533Open ↗
11/05/2014340201515Open ↗
▸Approvals, Objections & Sign-offs49
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter21
08/20/2026B00447683-P2Open ↗
08/20/2026B00447683-P1Open ↗
08/20/2026B00447683-S4Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)20
08/13/2026B00447683-P7Open ↗
08/13/2026B00447683-S2Open ↗
08/13/2026B00447683-S4Open ↗
Showing 3 of 20 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
10/13/2015320831285Open ↗
07/13/2015340201524Open ↗
07/11/2015340201515Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter2
08/20/2026B00447683-S2Open ↗
08/20/2026B00447683-I1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/27/2015320831285Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/15/2013320831285Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
10/13/2015320831285Open ↗
08/15/2013320831285Open ↗
08/15/2013320831285Open ↗
▸Filing & Intake Forms6
▸BISEFILING JOB APPLICATION COVER SHEET3
11/05/2014340201524Open ↗
11/05/2014340201533Open ↗
11/05/2014340201515Open ↗
▸BISADDITIONAL INFORMATION2
10/27/2014320831285Open ↗
09/18/2014320831285Open ↗
▸BISEFILING COVER SHEET1
08/24/2013320831285Open ↗
▸Other Documents1
▸DOB NOWIRA Certification1
08/13/2026B01129640-I1Open ↗