← Back
Office with commercial, 1-6 stories
20 EAST 49 STREET
MANHATTAN · Midtown-Times Square · BIN 1035447
💬 Discuss this project
1930Year Built
6Stories
O5Building Class
C5-3Zoning
14,060 sfGross Floor Area
11Units
2 Open Violations ▸
Office with commercial, 1-6 stories · Owner of record: 20 E. 49TH ST. LLC · 2,513 sf lot · 5.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof17p · 3 filings · 20 docs
Floor 73p · 1 filing · 13 docs
Floor 612p · 1 filing · 7 docs
Floor 5
Floor 44p · 1 filing · 17 docs
Floor 3
Floor 223p · 4 filings · 20 docs
Floor 117p · 2 filings · 13 docs
Cellar17p · 2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
521 MAD1507/08/2026
20 EAST 49TH STREET1103/21/2026
20 E 49 STREET403/21/2026
TRI-STATE CONTRACTING OF*203/21/2026
20 E. 49TH ST. LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TERJESEN ASSOCIATES ARCHITECTS103/21/2026
SUPPORT BUILDINGS OF NEW YORK403/21/2026
SUPPORT BUILDINGS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ECONO AIR HEATING/COOLINGGeneral Contractor707/08/2026
STATIC CONSTRUCTION INCGeneral Contractor603/21/2026
LITHOS CONSTR SOLUTI INCGeneral Contractor203/21/2026
JAMES FAMULAROElectrical103/21/2026
MUZYKA, MAREKElectrical103/21/2026
ECKERT, BElectrical103/21/2026
WATER DYNAMIC P & H CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ABDUS SALAM C. ENGINEERS484304/07/2023
R.J. MCGEE ENGINEERING, P7878112/07/2022
JACK GREEN ASSOCIATES422304/19/2021
Building Lifecycle
All (74)Filed (8)Permit Issued (7)Signed Off (4)Violation (23)Objection (2)Special Inspection (30)
05/24/2023
Signed off — Alteration
Herewith filing for installation of one AC unit and associated mechanical duct work for 2nd floor of the existing commercial building. There is no change in use, egress or occupancy under this application.
M00839410-I1
05/23/2023
Signed off — Alteration
INSTALLATION OF HVAC SYSTEM IN ACCORDANCE WITH THE APPROVED PLANS.
M08040928-I1
05/19/2023
Permit issued — Mechanical Systems
M08040928-I1-MS
05/18/2023
Permit issued — General Construction
M00839410-I1-GC
05/04/2023
Permit issued — Mechanical Systems
M00839410-I1-MS
04/24/2023
Objection raised — Admin
04/24/2023
Objection resolved — Addressed
04/07/2023
Filed — Alteration
Herewith filing for installation of one AC unit and associated mechanical duct work for 2nd floor of the existing commercial building. There is no change in use, egress or occupancy under this application.
M00839410-I1
03/13/2023
Signed off — Alteration
Herewith filing General Construction drawings for removal of interior non load bearing partition walls and installing new partitions, removal of A/C unit and air handler, refurbishing windows and installing new A/C
M00562416-I1
03/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
Rizwan Salam
03/13/2023
Special inspection requirement — HVAC-R and service water heating system controls
Rizwan Salam
03/06/2023
Special inspection requirement — Final
Rizwan Salam
03/06/2023
Special inspection requirement — Maintenance information
Rizwan Salam
03/06/2023
Special inspection requirement — Energy Code Compliance Inspections
Rizwan Salam
03/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
IDRIS SALAM
03/06/2023
Special inspection requirement — Mechanical Systems
IDRIS SALAM
01/23/2023
Filed — Alteration
Herewith filing General Construction drawings for removal of interior non load bearing partition walls and installing new partitions, removal of A/C unit and air handler, refurbishing windows and installing new A/C
M00562416-P1
01/23/2023
Special inspection requirement — Maintenance information
Rizwan Salam
01/23/2023
Special inspection requirement — HVAC-R and service water heating system controls
Rizwan Salam
01/23/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Rizwan Salam
01/23/2023
Special inspection requirement — HVAC-R and service water heating equipment
Rizwan Salam
01/23/2023
Special inspection requirement — Mechanical Systems
IDRIS SALAM
01/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
IDRIS SALAM
01/23/2023
Special inspection requirement — Energy Code Compliance Inspections
Rizwan Salam
01/23/2023
Special inspection requirement — Final
Rizwan Salam
01/18/2023
Special inspection requirement — Maintenance information
Rizwan Salam
01/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
IDRIS SALAM
01/18/2023
Special inspection requirement — Energy Code Compliance Inspections
Rizwan Salam
01/18/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Rizwan Salam
01/18/2023
Special inspection requirement — HVAC-R and service water heating system controls
Rizwan Salam
01/18/2023
Special inspection requirement — HVAC-R and service water heating equipment
Rizwan Salam
12/07/2022
Filed — Alteration
INSTALLATION OF HVAC SYSTEM IN ACCORDANCE WITH THE APPROVED PLANS.
M08040928-I1
11/16/2022
Special inspection requirement — Final
Robert McGee
11/16/2022
Special inspection requirement — Mechanical Systems
Robert McGee
03/18/2022
Special inspection requirement — Final
Rizwan Salam
03/18/2022
Special inspection requirement — Mechanical Systems
IDRIS SALAM
09/14/2021
Permit issued — Mechanical Systems
M00562416-I1-GC-CX
09/01/2021
Permit issued — General Construction
M00562416-I1-GC-CX
08/11/2021
Filed — Alteration
Herewith filing General Construction drawings for removal of interior non load bearing partition walls and installing new partitions, removal of A/C unit and air handler, refurbishing windows and installing new A/C
M00562416-I1
04/27/2021
Signed off — Alteration
MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00318916-I1
04/20/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
04/19/2021
Filed — Alteration
PLUMBING AND SPRINKLER MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00318927-P1
04/14/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
04/09/2021
Permit issued — Mechanical Systems
M00318916-I1-MS
12/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/12/2020
Filed — No Work
M00425549-I1
11/09/2020
Special inspection requirement — Public Assembly Emergency Lighting
sajjad javaid
07/30/2020
Permit issued — Plumbing
M00318927-I1-PL
07/28/2020
Filed — Alteration
MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00318916-I1
07/28/2020
Filed — Alteration
PLUMBING AND SPRINKLER MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00318927-I1
07/15/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
07/15/2020
Special inspection requirement — HVAC insulation and sealing
JACK GREEN
11/18/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/20/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/28/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/30/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/30/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offECONO AIR HEATING/COOLING05/19/2023
DOB NOWGeneral ConstructionSigned-offECONO AIR HEATING/COOLING05/18/2023
DOB NOWMechanical SystemsSigned-offECONO AIR HEATING/COOLING05/04/2023
DOB NOWMechanical SystemsSigned-offSTATIC CONSTRUCTION INC09/14/2021
DOB NOWGeneral ConstructionSigned-offSTATIC CONSTRUCTION INC09/01/2021
DOB NOWMechanical SystemsSigned-offLITHOS CONSTR SOLUTI04/09/2021
DOB NOWPlumbingPermit IssuedHYDRO PLBG & HTG CORP07/30/2020
BISOTISSUEDLITHOS CONSTR SOLUTI INC07/24/2020
BISMHISSUEDLITHOS CONSTR SOLUTI INC04/20/2018
BISPLISSUEDWATER DYNAMIC P & H CORP07/12/2017
BISOTISSUEDLITHOS CONSTR SOLUTI INC06/27/2017
BISEQISSUEDLITHOS CONSTR SOLUTI INC06/27/2017
BISOTISSUEDSQUAN CONSTRUCTION SERVIC10/27/2015
BISOTISSUEDJCT DEVELOPMENT NY INC10/16/2014
BISEQISSUEDTRI-STATE CONTRACTING OF*07/10/2014
BISEQISSUEDTRI-STATE CONTRACTING OF*07/02/2014
BISMHISSUEDBEDFORD INC11/13/2006
BISOTISSUEDBEDFORD INC10/16/2006
BISPLISSUEDFLINT MECHANICAL CORP10/11/2005
BISFPISSUEDIDEAL FIRE SYSTEMS, INC.10/04/2005
BISMHISSUEDN.J. PAPPAS CONSTRUCTION CORP.09/20/2005
BISOTISSUEDCHARTER COMM INC.01/07/2002
BISOTISSUEDJ PAPPAS CONSTRUCTION08/10/1999
BISOTISSUEDERIC N. SINGER & ASSOC AIA01/19/1996
BISEQISSUEDERIC N. SINGER & ASSOC AIA01/19/1996
1 project · most recent 04/19/2021
Gas Plumbing-Sprinkler
FiledStatusContractorScope
04/19/2021Permit IssuedWATER DYNAMIC P & H CORPGas, Plumbing-Sprinkler
1 project · most recent 08/05/2020
General Wiring
FiledStatusContractorScope
08/05/2020Permit IssuedMULTI-TECH ELECTRIC, INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
03/13/2023HVAC-R and service water heating equipmentRizwan Salamenergy_progress
03/13/2023HVAC-R and service water heating system controlsRizwan Salamenergy_progress
03/06/2023FinalRizwan Salamprogress
03/06/2023Maintenance informationRizwan Salamenergy_progress
03/06/2023Energy Code Compliance InspectionsRizwan Salamprogress
03/06/2023Fire-Resistant Penetrations and JointsIDRIS SALAMspecial
03/06/2023Mechanical SystemsIDRIS SALAMspecial
01/23/2023Maintenance informationRizwan Salamenergy_progress
01/23/2023HVAC-R and service water heating system controlsRizwan Salamenergy_progress
01/23/2023HVAC-R and service water piping design and insulationRizwan Salamenergy_progress
01/23/2023HVAC-R and service water heating equipmentRizwan Salamenergy_progress
01/23/2023Mechanical SystemsIDRIS SALAMspecial
01/23/2023Fire-Resistant Penetrations and JointsIDRIS SALAMspecial
01/23/2023Energy Code Compliance InspectionsRizwan Salamprogress
01/23/2023FinalRizwan Salamprogress
01/18/2023Maintenance informationRizwan Salamenergy_progress
01/18/2023Fire-Resistant Penetrations and JointsIDRIS SALAMspecial
01/18/2023Energy Code Compliance InspectionsRizwan Salamprogress
01/18/2023HVAC-R and service water piping design and insulationRizwan Salamenergy_progress
01/18/2023HVAC-R and service water heating system controlsRizwan Salamenergy_progress
01/18/2023HVAC-R and service water heating equipmentRizwan Salamenergy_progress
11/16/2022FinalRobert McGeeprogress
11/16/2022Mechanical SystemsRobert McGeespecial
03/18/2022FinalRizwan Salamprogress
03/18/2022Mechanical SystemsIDRIS SALAMspecial
Latest 25 of 33.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Casa LimoneRestaurant / Food ServiceCellar, Floors 1, 2, Mezzanine
Project M00425549 No Work · PA Certificate of Operation Issued · 11/12/2020
Project M00318916 Alteration · LOC Issued · 07/28/2020
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 223 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch4
09/03/2026M00562416-P1Request digital key ↗
09/03/2026M00562416-I1Request digital key ↗
09/01/2026M08040928-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/03/2026M00318927-I1Request digital key ↗
08/15/2026M00318927-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00318916-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
09/04/2026M00425549-I1Request digital key ↗
▸Applications & Permits29
▸BISPLAN / WORK APPROVAL APPLICATION12
07/23/2020140920813Open ↗
03/21/2019122203882Open ↗
09/17/2018122203882Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION10
07/24/2020140920813Open ↗
11/01/2018122203882Open ↗
04/23/2018123206280Open ↗
Showing 3 of 10 on file for this type
▸BISPLACE OF ASSEMBLY7
06/09/2017123023290Open ↗
06/05/2017123023290Open ↗
06/05/2017123023290Open ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZRD1-Zoning Resolution Determination1
11/05/2012121377045Open ↗
▸Seals & Professional Certifications67
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
08/23/2019122203882Open ↗
08/19/2019122203882Open ↗
07/12/2018123206280Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/02/2026M00839410-I1Open ↗
09/02/2026M00839410-I1Open ↗
09/02/2026M00839410-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/02/2026M00839410-I1Open ↗
09/01/2026M00562416-I1Open ↗
09/01/2026M00562416-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/03/2026M00318927-P1Open ↗
09/03/2026M00318927-I1Open ↗
09/03/2026M00562416-P1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
07/23/2020140920813Open ↗
04/16/2018123206280Open ↗
02/23/2017123023290Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
07/23/2020140920813Open ↗
07/10/2014140219671Open ↗
07/02/2014140219653Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
04/16/2018123206280Open ↗
06/23/2017121233058Open ↗
09/10/2014122127983Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
07/23/2020140920813Open ↗
07/10/2014140219671Open ↗
07/02/2014140219653Open ↗
▸BISProfessional and Owner Certification (POC3)1
06/23/2017121233058Open ↗
▸Trade Schedules & Equipment11
▸BISEQUIPMENT USE PERMITS5
07/12/2018123206280Open ↗
07/12/2018123206280Open ↗
07/12/2018123206280Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING2
03/28/2013121377045Open ↗
09/14/2012121377045Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
11/02/2015122203882Open ↗
07/16/2015122203882Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
07/12/2018123206280Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
06/23/2017121233058Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
09/10/2014122127983Open ↗
09/14/2012121377045Open ↗
▸BISTenant Protection Plan and Notes1
06/23/2017121233058Open ↗
▸Environmental & Asbestos23
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/03/2026M00318927-P1Open ↗
09/03/2026M00318927-I1Open ↗
09/03/2026M00562416-P1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
07/23/2020140920813Open ↗
04/16/2018123206280Open ↗
06/22/2017121233058Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice to Proceed5
08/13/2026M01365131-S1Open ↗
08/13/2026M08040928-I1Open ↗
08/13/2026M00318927-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWOER: Notice of Satisfaction3
08/13/2026M08040928-I1Open ↗
08/13/2026M01365131-S1Open ↗
08/13/2026M01365131-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
07/23/2020140920813Open ↗
04/20/2018123206280Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/10/2014122127983Open ↗
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
08/23/2019122203882Open ↗
08/19/2019122203882Open ↗
07/12/2018123206280Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
08/19/2019122203882Open ↗
07/12/2018123206280Open ↗
03/29/2018121233058Open ↗
Showing 3 of 4 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/12/2021140920813Open ↗
▸BISLIGHTING CONTROLS1
07/24/2020140920813Open ↗
▸BISTR8: Energy Code Progress Inspections1
11/10/2014122127983Open ↗
▸BISINTERIOR LIGHTING POWER1
07/24/2020140920813Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/23/2020140920813Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/12/2021140920813Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/23/2020140920813Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00562416-I1Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/23/2020140920813Open ↗
07/10/2014140219671Open ↗
07/02/2014140219653Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
07/24/2020140920813Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/12/2021140920813Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
07/24/2020140920813Open ↗
▸Approvals, Objections & Sign-offs21
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
05/12/2021140920813Open ↗
09/05/2019122203882Open ↗
08/19/2019122203882Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
03/28/2013121377045Open ↗
09/14/2012121377045Open ↗
09/05/2012121352678Open ↗
▸BISCONSTRUCTION CODE DETERMINATION2
03/18/2013121352678Open ↗
11/05/2012121377045Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/02/2017123023290Open ↗
11/10/2014122127983Open ↗
▸BISFINAL1
07/24/2020140920813Open ↗
▸BISSUPERSEDING LETTER1
11/01/2018122203882Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
09/14/2012121377045Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT11
07/23/2020140920813Open ↗
08/19/2019122203882Open ↗
03/21/2019122203882Open ↗
Showing 3 of 11 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
05/12/2021140920813Open ↗
▸Filing & Intake Forms20
▸BISBOROUGH INTAKE FORM6
09/05/2019122203882Open ↗
08/23/2019122203882Open ↗
08/23/2019122203882Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION6
04/10/2019122203882Open ↗
04/03/2019122203882Open ↗
03/21/2019122203882Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET5
04/16/2018123206280Open ↗
06/23/2017121233058Open ↗
12/03/2014122203882Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
07/23/2020140920813Open ↗
07/10/2014140219671Open ↗
07/02/2014140219653Open ↗
▸Other Documents2
▸BISPLOT DIAGRAM1
09/14/2012121377045Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/30/2010104577138Open ↗