| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B08010642 ↗ | 39 GARFIELD PLACE BROOKLYN | Alteration | Permit Issued | 11/04/2022 | 09/02/2026 | Design GEDEON ENGINEERING, PC Contractor YAFE MEOD CORP | Structural work renovation to existing floor framing, new floor framing, loadbearing to exterior walls in conjunction with enlargement fi… |
| B08010802 ↗ | 39 GARFIELD PLACE BROOKLYN | Alteration | Permit Issued | 11/04/2022 | 09/02/2026 | Design GEDEON ENGINEERING, PC Contractor YAFE MEOD CORP | Foundation work consisting of helical pile due to the soil condition filed in support of Alteration Type 1 # B08010313-I1. |
| M01346030 ↗ | 680 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 01/22/2026 | 06/10/2026 | Contractor ADVANTAGECONTRACTING COR | General Construction and Mechanical related work in conjunction with interior white box renovation of an existing storage space at the cella… |
| M00840328 ↗ | 48 WALL STREET MANHATTAN | Alteration | Signed-off | 03/11/2024 | 05/14/2025 | Design JACK GREEN ASSOCIATES Owner CBRE INC. A/A/F Contractor BIG APPLE PLBG CORP | Sp work scope |
| M00839952 ↗ | 48 WALL STREET MANHATTAN | Alteration | Signed-off | 03/13/2024 | 05/13/2025 | Design JACK GREEN ASSOCIATES Owner CBRE INC. A/A/F Contractor BIG APPLE PLBG CORP | Sprinkler work in assoc with LL |
| M00840092 ↗ | 48 WALL STREET MANHATTAN | Alteration | Signed-off | 03/11/2024 | 05/13/2025 | Design JACK GREEN ASSOCIATES Owner CBRE INC. A/A/F Contractor BIG APPLE PLBG CORP | SP work related to LL26/04 |
| Person | Filings | Most recent |
|---|---|---|
| Aleksandr Muzlayev | 76 | 03/18/2026 |
| ALEKSANDR MUZLAYEV | 51 | 01/13/2026 |
| ALEKSANDR MUZLAYEV | 41 | 08/14/2023 |
| ANDREA BELK | 4 | 04/19/2021 |
| MARIA ABDALKWY | 1 | 10/27/2020 |
| Name | Projects together | Most recent |
|---|---|---|
| JACK GREEN ASSOCIATES | 45 | 06/04/2025 |
| AKF ENGINEERS, LLP | 22 | 07/21/2023 |
| BLADYKAS ENGINEERING, P.C. | 21 | 03/18/2025 |
| ESNYC CONSULTING INC | 8 | 08/16/2024 |
| MG ENGINEERING D.P.C. | 8 | 09/03/2020 |
| REUTHER BOWEN | 5 | 05/31/2023 |
| STEVEN PAUL HAMMER | 5 | 09/18/2024 |
| EFH ARCHITECTURE | 4 | 05/31/2023 |
| FIFIELD PIAKER ELMAN ARCHITECTS | 4 | 03/17/2022 |
| MJ ENGINEERING & DESIGN | 4 | 12/15/2021 |
| BRICK CITY RECONSTRUCTION | 3 | 09/06/2024 |
| COLLECTIF ENGINEERING PLLC | 3 | 04/24/2024 |
| GOLDMAN COPELAND ASSOCIATES | 3 | 05/19/2022 |
| MUSE ARCHITECTS PLLC | 3 | 12/15/2022 |
| ST ENGINEERING SERVICES LLP | 3 | 02/27/2023 |
| THE DI SALVO ENGINEERING GROUP | 3 | 08/28/2023 |
| THE LIRO GROUP | 3 | 05/23/2022 |
| WSP | 3 | 08/24/2020 |
| ALLIEDENGINEERING ASSOCIATES | 2 | 02/13/2020 |
| BLACKNEY HAYES ARCHITECTS | 2 | 05/25/2022 |
| COSENTINI ASSOCIATES | 2 | 03/05/2021 |
| DEAN WORKS ARCHITECTURE PLLC | 2 | 11/04/2022 |
| DESIMONE CONSULTING ENGINEERS | 2 | 05/25/2022 |
| GEDEON ENGINEERING, PC | 2 | 02/06/2026 |
| HIGH LINE ENGINEERING PC | 2 | 12/20/2019 |
| Name | Projects together | Most recent |
|---|---|---|
| BIG APPLE PLBG CORP | 16 | 06/04/2025 |
| TURNER CONSTRUCTION COMPA | 12 | 05/09/2024 |
| SIRINA FIRE PROT CORP | 9 | 01/07/2025 |
| BSM MAINTENANCE CORP | 7 | 04/04/2024 |
| LUMITECH CONTRACTING CORP | 6 | 04/24/2024 |
| MACCARONE PLUMBING INC | 6 | 03/18/2025 |
| THE WHITING-TURNER CONTRA | 6 | 05/18/2023 |
| LORICH CONSTRUCTION MANAG | 5 | 05/26/2022 |
| RXR CONSTRUCTION& DEV LLC | 5 | 02/22/2022 |
| VILLAGE P & H NY INC | 5 | 06/05/2023 |
| ADI CONTRACTING LLC | 4 | 06/05/2023 |
| CMA PLUMBING & HEATING IN | 4 | 08/24/2022 |
| JEM FIRE PREVENTION INC | 4 | 02/13/2020 |
| CAPITAL CONTR P&H CORP | 3 | 08/29/2023 |
| CENTRAL CONSULTING & CONT | 3 | 10/13/2022 |
| MAMAIS CONTRACTING CORP | 3 | 04/26/2022 |
| WNW & SONS PLUMBING & HTG | 3 | 09/03/2020 |
| A & M WARSHAW PLBG & HTG | 2 | 06/13/2023 |
| ABCO-PEERLESS SPRKLR CORP | 2 | 11/18/2020 |
| ATLAS BUILDERS LLC | 2 | 09/06/2024 |
| B.R. FRIES & ASSOCIATES L | 2 | 11/09/2021 |
| BEDROCK PLBG. & HTG., INC | 2 | 02/27/2023 |
| CAPITAL CONTR P & H CORP | 2 | 10/13/2022 |
| F.S. SITE CORP | 2 | 11/10/2021 |
| FULL CIRCLE PLUMBING CORP | 2 | 03/12/2020 |
| Name | Projects together | Most recent |
|---|---|---|
| 1251 AMERICAS ASSOCIATES II, L.P. | 18 | 01/07/2025 |
| NORTHWELL HEALTH | 17 | 01/30/2024 |
| RXR REALTY | 13 | 08/31/2021 |
| CBRE | 10 | 06/04/2025 |
| CUSHMAN & WAKEFIELD | 9 | 01/07/2022 |
| CROWN ACQUISITIONS | 8 | 05/26/2022 |
| EDGE FUNDS MANAGEMENT | 6 | 09/24/2021 |
| WALKER MALLOY & CO | 5 | 09/06/2024 |
| ACHS MANAGMENT | 4 | 12/15/2021 |
| ARYEH REALTY CORP. | 4 | 08/14/2024 |
| BRICKMAN | 4 | 05/05/2021 |
| GFP REAL ESTATE LLC | 4 | 06/06/2023 |
| NORTHWELL HEALTH LENOX HILL HOSPITA | 4 | 05/23/2022 |
| A&R PROPERTIES GROUP | 3 | 06/23/2021 |
| COLLIERS | 3 | 06/13/2023 |
| MANHATTAN INTERIOR CONTRACTING CO., | 3 | 10/27/2022 |
| MARK D. LIPTON ASSOC., INC. | 3 | 05/11/2023 |
| 521 MAD | 2 | 04/19/2021 |
| ABINGTON PROPERTIES | 2 | 02/25/2021 |
| DK CONSTRUCTION ONE CORP | 2 | 11/19/2021 |
| FOREST HILLS PROPERTY GROUP LTD | 2 | 06/23/2021 |
| GREYSTONE MANAGEMENT | 2 | 04/01/2024 |
| William Gottlieb Management Co. LLC | 2 | 05/13/2021 |
| 251 WEST 39TH STREET REALTY CO. LLC | 1 | 04/04/2024 |
| Algin Management CO., LLC | 1 | 11/03/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| UPRIGHT EXPEDITERS, INC. | 2 | 06/05/2023 |
| 4444 PPPP CORP | 1 | 11/15/2021 |
| JOANNA KARAGIANNIS | 1 | 11/10/2021 |
| PASTELES CAPY LLC | 1 | 11/02/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| B08010642 ↗ | 39 GARFIELD PLACE BROOKLYN | Alteration | Permit Issued | 11/04/2022 | 09/02/2026 | Design GEDEON ENGINEERING, PC Contractor YAFE MEOD CORP | Structural work renovation to existing floor framing, new floor framing, loadbearing to exterior walls in conjunction with enlargement fi… |
| B08010802 ↗ | 39 GARFIELD PLACE BROOKLYN | Alteration | Permit Issued | 11/04/2022 | 09/02/2026 | Design GEDEON ENGINEERING, PC Contractor YAFE MEOD CORP | Foundation work consisting of helical pile due to the soil condition filed in support of Alteration Type 1 # B08010313-I1. |
| M01346030 ↗ | 680 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 01/22/2026 | 06/10/2026 | Contractor ADVANTAGECONTRACTING COR | General Construction and Mechanical related work in conjunction with interior white box renovation of an existing storage space at the cella… |
| M00840328 ↗ | 48 WALL STREET MANHATTAN | Alteration | Signed-off | 03/11/2024 | 05/14/2025 | Design JACK GREEN ASSOCIATES Owner CBRE INC. A/A/F Contractor BIG APPLE PLBG CORP | Sp work scope |
| M00839952 ↗ | 48 WALL STREET MANHATTAN | Alteration | Signed-off | 03/13/2024 | 05/13/2025 | Design JACK GREEN ASSOCIATES Owner CBRE INC. A/A/F Contractor BIG APPLE PLBG CORP | Sprinkler work in assoc with LL |
| M00840092 ↗ | 48 WALL STREET MANHATTAN | Alteration | Signed-off | 03/11/2024 | 05/13/2025 | Design JACK GREEN ASSOCIATES Owner CBRE INC. A/A/F Contractor BIG APPLE PLBG CORP | SP work related to LL26/04 |
| M00840365 ↗ | 48 WALL STREET MANHATTAN | Alteration | Signed-off | 03/11/2024 | 05/13/2025 | Design JACK GREEN ASSOCIATES Owner CBRE INC. A/A/F Contractor BIG APPLE PLBG CORP | Sprinkler work modification |
| M01030657 ↗ | 48 WALL STREET MANHATTAN | Alteration | Signed-off | 04/12/2024 | 05/13/2025 | Design JACK GREEN ASSOCIATES Owner CBRE INC. A/A/F Contractor BIG APPLE PLBG CORP | Sprinkler application in support of LL2204 |
| M01097005 ↗ | 176 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 09/06/2024 | 04/17/2025 | Design BRICK CITY RECONSTRUCTION Owner WALKER MALLOY & CO Contractor MASTER PLBG AND HTG INC | Sprinkler Modification taking place on the first floor as per plans he refiled. No change in use or egress file under this application |
| S00594395 ↗ | 475 SEAVIEW AVENUE STATEN ISLAND | Alteration | Signed-off | 11/15/2021 | 04/10/2025 | Design AKF ENGINEERS, LLP Owner NORTHWELL HEALTH (SIUH) Contractor NYC FIRE SPRINKLER CORP | sprinkler modification per plans filed herewith. |
| S00594224 ↗ | 475 SEAVIEW AVENUE STATEN ISLAND | Alteration | Signed-off | 11/09/2021 | 02/20/2025 | Owner NORTHWELL HEALTH (SIUH) Contractor CENTRAL CONSULTING & CONT | General construction per plans filed herewith, |
| S00594350 ↗ | 475 SEAVIEW AVENUE STATEN ISLAND | Alteration | Signed-off | 11/02/2021 | 02/20/2025 | Design AKF ENGINEERS, LLP Owner NORTHWELL HEALTH (SIUH) Contractor B.R. FRIES & ASSOCIATES L | Mechanical Modifications per plans filed herewith |
| M01096326 ↗ | 176 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 08/16/2024 | 10/07/2024 | Design ESNYC CONSULTING INC Owner WALKER MALLOY & CO Contractor ATLAS BUILDERS LLC | General Construction taking a place on the 1st floor, (Stores 1 and 2) built of the non-loading portions and finishes, as per plans here fil… |
| M01097014 ↗ | 176 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 09/06/2024 | 10/07/2024 | Design BRICK CITY RECONSTRUCTION Owner WALKER MALLOY & CO Contractor ATLAS BUILDERS LLC | mechanical systems modification |
| M01096997 ↗ | 176 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 09/06/2024 | 09/18/2024 | Design BRICK CITY RECONSTRUCTION Owner WALKER MALLOY & CO Contractor ARCON PLBG SOLUTIONS | Plumbing Modification and installation of new plumbing fixtures etc. |
| M01030796 ↗ | 1453 3 AVENUE MANHATTAN | Alteration | Signed-off | 04/24/2024 | 09/17/2024 | Design COLLECTIF ENGINEERING PLLC Owner ARYEH REALTY CORP. Contractor M.A.C. PLUMBING, INC | General Plumbing Work taking a place on the cellar and first floor as per plans here filed. No change in use or Egress file under this appli… |
| M01030784 ↗ | 1453 3 AVENUE MANHATTAN | Alteration | Permit Issued | 04/24/2024 | 09/04/2024 | Design COLLECTIF ENGINEERING PLLC Owner ARYEH REALTY CORP. Contractor LUMITECH CONTRACTING CORP | General Mechanical Work taking place on the 1st and cellar level as per plans here file. No change in use or egress file under this applicat… |
| M01064404 ↗ | 1453 3 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 08/14/2024 | — | Design ESNYC CONSULTING INC Owner ARYEH REALTY CORP. | — |
| Q00642020 ↗ | 95-25 QUEENS BOULEVARD QUEENS | Alteration | Permit Issued | 01/07/2022 | 08/12/2024 | Design BLADYKAS ENGINEERING, P.C. Contractor MACCARONE PLUMBING INC | PLUMBING MODIFICATIONS PER PLANS FILED HEREWITH |
| M01033448 ↗ | 176 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 04/22/2024 | 04/26/2024 | Design ESNYC CONSULTING INC Owner WALKER MALLOY & CO Contractor LUMITECH CONTRACTING CORP | General Construction taking a place on the 1st floor, (Stores 1 and 2) removal of the non loading portions and finishes, as per plans here f… |
| M00660268 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 03/29/2023 | 04/19/2024 | Design JACK GREEN ASSOCIATES Contractor TURNER CONSTRUCTION COMPANY | Mechanical Modifications to the Cellar (C-1) level area of refuge as per plans filed herewith. |
| M01019088 ↗ | 328 COLUMBUS AVENUE MANHATTAN | Alteration | Signed-off | 04/01/2024 | 04/08/2024 | Design COLLECTIF ENGINEERING PLLC Owner GREYSTONE MANAGEMENT Contractor M.A.C. PLUMBING, INC | Plumbing Modification as per plans. No change in use or egress |
| M01019094 ↗ | 328 COLUMBUS AVENUE MANHATTAN | Alteration | Signed-off | 03/28/2024 | 04/05/2024 | Design ESNYC CONSULTING INC Owner GREYSTONE MANAGEMENT Contractor LUMITECH CONTRACTING CORP | General Construction as per plans filed. No change in use or egress flied under this application. |
| M00660426 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 03/29/2023 | 04/01/2024 | Design JACK GREEN ASSOCIATES Contractor SIRINA FIRE PROT CORP | Sprinkler modifications as per plans filed. No change to use, egress, bulk, or occupancy proposed |
| M08024971 ↗ | 48 WALL STREET MANHATTAN | Alteration | Permit Issued | 03/11/2024 | 03/27/2024 | Design JACK GREEN ASSOCIATES Owner CBRE INC. A/A/F Contractor BIG APPLE PLBG CORP | Sprinkler work in connection with Ll2604 |
| M01017388 ↗ | 1453 3 AVENUE MANHATTAN | Alteration | Signed-off | 03/11/2024 | 03/20/2024 | Design ESNYC CONSULTING INC Owner ARYEH REALTY CORP. Contractor LUMITECH CONTRACTING CORP | General Construction 1st Floor and Cellar as Per drawings, no change in use or egress |
| M00839286 ↗ | 48 WALL STREET MANHATTAN | Alteration | Signed-off | 03/13/2024 | 03/18/2024 | Design JACK GREEN ASSOCIATES Owner CBRE INC. A/A/F Contractor BIG APPLE PLBG CORP | work related to LL26/04. File to correct 37022630M, 37020741X, 37015995J |
| M00839977 ↗ | 48 WALL STREET MANHATTAN | Alteration | Signed-off | 03/13/2024 | 03/18/2024 | Design JACK GREEN ASSOCIATES Owner CBRE INC. A/A/F Contractor BIG APPLE PLBG CORP | Sprinkler work in assoc with ll2204 |
| M00662085 ↗ | 474 WEST BROADWAY MANHATTAN | Alteration | Signed-off | 03/17/2022 | 02/16/2024 | Contractor LUMITECH CONTRACTING CORP | New replacement deck in 2nd Floor courtyard within existing apartment. No change of use egress or occupancy. |
| Q00269216 ↗ | 1659 CODY AVENUE QUEENS | Alteration | Signed-off | 08/06/2020 | 02/08/2024 | Design MIB CONSULTING Contractor ORBIT SPRINKLER CORP | SPRINKLER MODIFICATIONS AS PER PLANS FILED HEREWITH. |
| M00662371 ↗ | 474 WEST BROADWAY MANHATTAN | Alteration | Signed-off | 03/18/2022 | 02/06/2024 | Design JAMES H. FAHEY Contractor LUMITECH CONTRACTING CORP | New deck to replace existing as per plans filed herewith. No change in use, egress or occupancy. |
| S00640665 ↗ | 375 SEGUINE AVENUE STATEN ISLAND | Alteration | Signed-off | 03/08/2023 | 01/04/2024 | Design GILSANZ MURRAY STEFICEK LLP Owner NORTHWELL HEALTH (SIUH) Contractor JRB CONSTRUCTION CORP | New steel dunnage on roof for new HVAC, support of roof openings for HVAC, infill of 4 diameter and 12 square floor drain openings, Unistrut… |
| B00961958 ↗ | 9920 4 AVENUE BROOKLYN | Alteration | Signed-off | 11/27/2023 | 11/30/2023 | Design ESNYC CONSULTING INC Contractor JOHN FITZGERALD PLBG &HTG | Installation of two new sinks |
| M00930656 ↗ | 251 WEST 39 STREET MANHATTAN | Alteration | Signed-off | 10/25/2023 | 10/26/2023 | Design ESNYC CONSULTING INC Contractor BSM MAINTENANCE | SECOND FLOOR ALTERATION TYPE 2. WORK LIMITED TO THE TENANT AREA ONLY ONAPPROXIMATELY 5,000 GSF OF OFFICE SPACE. NO CHANGE OF USE, OCCUPANCY,… |
| Q00854944 ↗ | 95-25 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 06/05/2023 | 08/16/2023 | Design BLADYKAS ENGINEERING, P.C. Contractor VILLAGE P & H NY INC | Pl work at tenant buildup- Vivo Pharmacy per plans. No other change |
| Q00863601 ↗ | 95-25 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 06/19/2023 | 08/16/2023 | Design BLADYKAS ENGINEERING, P.C. Contractor A. PILATO PLUMBING LLC | Plumbing work per plans on 2nd floor fluoroscopy . No other change |
| Q00863592 ↗ | 95-25 QUEENS BOULEVARD QUEENS | Alteration | Permit Issued | 07/07/2023 | 08/10/2023 | Design THE MCGUIRE GROUP ARCHITECTS Contractor PAUL M MAINTENANCE INC | The work involves decommissioning two existing exam rooms for fluoroscopy exam room. no other change |
| Q00863606 ↗ | 95-25 QUEENS BOULEVARD QUEENS | Alteration | Permit Issued | 06/19/2023 | 08/10/2023 | Design BLADYKAS ENGINEERING, P.C. Contractor PAUL M MAINTENANCE INC | Renovation 2nd floor, Fluoroscopy . |
| Q00855249 ↗ | 95-25 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 06/05/2023 | 07/10/2023 | Design BLADYKAS ENGINEERING, P.C. Contractor VILLAGE P & H NY INC | Sprinkler work in relation with tenant buildout at Vivo Health Pharmacy |
| Q00854867 ↗ | 95-25 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 05/31/2023 | 07/07/2023 | Design EFH ARCHITECTURE Contractor ADI CONTRACTING LLC | General construction associated with Tenant buildout - VIVO No other change |
| Q00855197 ↗ | 95-25 QUEENS BOULEVARD QUEENS | Alteration | Permit Issued | 06/05/2023 | 07/07/2023 | Design BLADYKAS ENGINEERING, P.C. Contractor ADI CONTRACTING LLC | DEMOLISH AIR DEVICES AND ASSOCIATED DUCTWORK AS INDICATED, PROVIDE TWO (2) NEW SPLIT SYSTEMS WITH OUTSIDE AIR INTAKE GOOSENECK AND DUCTWORK.… |
| Q00642028 ↗ | 95-25 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 01/05/2022 | 06/02/2023 | Design REUTHER BOWEN Contractor THE WHITING-TURNER CONTRA | STRUCTUAL MODIFICATIONS AS PER PLANS FILED HEREWITH. |
| Q00642026 ↗ | 95-25 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 01/05/2022 | 06/01/2023 | Design REUTHER BOWEN Contractor THE WHITING-TURNER CONTRA | STRUCTUAL MODIFICATIONS AS PER PLANS FILED HEREWITH. |
| Q00855293 ↗ | 95-25 QUEENS BOULEVARD QUEENS | Alteration | Filed — no permit on record | 05/31/2023 | — | Design REUTHER BOWEN | — |
| Q00641996 ↗ | 95-25 QUEENS BOULEVARD QUEENS | Alteration | Permit Issued | 01/07/2022 | 05/25/2023 | Design BLADYKAS ENGINEERING, P.C. Owner CUSHMAN & WAKEFIELD Contractor PREMIER MECHANICAL SERVIC | MECHNICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. |
| Q00641988 ↗ | 95-25 QUEENS BOULEVARD QUEENS | Alteration | Permit Issued | 01/04/2022 | 05/15/2023 | Design EFH ARCHITECTURE Owner CUSHMAN & WAKEFIELD Contractor THE WHITING-TURNER CONTRA | GENERAL CONSTRUCTION PER PLANS FILED HEREWITH. |
| M00598859 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 02/11/2022 | 04/24/2023 | Design MUSE ARCHITECTS PLLC Contractor TURNER CONSTRUCTION COMPANY | Selective demolition and construction of partitions and partial floor slabs for installation of new elevator on floors C2, C1, 01 and Mezzan… |
| M00856212 ↗ | 38 EAST 32 STREET MANHATTAN | Alteration | Signed-off | 04/17/2023 | 04/20/2023 | Design BLADYKAS ENGINEERING, P.C. Owner COLLIERS Contractor M & J MECHANICAL CORP | New electric baseboard, new exhaust fan, control wiring, and accessories. Relocation of Ductwork and air devices on existing HVAC system. |
| M00856218 ↗ | 38 EAST 32 STREET MANHATTAN | Alteration | Signed-off | 04/18/2023 | 04/20/2023 | Design BLADYKAS ENGINEERING, P.C. Owner COLLIERS Contractor A & M WARSHAW PLBG & HTG | Removal of 2 exam room sinks and associated piping, Install 3 sinks and One Eyewash in Soiled Holding Room and Exam room. Existing Water sup… |
| M00793843 ↗ | 1402 BROADWAY MANHATTAN | Alteration | Signed-off | 08/24/2022 | 04/18/2023 | Design STEVEN PAUL HAMMER Contractor PRIME MECHANICAL CONTRACT | MODIFICATION TO EXISTING HVAC SYSTEM ON THE 7th FL AS PER PLANS FILED HEREWITH. (Northwell) NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS… |
| M00660389 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 03/29/2023 | 04/03/2023 | Design JACK GREEN ASSOCIATES Contractor PACE PLUMBING CORP | Removal of plumbing fixture and associated piping per plans |
| Q00642010 ↗ | 95-25 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 01/05/2022 | 03/21/2023 | Design BLADYKAS ENGINEERING, P.C. Owner CUSHMAN & WAKEFIELD Contractor SIRINA FIRE PROT CORP | sprinkler modifications as per plans filed herewith. |
| M00845248 ↗ | 256 WEST 36 STREET MANHATTAN | Alteration | Signed-off | 03/17/2023 | 03/20/2023 | Design ESNYC CONSULTING INC Owner WINDSOR MANAGEMENT CORP. Contractor PREFERRED MECHANICAL INC | CONSTRUCTION OF NEW SHOWER. NO CHANGE TO USE, EGRESS, BULK OREGRESS AND OCCUPANCY |
| Q00642015 ↗ | 95-25 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 01/05/2022 | 03/20/2023 | Design BLADYKAS ENGINEERING, P.C. Owner CUSHMAN & WAKEFIELD Contractor SIRINA FIRE PROT CORP | sprinkler modifications as per plans filed herewith. |
| Q00651823 ↗ | 95-25 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 01/05/2022 | 03/20/2023 | Design BLADYKAS ENGINEERING, P.C. Owner CUSHMAN & WAKEFIELD Contractor SIRINA FIRE PROT CORP | SPRINKLER MODIFICATIONS TO THE 6TH FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00678723 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 03/10/2022 | 03/13/2023 | Design JACK GREEN ASSOCIATES Contractor AVON PLBG & HTG INC | Sprinkler modification as per plans filed herewith. No change to use, egress, or occupancy proposed under this application |
| M07993217 ↗ | 870 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 02/02/2023 | 03/07/2023 | Design JACK GREEN ASSOCIATES Contractor ATLANTIDA HVAC | Installation of new AC system and associate pipe on the roof and 3rd floor |
| M08020819 ↗ | 870 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 02/02/2023 | 03/07/2023 | Design JACK GREEN ASSOCIATES Contractor MT ENERGY INC | pl work associated w tenant build out |
| M08027679 ↗ | 630 PARK AVENUE MANHATTAN | Alteration | Signed-off | 11/04/2022 | 03/07/2023 | Design DEAN WORKS ARCHITECTURE PLLC Contractor MARTINEZ CONSTRUCTION MAN | Minor General Construction modification as per plans filed herewith. No change to use, egress or occupancy is proposed. |
| M00824536 ↗ | 452 5 AVENUE MANHATTAN | Alteration | Signed-off | 02/27/2023 | 03/06/2023 | Design ST ENGINEERING SERVICES LLP Contractor BEDROCK PLBG. & HTG., INC | REMOVE EXISTING ELECTRIC WATER HEATERS INCLUDING DEDICATEDACCESSORIES AND PLUMBING PIPING CONNECTIONS. ON THE 26th FLOOR AS PER PLANS FILED… |
| M00822006 ↗ | 452 5 AVENUE MANHATTAN | Alteration | Signed-off | 02/27/2023 | 03/02/2023 | Design DPM ARCHITECTURE, P.C. Contractor VANGUARD CONSTRUCTION AND | non structural demo and construction at 26th floor tenant build up. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| M00825074 ↗ | 452 5 AVENUE MANHATTAN | Alteration | Signed-off | 02/27/2023 | 03/02/2023 | Design ST ENGINEERING SERVICES LLP Contractor BEDROCK MECHANICAL INC | Demolish sprinkler on the floor and provide temporary loop NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| S00646560 ↗ | 375 SEGUINE AVENUE STATEN ISLAND | Alteration | Signed-off | 12/23/2022 | 02/24/2023 | Design AKF ENGINEERS, LLP Owner NORTHWELL HEALTH (SIUH) Contractor SCARAN OIL SERVICE INC | Mechanical modifications as per plans filed herewith. No change in use, egress or occupancy. |
| B00728515 ↗ | 496 FULTON STREET BROOKLYN | Alteration | Signed-off | 05/25/2022 | 02/14/2023 | Design BLACKNEY HAYES ARCHITECTS Owner CROWN ACQUISITIONS Contractor LORICH CONSTRUCTION MANAGEMENT | General Construction Taking place at the cellar level. No change in use or occupancy filed under this application |
| M00820579 ↗ | 1538 BROADWAY MANHATTAN | Alteration | Signed-off | 02/02/2023 | 02/10/2023 | Owner GFP Real Estate LLC Contractor BSM MAINTENANCE | CONSTRUCTION MODIFICATIONS ON THE 35TH FLOOR AS PERPLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY |
| M00820641 ↗ | 1538 BROADWAY MANHATTAN | Alteration | Signed-off | 02/02/2023 | 02/03/2023 | Design JACK GREEN ASSOCIATES Owner GFP Real Estate LLC Contractor BSM MAINTENANCE | MECHANICAL WORK AT 35TH FLOOR AS PER PLANS FILED HEREWITH. INSTALLATION OF VAV BOXES, FAN POWER BOXES AND ASSOCIATED DUCT WORK AND PIPING. I… |
| M00820661 ↗ | 1538 BROADWAY MANHATTAN | Alteration | Signed-off | 02/02/2023 | 02/03/2023 | Design JACK GREEN ASSOCIATES Owner GFP Real Estate LLC Contractor BIG APPLE PLBG CORP | PL WORK ON THE 35TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00820694 ↗ | 1538 BROADWAY MANHATTAN | Alteration | Signed-off | 02/02/2023 | 02/03/2023 | Design JACK GREEN ASSOCIATES Owner GFP Real Estate LLC Contractor BIG APPLE PLBG CORP | SPRINKLER WORK ON THE 35TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q00652004 ↗ | 95-25 QUEENS BOULEVARD QUEENS | Alteration CO | Permit Issued | 02/15/2022 | 01/27/2023 | Design EFH ARCHITECTURE Contractor THE WHITING-TURNER CONTRA | Modification of the exiting Egress as per plans filed |
| M08002459 ↗ | 605 EAST 82 STREET MANHATTAN | Alteration | Signed-off | 09/22/2022 | 01/11/2023 | Design JACK GREEN ASSOCIATES Contractor GENESIS DESIGN CONSTRUC | GENERAL MECHANICAL MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANG TO USE, BULK, EGRESS, OR OCCUPANCY IS PROPOSED |
| M08021225 ↗ | 229 WEST 60 STREET MANHATTAN | Alteration | Permit Issued | 11/03/2022 | 01/10/2023 | Design JACK GREEN ASSOCIATES Owner ALGIN MANAGEMENT CO LLC Contractor LONG ISLAND MECHANICAL IN | mechanical work in association with boiler |
| M00661367 ↗ | 2 9 AVENUE MANHATTAN | Alteration | Signed-off | 02/17/2022 | 12/16/2022 | Contractor FIVE STARS AWNINGS & SIGN | Canopy/awning design to be installed at the restaurant storefront. no change in use, egress or occupancy. |
| S00646632 ↗ | 375 SEGUINE AVENUE STATEN ISLAND | Alteration | Signed-off | 12/06/2022 | 12/13/2022 | Design AKF ENGINEERS, LLP Owner NORTHWELL HEALTH (SIUH) Contractor CAPITAL CONTR P&H CORP | Plumbing modifications as per plans filed herewith. No change in use, egress or occupancy. |
| Q00651817 ↗ | 95-25 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 01/07/2022 | 12/01/2022 | Design BLADYKAS ENGINEERING, P.C. Contractor MACCARONE PLUMBING INC | INFUSION. PLUMBING MODIFICATIONS TO THE 6TH AND 5TH FLOORS AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| S00723495 ↗ | 1855 RICHMOND AVENUE STATEN ISLAND | Alteration | Signed-off | 05/11/2022 | 12/01/2022 | Design STEVEN PAUL HAMMER Contractor MVS HEATING & AIR CONDIT | GENERAL MECHANICAL MODIFICATIONS TAKING PLACE ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| S00734003 ↗ | 378 SEAVIEW AVENUE STATEN ISLAND | Alteration | Permit Issued | 05/19/2022 | 11/28/2022 | Design GOLDMAN COPELAND ASSOCIATES Owner NORTHWELL HEALTH Contractor SCARAN OIL SERVICE INC | General Mechanical modification, Taking place on the first floor as plans filed herewith. No change in use or Occupancy. |
| M00376171 ↗ | 48 WALL STREET MANHATTAN | Alteration | Signed-off | 08/24/2020 | 11/21/2022 | Design WSP Contractor MORA FIRE PROTECTION LLC | SPRINKLER MODIFICATIONS TO THE (CELLAR #1-MARKETING /BAS A-CONSTRUCTION) AND (MEZZANINE - MARKETING /1ST & 2ND FLOOR-CONSTRUCTION) IN CONJUN… |
| M00498974 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 04/19/2021 | 11/21/2022 | Design AKF ENGINEERS, LLP Contractor SIRINA FIRE PROT CORP | Sprinkler modifications to the cellar and 1st floor as per plans filed herewith. |
| B08010821 ↗ | 39 GARFIELD PLACE BROOKLYN | Alteration | Filed — no permit on record | 11/04/2022 | — | Design SRW ENGINEERS | — |
| Q00247122 ↗ | 51-36 35TH STREET QUEENS | Alteration | Signed-off | 10/23/2019 | 10/28/2022 | Design KERI ENGINEERING, P.C. Contractor ORBIT PLBG & HTG INC | PLUMBING AND SPRINKLER MODIFICATIONS ASSOCIATED WITH TENANT FIT OUT OF LAB SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M08011154 ↗ | 855 PARK AVENUE MANHATTAN | Alteration | Signed-off | 10/04/2022 | 10/26/2022 | Design PAMELA A. SMITH Owner NORTHWELL HEALTH Contractor CENTRAL CONSULTING & CONT | General construction work associated with LINAC Replacement. No change in use egress or occupancy MH, ST an PL SP work associated with the L… |
| M08002473 ↗ | 605 EAST 82 STREET MANHATTAN | Alteration | Signed-off | 09/26/2022 | 10/24/2022 | Design JACK GREEN ASSOCIATES Contractor INTERCITY PLBG & HTG CORP | GENERAL PLUMBING MODIFICATIONS ARE PER PLANS FILED HEREWITH. NO CHANGE TO USE, BULK, EGRESS, OR OCCUPANCY IS PROPOSED. |
| B00728987 ↗ | 25 ELM PLACE BROOKLYN | Alteration | Signed-off | 05/25/2022 | 10/21/2022 | Owner CROWN ACQUISITIONS Contractor LORICH CONSTRUCTION MANAGEMENT | General Structural Work taking place at the cellar level. No change in use or egress filed under this application. |
| M08011716 ↗ | 855 PARK AVENUE MANHATTAN | Alteration | Signed-off | 10/13/2022 | 10/20/2022 | Design LIZARDOS ENGINEERING Owner NORTHWELL HEALTH Contractor CAPITAL CONTR P & H CORP | Relocate 4 sprinkler heads within therapy vault. No change in use or egress |
| M08011747 ↗ | 855 PARK AVENUE MANHATTAN | Alteration | Signed-off | 10/13/2022 | 10/20/2022 | Design LIZARDOS ENGINEERING Owner NORTHWELL HEALTH Contractor CAPITAL CONTR P&H CORP | Pluming work associated with Linear Accelerator Equipment Replacement No change in use or egress. |
| M00498336 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 04/13/2021 | 10/18/2022 | Design MUSE ARCHITECTS PLLC Contractor TURNER CONSTRUCTION COMPANY | ARCHITECTURAL MODIFICATION TO THE SUB-CELLAR, CELAR, 1ST AND 7TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGES OF USE, EGRESS OR OCCUPANCY. |
| M00498346 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 04/13/2021 | 10/14/2022 | Contractor TURNER CONSTRUCTION COMPANY | STRUCTURAL MODIFICATIONS TO THE SUB CELLAR 1, CELLAR, 1ST AND 7TH FLOOR AS PER PLANS FILED HEREWITH. |
| M00498813 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 04/19/2021 | 10/14/2022 | Design AKF ENGINEERS, LLP Contractor TURNER CONSTRUCTION COMPANY | MECHANICAL MODIFICATIONS TO THE SUB CELLAR 2, SUB CELLAR 1, CELLAR, 1ST - 7TH AND 7TH FLOOR PENTHOUSE AS PER PLANS FILED HEREWITH. |
| Q00651800 ↗ | 95-25 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 12/23/2021 | 09/20/2022 | Design EFH ARCHITECTURE Owner CUSHMAN & WAKEFIELD Contractor THE WHITING-TURNER CONTRA | GENERAL CONSTRUCTION MODIFICATION TAKING PLACE ON THE 5TH AND 6th FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00712866 ↗ | 1050 WEST 39 STREET MANHATTAN | Alteration | Signed-off | 05/24/2022 | 09/16/2022 | Design KABBANI HANRAHAN ASSOCIATES Contractor M GROUP MANAGEMENT CORP | FILING FOR FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00793853 ↗ | 1402 BROADWAY MANHATTAN | Alteration | Signed-off | 08/24/2022 | 08/31/2022 | Design STEVEN PAUL HAMMER Contractor BEDROCK PLBG. & HTG., INC | PLUMBING MODIFICATIONS TAKING PLACE ON THE 7TH FLOOR (Northwell) AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00793838 ↗ | 1402 BROADWAY MANHATTAN | Alteration | Signed-off | 08/25/2022 | 08/30/2022 | Design NADASKAY KOPELSON ARCHITECTS Contractor THE WHITING-TURNER CONTRA | APPLICATION FILED FOR INTERIOR RENOVATION OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 7TH FLOOR. (Northwell) AS PER PLANS … |
| M00793846 ↗ | 1402 BROADWAY MANHATTAN | Alteration | Signed-off | 08/24/2022 | 08/30/2022 | Design STEVEN PAUL HAMMER Contractor CMA PLUMBING & HEATING IN | MODIFICATION TO EXISTING SPRINKLER SYSTEM TAKING PLACE ON THE 7TH FLOOR (Northwell) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR… |
| Q00642021 ↗ | 95-25 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 01/07/2022 | 08/24/2022 | Design BLADYKAS ENGINEERING, P.C. Owner CUSHMAN & WAKEFIELD Contractor MACCARONE PLUMBING INC | PLUMBING MODIFICATIONS PER PLANS FILED HEREWITH |
| M00750851 ↗ | 316 WEST 39 STREET MANHATTAN | Alteration | Signed-off | 06/22/2022 | 08/18/2022 | Design JACK GREEN ASSOCIATES Contractor MKSSKR CONSULTING SERVICE | Mechanical exhaust as per plans filed herewith. No change to use, egress or occupancy is proposed. |
| S00723548 ↗ | 1855 RICHMOND AVENUE STATEN ISLAND | Alteration | Signed-off | 04/29/2022 | 07/28/2022 | Design STEVEN PAUL HAMMER Contractor JOHN FITZGERALD PLBG &HTG | GENERAL PLUMBING MODIFICATIONS TAKING PLACE ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| M00668391 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 07/08/2022 | 07/27/2022 | Design JACK GREEN ASSOCIATES Contractor SIRINA FIRE PROT CORP | Sprinkler modifications in the cellar (C1) and Ground Floor as per plans filed herewith. |
| M00667675 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 07/07/2022 | 07/21/2022 | Contractor TURNER CONSTRUCTION COMPANY | Minor Interior structural modifications as per plans filed herewith. No change in use, egress, and occupancy. |
| S00723463 ↗ | 1855 RICHMOND AVENUE STATEN ISLAND | Alteration | Signed-off | 04/26/2022 | 07/18/2022 | Design THE MCGUIRE GROUP ARCHITECTS Contractor MAMAIS CONTRACTING CORP | GENERAL CONSTRUCTION ON THE 1STTH FLOOR RECONFIGURE INTERIOR PARTIRIONS, MINOR WORK AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OC… |
| M00667803 ↗ | 1251 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 07/08/2022 | 07/15/2022 | Design JACK GREEN ASSOCIATES Contractor TRISTATE PLBG SVCS CORP | Installation of new gas piping only, Gas Meter and Appliances filed under a separated application M00822081-PL Installation of sanitary vent… |