Elevator cooperative
20 EAST 84 STREET
MANHATTAN · Upper East Side-Carnegie Hill · BIN 1046792
💬 Discuss this project
1900Year Built
6Stories
D4Building Class
C5-1Zoning
23,948 sfGross Floor Area
25Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Elevator cooperative · Owner of record: 18 20 PARK 84TH CORP · 5,824 sf lot · 4.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingLandscapeGeneralOther
Roof39p · 3 filings · 20 docs
Floor 620p · 3 filings · 20 docs
Floor 58p · 1 filing · 4 docs
Floor 410p · 2 filings · 11 docs
Floor 38p · 1 filing · 4 docs
Floor 215p · 3 filings · 20 docs
Floor 138p · 2 filings · 20 docs
Cellar16p · 3 filings · 19 docs
Filed — no permit issued4p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NMC PROPERTY MANAGEMENT1207/08/2026
18-20 PARK 84 CORP403/22/2026
STAR-CEL WATERPROOFING303/22/2026
18 20 PARK 84TH CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BOYD CONSULTING603/21/2026
DOMANI CONSULTING103/21/2026
AGOUTI CONSTRUCTION CONSULTING303/21/2026
A1 EXPEDITING SERVICE203/21/2026
HIERARCH-E603/21/2026
PSE CONSULTING403/21/2026
NEW YORK ENGINEERING ASSOCIATES P203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HIGHLINE CONSTRUCTION GRGeneral Contractor407/08/2026
RAINIER RESTORATION LLCGeneral Contractor303/21/2026
CM AND ASSOCIATES CONSTGeneral Contractor303/21/2026
STAR-CEL WATERPROOFINGGeneral Contractor304/09/2026
METROTECH MECHANICAL CORPPlumbing207/08/2026
ZEREGA CONTRACTING CORPPlumbing106/28/2026
VRF SOLUTIONS LLCGeneral Contractor107/08/2026
ROCKLEDGE SCAFFOLD CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE843109/25/2025
METROSPEC SIA6420207/29/2025
JOEL PHAGOO ,PE, PLLC2416105/29/2025
FMO ENGINEERING PC1798411/08/2024
GEORGE J. XERAKIAS, PE1658104/11/2024
H. A. BADER CONSULTANTS2332210/31/2022
NEW YORK ENGINEERING ASSO851106/03/2020
Building Lifecycle
All (108)Filed (16)Permit Issued (16)Signed Off (8)Violation (31)Inspection (3)Objection (4)Special Inspection (30)
05/27/2026
Signed off — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01184623-I1
03/12/2026
Signed off — Alteration
Application filed herewith to fill (3) three existing lot line windows and (2) two existing chimneys not in use. No change in use, egress or occupancy.
M01286359-I1
11/17/2025
Signed off — Alteration
suspended Scaffold installation as per plans filed herewith.
M01032120-S3
10/24/2025
Permit issued — General Construction
M01286359-I1-GC
10/02/2025
Permit issued — Plumbing
M01241101-I1-PL
09/25/2025
Filed — Alteration
Application filed herewith to fill (3) three existing lot line windows and (2) two existing chimneys not in use. No change in use, egress or occupancy.
M01286359-I1
09/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
JOHN MCMONAGLE
09/12/2025
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
09/12/2025
Special inspection requirement — Final
JOHN MCMONAGLE
08/26/2025
Objection resolved — Addressed
08/11/2025
Objection raised — Cost
07/29/2025
Filed — Alteration
Installation of new domestic hot water generation system as shown on plans.
M01241101-I1
07/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH YOUNG
07/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
JOSEPH YOUNG
07/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH YOUNG
07/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH YOUNG
07/28/2025
Special inspection requirement — Post-installed Anchors
JOSEPH YOUNG
07/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
JOSEPH YOUNG
07/28/2025
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH YOUNG
07/28/2025
Special inspection requirement — Permanent certificate
JOSEPH YOUNG
07/25/2025
Signed off — Alteration
New masonry opening in rear yard facade to accommodate new window. No change in use, egress, or occupancy. Filing PAA to clarify structural details per existing field conditions.
M01137401-I1
06/03/2025
Permit issued — Supported Scaffold
M01184623-I1-SF
05/29/2025
Filed — Alteration
TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01184623-I1
05/29/2025
Special inspection requirement — Post-installed Anchors
JOEL PHAGOO
05/20/2025
Permit issued — Mechanical Systems
M01170470-I1-MS
05/14/2025
Permit issued — Structural
M01032120-I1-GC
04/29/2025
Filed — Alteration
suspended Scaffold installation as per plans filed herewith.
M01032120-S3
04/29/2025
Permit issued — Suspended Scaffold
M01032120-S3-SC
04/01/2025
Filed — Alteration
M01170470-I1
03/31/2025
Signed off — Alteration
suspended Scaffold installation as per plans filed herewith.
M01032120-S1
03/13/2025
Permit issued — Structural
M01137401-I1-GC-CX
12/26/2024
Special inspection requirement — Structural Cold-Formed Steel
FRANCESCO MO
12/26/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FRANCESCO MO
12/26/2024
Special inspection requirement — Masonry
FRANCESCO MO
12/26/2024
Special inspection requirement — Post-installed Anchors
FRANCESCO MO
12/26/2024
Special inspection requirement — Structural Steel - Welding
FRANCESCO MO
12/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
Arthur Rabinovich
12/26/2024
Special inspection requirement — Final
Arthur Rabinovich
12/26/2024
Special inspection requirement — Structural Steel - Details
FRANCESCO MO
12/16/2024
Filed — Alteration
New masonry opening in rear yard facade to accommodate new window. No change in use, egress, or occupancy. Filing PAA to clarify structural details per existing field conditions.
M01137401-P1
12/15/2024
Special inspection requirement — Fire-Resistance Rated Construction
Arthur Rabinovich
12/15/2024
Special inspection requirement — Structural Steel - Welding
12/15/2024
Special inspection requirement — Structural Steel - Details
12/15/2024
Special inspection requirement — Masonry
12/15/2024
Special inspection requirement — Post-installed Anchors
12/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
12/15/2024
Special inspection requirement — Structural Cold-Formed Steel
12/15/2024
Special inspection requirement — Final
Arthur Rabinovich
11/08/2024
Filed — Alteration
New masonry opening in rear yard facade to accommodate new window. No change in use, egress, or occupancy. Filing PAA to clarify structural details per existing field conditions.
M01137401-I1
10/21/2024
Signed off — Alteration
Renovation of apartment #6B at the sixth floor. Work include non-structural demolition, general construction, mechanical and plumbing as per plans file herewith. No change to use, egress or occupancy.
M00689107-I1
10/18/2024
Signed off — Alteration
Renovation of apartment #6B at the sixth floor. Work include non-structural demolition, general construction, mechanical and plumbing as per plans file herewith. No change to use, egress or occupancy.
M00689107-S1
10/18/2024
Signed off — Alteration
Renovation of apartment #6B at the sixth floor. Work include non-structural demolition, general construction, mechanical and plumbing as per plans file herewith. No change to use, egress or occupancy.
M00689107-S2
10/15/2024
Special inspection requirement — Structural Wood Frame
FRANCESCO MO
10/15/2024
Special inspection requirement — Structural Steel - High Strength Bolting
FRANCESCO MO
10/01/2024
Objection resolved — Addressed
09/24/2024
Objection raised — Accessibility
09/20/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/10/2024
Filed — Alteration
suspended Scaffold installation as per plans filed herewith.
M01032120-P1
09/04/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/29/2024
Permit issued — Sidewalk Shed
M01032120-S1-SH
Latest 60 of 108 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCHRISTOPHER B. MESBAH10/24/2025
DOB NOWPlumbingPermit IssuedZEREGA CONTRACTING CORP10/02/2025
DOB NOWSupported ScaffoldSigned-offROCKLEDGE SCAFFOLD CORP06/03/2025
DOB NOWMechanical SystemsPermit IssuedVRF SOLUTIONS LLC05/20/2025
DOB NOWStructuralPermit IssuedSTAR-CEL WATERPROOFING05/14/2025
DOB NOWSuspended ScaffoldSigned-offSTAR-CEL WATERPR&RESTR CO04/29/2025
DOB NOWStructuralSigned-offRAINIER RESTORATION LLC03/13/2025
DOB NOWSidewalk ShedSigned-offSTAR-CEL WATERPROOFING08/29/2024
DOB NOWSuspended ScaffoldPermit IssuedSTAR-CEL WATERPR&RESTR CO08/27/2024
DOB NOWPlumbingSigned-offMETROTECH MECHANICAL CORP06/28/2024
DOB NOWGeneral ConstructionSigned-offHIGHLINE CONSTRUCTION GR01/30/2024
DOB NOWMechanical SystemsSigned-offHIGHLINE CONSTRUCTION GR01/30/2024
DOB NOWPlumbingSigned-offMETROTECH MECHANICAL CORP03/01/2023
DOB NOWGeneral ConstructionSigned-offHIGHLINE CONSTRUCTION GR01/12/2023
DOB NOWMechanical SystemsSigned-offHIGHLINE CONSTRUCTION GR01/12/2023
DOB NOWBoiler EquipmentPermit IssuedC C CONTROLLED COMBUSTION06/04/2020
1 project · most recent 07/29/2025
Water/Sanitary
FiledStatusContractorScope
07/29/2025Permit IssuedZEREGA CONTRACTING CORPWater/Sanitary
4 projects · most recent 06/09/2025
General Wiring
FiledStatusContractorScope
06/09/2025CompleteETECH ELECTRICAL LLCGeneral Wiring
12/16/2024CompletePRUDENT ELECTRIC INCGeneral Wiring
11/06/2024Permit IssuedGOODALL ELECTRIC CORPGeneral Wiring
09/17/2022CompleteJAM ELECTRICAL CORP—
2 projects · most recent 04/29/2025
Masonry Steel Wood
FiledStatusContractorScope
04/29/2025Permit IssuedSTAR-CEL WATERPROOFINGSteel, Masonry
04/04/2024——Masonry, Wood
1 project · most recent 05/29/2025
Scaffold
FiledStatusContractorScope
05/29/2025Signed-offROCKLEDGE SCAFFOLD CORPScaffold
1 project · most recent 04/29/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
04/29/2025Permit IssuedSTAR-CEL WATERPROOFINGSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/20/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
09/15/2025Tenant Protection Plan ComplianceJOHN MCMONAGLEspecial
09/12/2025Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
09/12/2025FinalJOHN MCMONAGLEprogress
07/28/2025Fire-Resistant Penetrations and JointsJOSEPH YOUNGspecial
07/28/2025HVAC-R and service water heating system controlsJOSEPH YOUNGenergy_progress
07/28/2025HVAC-R and service water piping design and insulationJOSEPH YOUNGenergy_progress
07/28/2025HVAC-R and service water heating equipmentJOSEPH YOUNGenergy_progress
07/28/2025Post-installed AnchorsJOSEPH YOUNGspecial
07/28/2025Tenant Protection Plan ComplianceJOSEPH YOUNGspecial
07/28/2025Energy Code Compliance InspectionsJOSEPH YOUNGprogress
07/28/2025Permanent certificateJOSEPH YOUNGenergy_progress
05/29/2025Post-installed AnchorsJOEL PHAGOOspecial
12/26/2024Structural Cold-Formed SteelFRANCESCO MOspecial
12/26/2024Structural Stability – Alterations of existing buildingsFRANCESCO MOspecial
12/26/2024MasonryFRANCESCO MOspecial
12/26/2024Post-installed AnchorsFRANCESCO MOspecial
12/26/2024Structural Steel - WeldingFRANCESCO MOspecial
12/26/2024Fire-Resistance Rated ConstructionArthur Rabinovichprogress
12/26/2024FinalArthur Rabinovichprogress
12/26/2024Structural Steel - DetailsFRANCESCO MOspecial
12/15/2024Fire-Resistance Rated ConstructionArthur Rabinovichprogress
12/15/2024Structural Steel - Welding—special
12/15/2024Structural Steel - Details—special
12/15/2024Masonry—special
12/15/2024Post-installed Anchors—special
Latest 25 of 51.
▾Documents — 78 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch15
09/01/2026M00689107-I1Request digital key ↗
09/01/2026M00689107-S2Request digital key ↗
09/01/2026M00689107-S1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/04/2026M00297637-I1Request digital key ↗
▸Applications & Permits11
▸DOB NOWLPC Approval/Permit11
08/25/2026M01137401-I1Open ↗
08/13/2026M00689107-S2Open ↗
08/13/2026M00689107-S1Open ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications34
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/25/2026M01137401-I1Open ↗
08/24/2026M01170470-I1Open ↗
08/22/2026M01241101-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/02/2026M01241101-I1Open ↗
09/02/2026M01241101-I1Open ↗
08/27/2026M01032120-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026M01241101-I1Open ↗
08/28/2026M01184623-I1Open ↗
08/27/2026M01032120-I1Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026M00297637-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/25/2026M01137401-I1Open ↗
08/24/2026M01170470-I1Open ↗
08/22/2026M01241101-I1Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWDEP Variance (V5) letter1
08/13/2026M01032120-I1Open ↗
▸Other Documents7
▸DOB NOWProof of Historic Building3
08/25/2026M01137401-I1Open ↗
08/13/2026M00689107-I1Open ↗
08/13/2026M01137401-P1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01032120-S2Open ↗
08/13/2026M01032120-S3Open ↗
▸DOB NOWCalculations2
08/13/2026M01032120-S3Open ↗
08/13/2026M01032120-S2Open ↗