← Back
Large suburban residence
20 MARKWOOD PLACE
QUEENS · BIN 4079151
💬 Discuss this project
1920Year Built
2.5Stories
A3Building Class
R3-2Zoning
3,792 sfGross Floor Area
1Units
Large suburban residence · 8,420 sf lot · 0.45 FAR built · Flood zone X
Locations of Work
PlumbingOther
Cellar2p · 1 filing · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/05/2018$2.4M—— → —$643/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ELLEN ROCHE302/03/2023
G. PEROTTO ASSOCIATES204/23/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EDWARD F ZEVALLOS ARCHITECT603/21/2026
G PEROTTO ASSOCIATES403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ASPIRO RENOVATIONS LLCGeneral Contractor207/08/2026
CEGF & G PLUMBING CORPPlumbing207/08/2026
GLEN OAKS ELEC'L INC.Electrical103/22/2026
TRIANGLE ELECTRIC INC.Electrical103/22/2026
HOCHSEL INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EDWARD F ZEVALLOS ARCHITE1025502/03/2023
VINCENT J. LIOTTA P. E.1974108/19/2019
Building Lifecycle
All (40)Filed (5)Permit Issued (5)Signed Off (3)Inspection (4)Objection (2)Special Inspection (21)
09/18/2023
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q08022953-I1
09/18/2023
Signed off — Alteration
Interior renovation of cellar. Install interior partitions, doors and finishes. Replace existing stair. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q08022948-I1
04/17/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/14/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/23/2023
Permit issued — General Construction
Q08022948-I1-GC
02/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Edward Zevallos
02/03/2023
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q08022953-P1
01/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Edward Zevallos
01/25/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/11/2023
Permit issued — Plumbing
Q08022953-I1-PL
12/07/2022
Permit issued — General Construction
Q08022948-I1-GC
12/07/2022
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
12/01/2022
Permit issued — Plumbing
Q08022953-I1-PL
11/23/2022
Special inspection requirement — Insulation placement and R values
Edward Zevallos
11/23/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Edward Zevallos
11/18/2022
Objection raised — Scope
11/18/2022
Objection resolved — Addressed
11/08/2022
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q08022953-I1
11/08/2022
Filed — Alteration
Interior renovation of cellar. Install interior partitions, doors and finishes. Replace existing stair. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
Q08022948-I1
10/18/2022
Special inspection requirement — Lighting in dwelling units
Edward Zevallos
10/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Edward Zevallos
10/18/2022
Special inspection requirement — Final
ELLEN ROCHE
10/18/2022
Special inspection requirement — Interior lighting power
Edward Zevallos
10/18/2022
Special inspection requirement — Lighting controls
Edward Zevallos
06/21/2021
Signed off — Alteration
install three split system condensers in open space at east side of dwelling
Q00198478-I1
05/10/2021
Permit issued — Mechanical Systems
Q00198478-I1-MS
04/23/2021
Filed — Alteration
install three split system condensers in open space at east side of dwelling
Q00198478-P1
04/19/2021
Special inspection requirement — Smoke Control Systems Testing
04/19/2021
Special inspection requirement — Energy Code Compliance Inspections
Edward Zevallos
04/19/2021
Special inspection requirement — Final
Edward Zevallos
04/19/2021
Special inspection requirement — Permanent certificate
Edward Zevallos
04/19/2021
Special inspection requirement — HVAC and service water heating equipment
Edward Zevallos
04/19/2021
Special inspection requirement — HVAC insulation and sealing
Edward Zevallos
04/19/2021
Special inspection requirement — Duct leakage testing
Edward Zevallos
04/19/2021
Special inspection requirement — Shutoff dampers
Edward Zevallos
04/19/2021
Special inspection requirement — Maintenance information
Edward Zevallos
04/19/2021
Special inspection requirement — HVAC and service water heating system controls
Edward Zevallos
04/19/2021
Special inspection requirement — Electrical motors
Edward Zevallos
04/19/2021
Special inspection requirement — Mechanical Systems
Edward Zevallos
08/19/2019
Filed — Alteration
install three split system condensers in open space at east side of dwelling
Q00198478-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offASPIRO RENOVATIONS LLC02/23/2023
DOB NOWPlumbingSigned-offBELL CONST SERV INC01/11/2023
DOB NOWGeneral ConstructionSigned-offASPIRO RENOVATIONS LLC12/07/2022
DOB NOWPlumbingSigned-offBELL CONST SERV INC12/01/2022
DOB NOWMechanical SystemsSigned-offHOCHSEL INC05/10/2021
BISOTISSUEDLINDEN REMODELING CORP11/20/2019
BISPLISSUEDP.S.I. MECHANICAL06/27/2019
BISOTISSUEDLINDEN REMODELING CORP06/11/2019
4 projects · most recent 11/15/2023
General Wiring HVAC Wiring
FiledStatusContractorScope
11/15/2023Permit IssuedTRIANGLE ELECTRIC INC.1 meters
07/10/2023CompleteASTRO ELECL CONTNG INCGeneral Wiring
03/19/2021Permit IssuedGLEN OAKS ELEC'L INC.General Wiring, HVAC Wiring
01/16/2019CancelledGMJ ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/14/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/07/2022Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
02/05/2023Fire-Resistant Penetrations and JointsEdward Zevallosspecial
01/27/2023Fire-Resistant Penetrations and JointsEdward Zevallosspecial
11/23/2022Insulation placement and R valuesEdward Zevallosenergy_progress
11/23/2022Fenestration and door U-factor and product ratingsEdward Zevallosenergy_progress
10/18/2022Lighting in dwelling unitsEdward Zevallosenergy_progress
10/18/2022Fire-Resistant Penetrations and JointsEdward Zevallosspecial
10/18/2022FinalELLEN ROCHEprogress
10/18/2022Interior lighting powerEdward Zevallosenergy_progress
10/18/2022Lighting controlsEdward Zevallosenergy_progress
04/19/2021Smoke Control Systems Testing—special
04/19/2021Energy Code Compliance InspectionsEdward Zevallosprogress
04/19/2021FinalEdward Zevallosprogress
04/19/2021Permanent certificateEdward Zevallosenergy_progress
04/19/2021HVAC and service water heating equipment Edward Zevallosenergy_progress
04/19/2021HVAC insulation and sealing Edward Zevallosenergy_progress
04/19/2021Duct leakage testing Edward Zevallosenergy_progress
04/19/2021Shutoff dampersEdward Zevallosenergy_progress
04/19/2021Maintenance informationEdward Zevallosenergy_progress
04/19/2021HVAC and service water heating system controls Edward Zevallosenergy_progress
04/19/2021Electrical motorsEdward Zevallosenergy_progress
04/19/2021Mechanical SystemsEdward Zevallosspecial
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch3
08/25/2026Q08022953-I1Request digital key ↗
08/25/2026Q08022953-P1Request digital key ↗
08/15/2026Q08022948-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/27/2026Q00198478-I1Request digital key ↗
08/15/2026Q00198478-P1Request digital key ↗
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION3
03/23/2020421933439Open ↗
06/04/2019421933439Open ↗
05/20/2019421933439Open ↗
▸BISWORK PERMIT APPLICATION3
11/27/2019421933439Open ↗
07/20/2019421933439Open ↗
06/19/2019421933439Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026Q00198478-I1Open ↗
08/25/2026Q08022953-I1Open ↗
08/25/2026Q08022953-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026Q08022948-I1Open ↗
09/01/2026Q08022948-I1Open ↗
08/28/2026Q00198478-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q08022948-I1Open ↗
08/28/2026Q00198478-P1Open ↗
08/27/2026Q08022953-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
06/19/2019421933439Open ↗
06/19/2019421933439Open ↗
05/20/2019421933439Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
03/23/2020421933439Open ↗
05/20/2019421933439Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026Q00198478-I1Open ↗
08/25/2026Q08022953-I1Open ↗
08/25/2026Q08022953-P1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/20/2019421933439Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/19/2019421933439Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
05/19/2021421933439Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/30/2021421933439Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/30/2021421933439Open ↗
05/19/2021421933439Open ↗
05/19/2021421933439Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/30/2021421933439Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
05/19/2021421933439Open ↗
05/20/2019421933439Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
05/20/2019421933439Open ↗