← Back
Office with commercial, 7-19 stories
20 WEST 22 STREET
MANHATTAN · Midtown South-Flatiron-Union Square · BIN 1015540
💬 Discuss this project
1911Year Built
16Stories
O6Building Class
C6-4AZoning
169,887 sfGross Floor Area
88Units
LL97 Covered8 Open Violations ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: ELK REALTY LLC · 10,253 sf lot · 16.57 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 3 filings · 20 docs
Floor 17Under Construction1 filing · 8 docs
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12Under Construction3 filings · 12 docs
Floor 11
Floor 10
Floor 91p · 1 filing · 5 docs
Floor 8
Floor 71p · 1 filing · 3 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 21p · 1 filing · 10 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
184 ASSOCIATES LLC C O ABS P607/08/2026
ABS PARTNERS REAL ESTATE LLC8707/08/2026
184 ASSOCIATES LLC C/O ABS P603/22/2026
380 2ND303/22/2026
ELK REALTY1003/22/2026
ELK REALTY LLC ABS PARTNE503/22/2026
UNIVERSAL BUILDERS SUPPLY303/22/2026
ELK REALTY LLC IRVINE REA103/22/2026
MURRAY HILL PROPERTIES1203/22/2026
ELK RELATY CO.C/O ZOUZA H103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WALTER T GORMAN PE2203/21/2026
YAO W GUO ARCHITECT, PC403/21/2026
JANCO BUILDING CONSULTANTS, LLC.203/21/2026
LOUIS STRIAR203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SARK FLOORING LLCGeneral Contractor508/04/2026
LT FIRE PROTECTION CORPFire Protection407/30/2026
CASELLA CONSTRUCTION CORP.General Contractor403/21/2026
PHASE 3 INTERIORS LLCGeneral Contractor307/08/2026
PREMIER SANITATION LLCGeneral Contractor303/21/2026
PALONE BROTHERS AIRGeneral Contractor203/21/2026
JRR CONTRACTING INCGeneral Contractor203/21/2026
GRUSHINSKY PIPNG & HTG INFire Protection207/08/2026
SCHNEIDER, ALLANElectrical203/21/2026
KAN ELEVATOR INCElectrical203/21/2026
G. C. PLBG & HTG INCPlumbing207/30/2026
GRECO, STEVEElectrical203/21/2026
ABE HIMELFARBElectrical103/21/2026
CITY SIGNSScaffold107/08/2026
ALPHONSE, MICHAELElectrical103/21/2026
ANTON NICAJElectrical103/21/2026
CARL WEISSElectrical103/21/2026
KIRK, DANIELElectrical103/21/2026
MILLAR ELEVATOR IND., INCElectrical103/21/2026
OLLEN, MATTHEWElectrical103/21/2026
PEREIRA, WESLLEYElectrical103/21/2026
ROBERT MARCHISOTTOElectrical103/21/2026
BREFFNI MECHANICAL INCGeneral Contractor109/09/2026
MCMANUS MECHANICAL MAINTAGeneral Contractor107/22/2026
RESTORATION GUIDEGeneral Contractor108/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WALTER T. GORMAN, P.E., P2681108/24/2026
ARCO ENGINEERING PC3769210/11/2021
PIRO STUDIO LLC7503101/13/2020
CATALDO ENGINEERING, P.C.2174109/19/2019
CONLON ENGINEERING, LLC4722109/19/2019
Building Lifecycle
All (77)Filed (21)Permit Issued (22)Signed Off (14)Facade (FISP) (12)Inspection (8)
09/08/2026
Permit issued — Mechanical Systems
M01430597-I1-MS
09/02/2026
Filed — Alteration
INTERIOR RENOVATION ON EXISTING 17TH FLOOR SPACE. NO CHANGE TO USE,, OCCUPANCY OR EGRESS.
M01403083-S1
08/24/2026
Filed — Alteration
Propose to install new HVAC units. No change in use, egress or occupancy.
M01430597-I1
08/20/2026
Permit issued — General Construction
M01403083-I1-GC
08/03/2026
Permit issued — General Construction
M01430573-I1-GC
07/29/2026
Filed — Alteration
Propose interior renovation of non-load bearing partitions, doors & lighting. No change in use, egress or occupancy.
M01430573-I1
07/29/2026
Permit issued — Sprinklers
M01430645-I1-EW-SP
07/29/2026
Permit issued — Plumbing
M01430645-I1-PL
07/28/2026
Filed — Alteration
Propose to perform renovation of existing commercial floor with new plumbing fixtures and modification of existing sprinkler system. No change in use, egress or occupancy.
M01430645-I1
07/20/2026
Permit issued — General Construction
M01403083-I1-GC
06/25/2026
Filed — Alteration
INTERIOR RENOVATION ON EXISTING 17TH FLOOR SPACE. NO CHANGE TO USE,, OCCUPANCY OR EGRESS.
M01403083-I1
10/31/2023
Signed off — Alteration
Propose modification of existing sprinkler system. No change in use, egress or occupancy.
M00839216-I1
10/13/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/10/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/02/2023
Signed off — Alteration
Propose to perform interior renovations. No change in use, egress or occupancy.
M00839271-I1
05/12/2023
Signed off — Alteration
Propose to perform sprinkler work. No change in use, egress or occupancy.
M00806789-I1
04/28/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/24/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/19/2023
Signed off — Alteration
M00806767-I1
03/30/2023
Permit issued — Sprinklers
M00839216-I1-EW-SP
03/29/2023
Permit issued — General Construction
M00839271-I1-GC
03/24/2023
Filed — Alteration
Propose modification of existing sprinkler system. No change in use, egress or occupancy.
M00839216-I1
03/24/2023
Filed — Alteration
Propose to perform interior renovations. No change in use, egress or occupancy.
M00839271-I1
03/09/2023
Permit issued — General Construction
M00806767-I1-GC
02/22/2023
Filed — Alteration
M00806767-I1
02/21/2023
Signed off — Alteration
Propose to perform plumbing and sprinkler work. No change to use, egress or occupancy.
M00753890-I1
02/08/2023
Permit issued — Sprinklers
M00806789-I1-EW-SP
02/07/2023
Signed off — Alteration
M00753764-I1
02/07/2023
Signed off — Alteration
M08004298-I1
02/06/2023
Filed — Alteration
Propose to perform sprinkler work. No change in use, egress or occupancy.
M00806789-I1
02/06/2023
Signed off — Alteration
Propose to install new HVAC unit. No change to use, egress or occupancy.
M00761636-I1
01/26/2023
Filed — Alteration
Propose to install new HVAC unit. No change to use, egress or occupancy.
M00761636-P1
11/27/2022
Permit issued — Mechanical Systems
M08004298-I1-MS
11/04/2022
Filed — Alteration
M08004298-I1
11/02/2022
Cycle 9 facade report submitted
10/26/2022
Cycle 9 facade inspection completed
10/26/2022
Cycle 9 facade report signed — SWARMP
10/24/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/29/2022
Permit issued — Mechanical Systems
M00761636-I1-MS
07/29/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/28/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/27/2022
Filed — Alteration
Propose to install new HVAC unit. No change to use, egress or occupancy.
M00761636-I1
07/26/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/06/2022
Permit issued — Plumbing
M00753890-I1-PL
07/06/2022
Permit issued — Sprinklers
M00753890-I1-EW-SP
07/06/2022
Permit issued — General Construction
M00753764-I1-GC
07/05/2022
Filed — Alteration
M00753764-I1
07/01/2022
Filed — Alteration
Propose to perform plumbing and sprinkler work. No change to use, egress or occupancy.
M00753890-I1
02/15/2022
Signed off — Alteration
Propose installation of (2) new condensers. No change to use, egress or occupancy.
M00671556-I1
02/09/2022
Permit issued — Mechanical Systems
M00671556-I1-MS
02/07/2022
Filed — Alteration
Propose installation of (2) new condensers. No change to use, egress or occupancy.
M00671556-I1
01/11/2022
Signed off — Alteration
POST APPROVED AMMENDMENT FILED FOR REVISIONS TO PLANS, SUBMISSION OF STANDPIPE AND SPRINKLER RISER DIAGRAMS, SUPERSEDE PAGE SP-117.00 TO SP-117.01. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00197721-I1
10/11/2021
Filed — Alteration
POST APPROVED AMMENDMENT FILED FOR REVISIONS TO PLANS, SUBMISSION OF STANDPIPE AND SPRINKLER RISER DIAGRAMS, SUPERSEDE PAGE SP-117.00 TO SP-117.01. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00197721-P2
09/29/2021
Permit issued — Sprinklers
M00197721-I1-EW-SP
08/31/2021
Signed off — Alteration
Propose to file for removal of interior partitions. No change to use, egress or occupancy.
M00555725-I1
07/22/2021
Permit issued — General Construction
M00555725-I1-GC
07/20/2021
Filed — Alteration
Propose to file for removal of interior partitions. No change to use, egress or occupancy.
M00555725-I1
07/16/2020
Permit issued — Sprinklers
M00197721-I1-EW-SP
02/11/2020
Signed off — Alteration
M00198456-I1
01/28/2020
Signed off — Alteration
INSTALLATION: (1) 20 TON SPLIT SYSTEM, ACCU-1 ON THE 2ND FLOOR, AHU-1 ON 1ST FLOOR, (1) 8 TON SPLIT SYSTEM, ACCU-2 & AHU-2 ON 2ND FLOOR, (1) 8 TON AIR COOLED PACKAGE UNIT AC-1 LOCATED ON THE 2ND FLOOR
M00269821-I1
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedBREFFNI MECHANICAL INC09/08/2026
DOB NOWGeneral ConstructionPermit IssuedTHE RESTORATION GUIDE LLC08/20/2026
DOB NOWGeneral ConstructionPermit IssuedSARK FLOORING LLC08/03/2026
DOB NOWSprinklersPermit IssuedLT FIRE PROTECTION CORP07/29/2026
DOB NOWPlumbingPermit IssuedG. C. PLBG & HTG INC07/29/2026
DOB NOWGeneral ConstructionPermit IssuedMCMANUS MECHANICAL MAINTA07/20/2026
DOB NOWSprinklersSigned-offGRUSHINSKY PIPNG & HTG IN03/30/2023
DOB NOWGeneral ConstructionSigned-offPHASE 3 INTERIORS LLC03/29/2023
DOB NOWGeneral ConstructionSigned-offPHASE 3 INTERIORS LLC03/09/2023
DOB NOWSprinklersSigned-offGRUSHINSKY PIPNG & HTG IN02/08/2023
DOB NOWMechanical SystemsSigned-offSARK FLOORING LLC11/27/2022
DOB NOWMechanical SystemsSigned-offCASELLA CONSTRUCTION CORP.07/29/2022
DOB NOWPlumbingSigned-offG. C. PLBG & HTG INC07/06/2022
DOB NOWSprinklersSigned-offLT FIRE PROTECTION CORP07/06/2022
DOB NOWGeneral ConstructionSigned-offCASELLA CONSTRUCTION CORP.07/06/2022
DOB NOWMechanical SystemsSigned-offSARK FLOORING LLC02/09/2022
DOB NOWSprinklersSigned-offLT FIRE PROTECTION CORP09/29/2021
DOB NOWGeneral ConstructionSigned-offPREMIER SANITATION LLC07/22/2021
DOB NOWSprinklersSigned-offLT FIRE PROTECTION CORP07/16/2020
DOB NOWMechanical SystemsSigned-offPALONE BROTHERS AIR01/22/2020
DOB NOWSignSigned-offELMER DAWSON11/06/2019
DOB NOWStructuralSigned-offJRR CONTRACTING INC11/04/2019
BISPLISSUEDDEMAR PLUMBING CORP12/04/2018
BISSPISSUEDDEMAR PLUMBING CORP12/04/2018
BISOTISSUEDCROWN INTERIORS INC11/29/2018
BISMHISSUEDCROWN INTERIORS INC11/29/2018
BISSPISSUEDTTM GROUP CORP11/16/2018
BISSPISSUEDTTM GROUP CORP10/19/2018
BISPLISSUEDTT MECHANICAL CORP10/09/2018
BISEQISSUEDUNIVERSAL BUILD SUPP LLC10/04/2018
BISPLISSUEDJ.A. MECH. PLBG. & HTG IN09/21/2018
BISOTISSUEDOCS BUILDERS GROUP LLC09/14/2018
BISMHISSUEDOCS BUILDERS GROUP LLC09/12/2018
BISMHISSUEDIDDC LLC08/09/2018
BISOTISSUEDIDDC LLC08/09/2018
BISOTISSUEDIDDC LLC08/09/2018
BISPLISSUEDKBM BRAND P AND H CO. INC07/23/2018
BISOTISSUEDCROWN INTERIORS INC07/19/2018
BISOTISSUEDJRR CONTRACTING INC03/29/2018
BISMHISSUEDBRENNAN OPERATING INC03/13/2018
+ 32 more permits on file
1 project · most recent 08/24/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/24/2026Permit IssuedBREFFNI MECHANICAL INCAir Conditioning Systems
Cooling
Lg ZRNU483M3AA 48,100 BTU · Split System ×4
ZRNU243MAAA 24,200 BTU · Vrf Indoor ×2
ZRNU423M2AA 42,000 BTU · Split System ×2
ZRUM168BTE6 168,000 BTU · Vrf Outdoor ×2
1 project · most recent 07/28/2026
FiledStatusContractorScope
07/28/2026Permit IssuedLT FIRE PROTECTION CORP240 heads
1 project · most recent 07/28/2026
Water/Sanitary
FiledStatusContractorScope
07/28/2026Permit IssuedG. C. PLBG & HTG INCWater/Sanitary
9 projects · most recent 09/10/2026
General Wiring
FiledStatusContractorScope
09/10/2026Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
07/31/2026Permit IssuedSALVATORE CAMPISI & SONSGeneral Wiring
03/25/2026Permit IssuedDENALI ELECTRIC CORP—
09/04/2025Permit IssuedDENALI ELECTRIC CORP—
09/12/2023Permit IssuedALL CITY ELECTRICAL INCGeneral Wiring
02/08/2019CompleteECS ELEC'L CONTG SERV INCGeneral Wiring
09/11/2018CompleteALL PURPOSE ELECTRIC CORPGeneral Wiring
03/05/2018CompleteAPS ELECTRIC INCGeneral Wiring
12/05/2017CompleteTAFT ELECTRIC CO. INC.General Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/13/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/10/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/28/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/24/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/24/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/29/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/26/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
07/27/2026Maintenance informationWalter Gormanenergy_progress
07/14/2026HVAC-R and service water piping design and insulationWalter Gormanenergy_progress
07/14/2026HVAC-R and service water heating system controlsWalter Gormanenergy_progress
07/14/2026Maintenance informationWalter Gormanenergy_progress
07/14/2026FinalWalter Gormanprogress
07/14/2026Energy Code Compliance InspectionsWalter Gormanprogress
07/14/2026Fire-Resistant Penetrations and JointsWalter Gormanspecial
07/14/2026Mechanical SystemsWalter Gormanspecial
07/14/2026Shutoff dampersWalter Gormanenergy_progress
07/14/2026HVAC-R and service water heating system controlsWalter Gormanenergy_progress
07/14/2026HVAC-R and service water piping design and insulationWalter Gormanenergy_progress
07/14/2026HVAC-R and service water heating equipmentWalter Gormanenergy_progress
07/14/2026Energy Code Compliance InspectionsWalter Gormanprogress
07/14/2026Sprinkler SystemsWalter Gormanspecial
07/14/2026Fire-Resistant Penetrations and JointsWalter Gormanspecial
07/14/2026HVAC-R and service water heating equipmentWalter Gormanenergy_progress
06/16/2026Interior lighting powerDavid Gauldenergy_progress
06/16/2026Lighting controlsDavid Gauldenergy_progress
06/16/2026Energy Code Compliance InspectionsDavid Gauldprogress
05/15/2026FinalDavid Gauldprogress
03/06/2023Energy Code Compliance InspectionsWalter Gormanprogress
03/06/2023Finalandrew tullerprogress
03/06/2023Fire-Resistance Rated ConstructionWalter Gormanprogress
02/03/2023Fire-Resistant Penetrations and JointsWalter Gormanspecial
02/03/2023Interior lighting powerWalter Gormanenergy_progress
Latest 25 of 70.
▾Documents — 1,091 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch15
09/03/2026M00555725-I1Request digital key ↗
09/02/2026M00671556-I1Request digital key ↗
09/02/2026M00753890-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/05/2026M00197721-I1Request digital key ↗
08/15/2026M00197721-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00269821-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00242945-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00198456-I1Request digital key ↗
▸Applications & Permits220
▸BISPLAN / WORK APPROVAL APPLICATION132
07/07/2021121366716Open ↗
07/02/2021121366716Open ↗
03/24/2021123543255Open ↗
Showing 3 of 132 on file for this type
▸BISWORK PERMIT APPLICATION71
12/04/2018123543255Open ↗
12/04/2018123543255Open ↗
11/29/2018123543255Open ↗
Showing 3 of 71 on file for this type
▸DOB NOWLPC Approval/Permit14
09/03/2026M00555725-I1Open ↗
09/02/2026M00671556-I1Open ↗
09/02/2026M00761636-I1Open ↗
Showing 3 of 14 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLACE OF ASSEMBLY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications283
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION135
03/28/2019123402095Open ↗
03/28/2019123402095Open ↗
03/14/2019123163352Open ↗
Showing 3 of 135 on file for this type
▸DOB NOWProgress Inspector Seal & Signature42
09/23/2026M01430597-I1Open ↗
09/23/2026M01430597-I1Open ↗
09/23/2026M01430597-I1Open ↗
Showing 3 of 42 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT32
11/29/2018123543255Open ↗
11/29/2018123543255Open ↗
Showing 2 of 32 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST28
11/29/2018123543255Open ↗
09/12/2018122911224Open ↗
Showing 2 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
09/05/2026M00197721-I1Open ↗
09/05/2026M00197721-P2Open ↗
09/03/2026M00555725-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/23/2026M01430597-I1Open ↗
09/23/2026M01430597-I1Open ↗
09/02/2026M00671556-I1Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment76
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE27
06/26/2019123543255Open ↗
06/24/2019123543255Open ↗
11/29/2018123543255Open ↗
Showing 3 of 27 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT15
08/10/2021123485219Open ↗
08/04/2021123485219Open ↗
03/26/2021123543255Open ↗
Showing 3 of 15 on file for this type
▸BISEQUIPMENT USE PERMITS13
08/10/2021123485219Open ↗
08/04/2021123485219Open ↗
03/26/2021123543255Open ↗
Showing 3 of 13 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA12
07/17/2020123408598Open ↗
06/25/2020123682112Open ↗
10/22/2019122908238Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING5
01/05/2021123543255Open ↗
Showing 1 of 5 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
10/22/2019122908238Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
12/15/2020123543255Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos60
▸BISASBESTOS: CERTIFICATION (DEP ACP5)31
02/20/2019123682112Open ↗
11/29/2018123543255Open ↗
11/20/2018123408598Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report20
09/05/2026M00197721-P2Open ↗
09/05/2026M00197721-I1Open ↗
09/03/2026M00555725-I1Open ↗
Showing 3 of 20 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance73
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS43
11/29/2018123543255Open ↗
11/29/2018123543255Open ↗
10/26/2018121225922Open ↗
Showing 3 of 43 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS19
10/26/2018121225922Open ↗
09/28/2018123254717Open ↗
09/28/2018123501175Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWEN2: As Built Energy Analysis4
09/02/2026M00671556-I1Open ↗
09/02/2026M00753890-I1Open ↗
08/13/2026M00761636-I1Open ↗
Showing 3 of 4 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/15/2020123543255Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/15/2020123543255Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY11
08/06/2021123485219Open ↗
08/05/2021123485219Open ↗
08/05/2021123485219Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs123
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST51
10/28/2025123485219Open ↗
03/25/2021123543255Open ↗
03/01/2021123408598Open ↗
Showing 3 of 51 on file for this type
▸BISLANDMARKS APPROVAL37
03/28/2019123402095Open ↗
03/28/2019123402095Open ↗
11/29/2018123543255Open ↗
Showing 3 of 37 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE11
07/07/2021121366716Open ↗
07/02/2021121366716Open ↗
03/02/2021121366716Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
09/12/2019121366716Open ↗
05/14/2019123383196Open ↗
05/06/2019121366716Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLANDMARKS SIGNOFF1
12/15/2020123543255Open ↗
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHED LETTER1
10/05/2018123163352Open ↗
▸Cost, Insurance & Ownership86
▸BISCOST AFFIDAVIT85
08/04/2021123485219Open ↗
03/01/2021123408598Open ↗
02/03/2021123682112Open ↗
Showing 3 of 85 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
12/15/2020123543255Open ↗
▸Filing & Intake Forms128
▸BISEFILING COVER SHEET54
02/20/2019123682112Open ↗
11/29/2018123543255Open ↗
11/29/2018123543255Open ↗
Showing 3 of 54 on file for this type
▸BISBOROUGH INTAKE FORM47
03/11/2020121366716Open ↗
12/13/2019121366716Open ↗
09/12/2019121366716Open ↗
Showing 3 of 47 on file for this type
▸BISADDITIONAL INFORMATION24
03/01/2021123408598Open ↗
03/02/2020123543255Open ↗
06/26/2019123543255Open ↗
Showing 3 of 24 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents6
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
07/12/2021121366716Open ↗
02/20/2019123576451Open ↗
10/19/2018123486076Open ↗
Showing 3 of 5 on file for this type
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type