| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/27/2026 | — | — | Air Conditioning Systems | |
| 11/10/2025 | Permit Issued | GIANCOLA CONTRACTORS INC | Heating and Air Conditioning Systems | Heat / Cool Ice Air 8VSHPW24-C 28,800 BTU · Wshp ×1 |
| 04/11/2025 | Permit Issued | COTTAM HEATING & AIR COND | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric PEAD-A42AA9 42,000 BTU · Fan Coil Indoor ×1 PUZ-A42NKA7 42,000 BTU · Condensing Unit ×1 |
| 09/29/2022 | Permit Issued | EASTMAN COOKE & ASSOCIATE | Associated Ducts and Piping | Ducts & Piping Carnes RTD8 300 CFM · Vav Box ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/10/2025 | Permit Issued | LEGUCI PIPING&HEATING LLC | 3 heads |
| 11/29/2022 | Permit Issued | ADDISON PLBG AND HTG CORP | 64 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/06/2026 | Permit Issued | VRISI PLBG & HTG LLC | Water/Sanitary |
| 04/14/2026 | — | — | Water/Sanitary |
| 11/17/2025 | Signed-off | HYDROKINETIC PLBG & HTG I | Gas, Water/Sanitary |
| 11/10/2025 | Signed-off | NEW YORK PARK PLBG&HTG CO | Gas, Water/Sanitary |
| 10/13/2025 | Signed-off | SERVICE TECH MECH&PLBG IN | Gas, Water/Sanitary |
| 08/29/2023 | Signed-off | MONARCH PLUMB & HTG LLC | Gas, Water/Sanitary |
| 03/02/2023 | Signed-off | NICE PLUMBING CORP | Water/Sanitary |
| 02/21/2023 | Permit Issued | ADDISON PLBG AND HTG CORP | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/09/2026 | Permit Issued | NION ELECTRIC CORP | General Wiring |
| 08/26/2026 | Permit Issued | TOP SHELF ELECTRIC CORP | — |
| 06/01/2026 | Permit Issued | JOSEPH WEINSTEIN ELECTRIC | General Wiring |
| 03/26/2026 | Complete | NORCAL ELECTRIC LLC | General Wiring |
| 01/27/2026 | Complete | KWONG MING ELECTRIC INC | — |
| 11/17/2025 | Complete | THE METRO GROUP ELECTRIC | General Wiring |
| 08/19/2025 | Complete | ELPO ELECTRICAL CONTG INC | General Wiring |
| 10/15/2024 | Complete | AVALON ELECTRIC CORP. | General Wiring |
| 10/15/2024 | Complete | AVALON ELECTRIC CORP. | — |
| 10/14/2024 | Complete | AVALON ELECTRIC CORP. | General Wiring |
| 09/13/2024 | Complete | BIGMAN BROS., INC. | General Wiring |
| 07/22/2024 | Complete | AVALON ELECTRIC CORP. | — |
| 03/05/2024 | Complete | BP ELECTRIC & COOLING INC | General Wiring |
| 01/26/2023 | Complete | LINA ELECTRIC, CORP | General Wiring |
| 11/16/2022 | Permit Issued | AERO ELECTRIC CORP | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/13/2026 | Permit Issued | BRENER CONSTRUCTION 212 | Tenant Protection Plan 72 Hour |
| 11/17/2025 | Signed-off | GALLERY RESTORATION LTD | Tenant Protection Plan 72 Hour |
| 11/10/2025 | Permit Issued | LEGUCI PIPING&HEATING LLC | Tenant Protection Plan 72 Hour |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/04/2026 | Permit Issued | NEW ROC CONTRACTING CORP | Suspended Scaffold (SC) |
| 05/08/2026 | Permit Issued | COLE NYC LLC | — |
| Owner | Filings | Most Recent |
|---|---|---|
| FIRST SERVICE RESIDENTIAL | 6 | 09/13/2026 |
| FIRSTSERVICE RESIDENTIAL | 1 | 08/06/2026 |
| 200 CHAMBERS | 86 | 07/14/2026 |
| DEPARTMENT OF EDUCATION | 3 | 03/22/2026 |
| TO THE OWNER OF | 6 | 03/22/2026 |
| HALSTEAD MANAGEMENT CO LL | 1 | 03/22/2026 |
| 200 CHAMBER STREET CONDOMINIUM | 42 | 03/22/2026 |
| OWNER OF 200 CHAMBERS STR | 5 | 03/22/2026 |
| OWNER OF 200 CHAMBER STRE | 2 | 03/22/2026 |
| WESTCHAMOERS ST ASSC. LLC | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| GEORGE J. XERAKIAS, PE | 1 | 08/04/2026 |
| CTHREE ARCHITECTURE + DESIGN, PC | 2 | 06/02/2026 |
| NIZA WORKS OF ARCHITECTURE PLLC | 2 | 05/06/2026 |
| MG ENGINEERING D.P.C. | 2 | 04/14/2026 |
| ARCHELA | 1 | 04/14/2026 |
| MARCO GIARDINA ARCHITECTURE, PLLC | 1 | 01/13/2026 |
| ENGINEERING PROFESSIONAL SERVICE P. | 2 | 11/17/2025 |
| FORTY SEVENTY-THREE, LLC | 3 | 11/10/2025 |
| WAVIC ENGINEERING PLLC | 1 | 10/27/2025 |
| STEEL CORE ENGINEERING PLLC | 1 | 10/27/2025 |
| RAND ENGINEERING & ARCHITECTURE, DP | 4 | 10/13/2025 |
| RAND ENGINEERING & ARCHITECTURE DPC | 6 | 02/06/2025 |
| GILSANZ MURRAY STEFICEK LLP | 2 | 09/11/2024 |
| LUKE LICALZI, P.E., P.C. | 1 | 08/08/2024 |
| RDDNY DESIGN BUILD CORP | 1 | 06/11/2024 |
| GILLEN - KONUK ARCHITECTURE, DPC | 2 | 01/12/2024 |
| GLEN FRIES ASSOCIATES | 2 | 08/29/2023 |
| OFFICE OF JAMES RUDERMAN | 1 | 06/06/2023 |
| C3D ARCHITECTURE PLLC | 5 | 04/13/2023 |
| XIAOPENG WANG DESIGN LLC | 2 | 03/02/2023 |
| KERI ENGINEERING, P.C. | 6 | 02/21/2023 |
| PAUL PERDEK, PROF. ENG. PLLC | 1 | 08/21/2022 |
| STEVEN M. YANG ARCHITECT LLC | 3 | 06/23/2022 |
| LEO Y LEE ASSOCIATES | 1 | 02/28/2022 |
| BROMLEY CALDARI ARCHITECTS | 1 | 01/24/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| METROPOLIS GROUP INC | 22 | 03/21/2026 |
| JENNY FLORES EXPEDITING | 5 | 03/21/2026 |
| JULIAN A. GOMEZ | 22 | 03/21/2026 |
| NYKB | 3 | 03/21/2026 |
| CODE | 8 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 8 | 03/21/2026 |
| JON LIBASCI RA | 2 | 03/21/2026 |
| CLARKE CONSTRUCTION CONSULTANTS | 2 | 03/21/2026 |
| PWF | 2 | 03/21/2026 |
| AE DESIGN SOLUTION | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| SPRING SCAFFOLDING LLC | General Contractor | 9 | 09/13/2026 |
| NY KITCHEN & BATH USA COR | General Contractor | 7 | 07/08/2026 |
| THE METRO GROUP, INC | General Contractor | 7 | 07/08/2026 |
| RDDNY DESIGN BUILD CORP | General Contractor | 4 | 07/08/2026 |
| SIMPLE CHOICE PLBG AND HT | Plumbing | 3 | 07/08/2026 |
| COTTAM HEATING & AIR CONDIT. | General Contractor | 3 | 07/08/2026 |
| BYPASS MECHANICAL CORP | Plumbing | 3 | 07/08/2026 |
| SCUTTARI CONSTRUCTION INC | General Contractor | 3 | 03/21/2026 |
| EASTMAN COOKE & ASSOCIATE | General Contractor | 3 | 07/08/2026 |
| HEIGHTS CONSTRUCTION CORP | General Contractor | 3 | 09/07/2026 |
| DLS MECHANICAL CORP | General Contractor | 3 | 03/21/2026 |
| NEW YORK PARK PLBG&HTG CO | Plumbing | 3 | 07/08/2026 |
| LIEBHABER COMPANY INC | General Contractor | 3 | 07/08/2026 |
| PLUMBING WORKS CORP | Fire Protection | 2 | 07/08/2026 |
| SUPREME CONSTR & MAINT CO | General Contractor | 2 | 07/14/2026 |
| ADDISON PLBG AND HTG CORP | Plumbing | 2 | 07/08/2026 |
| GALLERY RESTORATION LTD | General Contractor | 2 | 03/21/2026 |
| ALBA GROUP INC | General Contractor | 2 | 07/08/2026 |
| ADDISON PLBG AND HTG CORP | Fire Protection | 2 | 07/08/2026 |
| J & P PAINTING INC | General Contractor | 2 | 03/21/2026 |
| COOK & KRUPA LLC | General Contractor | 2 | 03/21/2026 |
| MONARCH PLUMB & HTG LLC | Plumbing | 1 | 07/08/2026 |
| NAT'L MECH. SVCS PLBG LLC | Plumbing | 1 | 07/08/2026 |
| NICE PLUMBING CORP | Plumbing | 1 | 07/08/2026 |
| SERVICE TECH MECH&PLBG IN | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| SAG ENGINEERING & CONSULT | 608 | 4 | 06/02/2026 |
| NIZA WORKS OF ARCH PLLC | 6101 | 2 | 05/06/2026 |
| BRIAN ILL DEVELOPMENT LLC | 1402 | 1 | 04/14/2026 |
| BUILDTECH ENGINEERING | 6369 | 1 | 11/17/2025 |
| WINTON GROUP ARCHITECTURE | 4343 | 6 | 11/10/2025 |
| RAND ENGINEERING & ARCHIT | 266 | 11 | 10/13/2025 |
| GILSANZ MURRAY STEFICEK | 240 | 2 | 09/11/2024 |
| SD TESTING & INSPECTION S | 7010 | 1 | 06/11/2024 |
| GEIGER ENGINEERING. PC | 689 | 2 | 01/12/2024 |
| MJ ENGINEERING & DESIGN | 5546 | 1 | 01/12/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sidewalk Shed | Permit Issued | SPRING SCAFFOLDING LLC | 09/11/2026 |
| DOB NOW | General Construction | Permit Issued | HEIGHTS CONSTRUCTION CORP | 09/03/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | NEW ROC CONTRACTING CORP | 08/05/2026 |
| DOB NOW | General Construction | Permit Issued | HEIGHTS CONSTRUCTION CORP | 07/24/2026 |
| DOB NOW | General Construction | Permit Issued | SUPREME CONSTR & MAINT CO | 07/13/2026 |
| DOB NOW | General Construction | Permit Issued | SUPREME CONSTR & MAINT CO | 06/25/2026 |
| DOB NOW | General Construction | Permit Issued | W5 GROUP LLC | 06/12/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | COLE NYC LLC | 05/26/2026 |
| DOB NOW | Plumbing | Permit Issued | VRISI PLBG & HTG LLC | 05/21/2026 |
| DOB NOW | General Construction | Permit Issued | HEIGHTS CONSTRUCTION CORP | 05/20/2026 |
| DOB NOW | General Construction | Permit Issued | BRENER CONSTRUCTION 212 | 02/06/2026 |
| DOB NOW | Sprinklers | Permit Issued | LEGUCI PIPING&HEATING LLC | 01/20/2026 |
| DOB NOW | General Construction | Signed-off | GALLERY RESTORATION LTD | 12/30/2025 |
| DOB NOW | Plumbing | Signed-off | NEW YORK PARK PLBG&HTG CO | 12/19/2025 |
| DOB NOW | General Construction | Permit Issued | GIANCOLA CONTRACTORS INC | 12/16/2025 |
| DOB NOW | Plumbing | Signed-off | HYDROKINETIC PLBG & HTG I | 12/16/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | COTTAM HEATING AIR COND | 06/02/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | COTTAM HEATING AIR COND | 05/30/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | COTTAM HEATING AIR COND | 05/12/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | SERVICE TECH MECHANICAL * | 04/10/2025 |
| DOB NOW | Plumbing | Signed-off | SERVICE TECH MECH&PLBG IN | 04/10/2025 |
| DOB NOW | General Construction | Permit Issued | GREATER BUILDING SERVICES | 04/07/2025 |
| DOB NOW | General Construction | Permit Issued | LIEBHABER COMPANY | 04/04/2025 |
| DOB NOW | General Construction | Signed-off | RDDNY DESIGN BUILD CORP | 03/11/2025 |
| DOB NOW | Sprinklers | Permit Issued | BUCKMILLER AUTO.SPKLR.COR | 12/23/2024 |
| DOB NOW | General Construction | Permit Issued | LIEBHABER COMPANY | 10/03/2024 |
| DOB NOW | Structural | Signed-off | KNS BUILDING REST | 09/16/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | KAY WATERPROOFING CORP. | 08/14/2024 |
| DOB NOW | General Construction | Signed-off | RDDNY DESIGN BUILD CORP | 06/18/2024 |
| DOB NOW | General Construction | Permit Issued | SCUTTARI CONSTRUCTION INC | 02/28/2024 |
| DOB NOW | Plumbing | Signed-off | MONARCH PLUMB & HTG LLC | 02/27/2024 |
| DOB NOW | General Construction | Signed-off | THE METRO GROUP, INC | 02/26/2024 |
| DOB NOW | Structural | Signed-off | RALLY RESTORATION CORP | 07/27/2023 |
| DOB NOW | Plumbing | Signed-off | NAT'L MECH. SVCS PLBG LLC | 07/06/2023 |
| DOB NOW | Structural | Signed-off | THE METRO GROUP, INC | 07/05/2023 |
| DOB NOW | Plumbing | Signed-off | NICE PLUMBING CORP | 03/21/2023 |
| DOB NOW | General Construction | Signed-off | THE METRO GROUP, INC | 02/27/2023 |
| DOB NOW | General Construction | Permit Issued | NY KITCHEN & BATH USA COR | 01/20/2023 |
| DOB NOW | Plumbing | Permit Issued | PRODIGY PLBG & HTG CORP | 12/13/2022 |
| DOB NOW | Sprinklers | Permit Issued | PRODIGY PLBG&HTG CORP | 12/13/2022 |
| Date | Type | Result | Report |
|---|---|---|---|
| 06/30/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/19/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/07/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/03/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/09/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/29/2026 | Certified StandPipe - SD - Alarm Sys 64/09 - Finish | Certified | View ↗ |
| 01/29/2026 | Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments) | Certified | View ↗ |
| 01/29/2026 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| 01/12/2026 | Pass-Final PL - More than 10 Requested Floors | Pass | View ↗ |
| 07/15/2025 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 07/08/2025 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 06/12/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/11/2025 | Fail-Final CND-Occupancy Inspection | Fail | View ↗ |
| 06/06/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 05/29/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/09/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/10/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/10/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/08/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/28/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/09/2024 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 01/12/2024 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 09/07/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/06/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/01/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/02/2026 | Final | Salvatore Croce | progress |
| 06/02/2026 | Tenant Protection Plan Compliance | Chester Kowalski | special |
| 05/06/2026 | Fire-Resistant Penetrations and Joints | Nicolas Zapata | special |
| 05/06/2026 | Energy Code Compliance Inspections | Nicolas Zapata | progress |
| 05/06/2026 | Fire-Resistant Penetrations and Joints | Nicolas Zapata | special |
| 05/06/2026 | Energy Code Compliance Inspections | Nicolas Zapata | progress |
| 05/06/2026 | Final | Gary Bennett | progress |
| 05/06/2026 | Lighting in dwelling units | Nicolas Zapata | energy_progress |
| 05/06/2026 | Interior lighting power | Nicolas Zapata | energy_progress |
| 04/02/2026 | Tenant Protection Plan Compliance | BRIAN ILL | special |
| 04/02/2026 | Tenant Protection Plan Compliance | — | special |
| 03/26/2026 | Energy Code Compliance Inspections | — | progress |
| 03/26/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 03/25/2026 | Electrical motors and elevators | — | energy_progress |
| 03/25/2026 | Maintenance information | — | energy_progress |
| 03/25/2026 | Post-installed Anchors | — | special |
| 03/25/2026 | Tenant Protection Plan Compliance | — | special |
| 03/25/2026 | Final | — | progress |
| 03/25/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 03/25/2026 | Duct leakage testing, insulation and design | — | energy_progress |
| 03/25/2026 | Mechanical Systems | — | special |
| 03/25/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 03/25/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 03/25/2026 | Shutoff dampers | — | energy_progress |
| 02/12/2026 | Final | Enkela Malellari | progress |