200 EAST END AVENUE
MANHATTAN · BIN 1051371
💬 Discuss this project
1952Year Built
16Stories
D4Building Class
R10AZoning
254,928 sfGross Floor Area
191Units
LL97 CoveredRent Stabilized0 Active Violations 4 likely answered ▸FISP: SWARMP
Elevator cooperative · 30,150 sf lot · 8.46 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofOrsid Realty CORP.16p · 1 filing · 17 docs
Floor 16Unit 16A, Unit 16P, Unit 16AP +19p · 2 filings · 12 docs
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10Unit 10I, Unit 10KL3p · 3 filings · 12 docs
Floor 9Unit 9M1 filing · 6 docs
Floor 8
Floor 7Unit 7C, Unit 7FUnder Construction14p · 2 filings · 20 docs
Floor 6
Floor 5Unit 5H10p · 1 filing · 20 docs
Floor 4Unit 4H, Unit 4I25p · 1 filing · 20 docs
Floor 3Unit 3B, Unit 3C13p · 1 filing · 20 docs
Floor 2
Floor 1Unit 1K, Unit 1L12p · 1 filing · 18 docs
CellarOrsid Realty CORP.23p · 4 filings · 20 docs
Site & exteriorOrsid Realty CORP.21p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
East River Tenants11003/22/2026
1700 Yoek Associates803/21/2026
Kreisel503/21/2026
East River403/21/2026
E River Tenanats Corp Wallack M203/21/2026
Asisco103/21/2026
Revoltagen103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J A Expediting1403/21/2026
Green Light Expediting1203/21/2026
AE Design Solution203/21/2026
Socotec1003/21/2026
Ndkazalas Architecture203/21/2026
Anzalone Architecture1003/21/2026
J.A.M. Associates603/21/2026
Idm Associates603/21/2026
Spring Scaffolding603/21/2026
Code403/21/2026
GC Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EvgcGeneral Contractor507/08/2026
American Standard P&H CororpPlumbing507/08/2026
Spring ScaffoldingScaffold407/08/2026
Empire Scaffolding SystemGeneral Contractor403/21/2026
Dual Fuel CompanyGeneral Contractor303/21/2026
G&B Plumbing & HeatingPlumbing307/08/2026
Tower Building RestorationGeneral Contractor303/21/2026
Anchor PlumbingPlumbing203/21/2026
Crafted Interiors DesignGeneral Contractor203/21/2026
Dual Fuel Plumbing & HeatingPlumbing207/08/2026
Redline ElectricElectrical203/22/2026
Terry DesignGeneral Contractor203/21/2026
Muja General ContractingGeneral Contractor203/21/2026
Tec PlumbingPlumbing203/21/2026
Kent Shell Custom InteriorsGeneral Contractor203/21/2026
Powers Bridging & ScaffoldingScaffold203/21/2026
E.L. ContractingGeneral Contractor107/08/2026
EvgcGeneral Contractor103/21/2026
K&K Constructon GroupGeneral Contractor107/08/2026
Maxco ContractingGeneral Contractor103/21/2026
M N ServicesGeneral Contractor103/21/2026
New Family Homes BuildiGeneral Contractor103/21/2026
Nicholas SousourisGeneral Contractor103/21/2026
Orion Construction PaintingGeneral Contractor103/21/2026
Pier Head AssociatesGeneral Contractor103/21/2026
Sag ContractingGeneral Contractor103/21/2026
Skyline Restorationspecialty_contractor107/08/2026
Target New York ConstructionGeneral Contractor107/08/2026
Toned Paint ConstructionGeneral Contractor103/21/2026
Tower Building ServicesGeneral Contractor103/21/2026
Virgo InteriorsGeneral Contractor103/21/2026
Aljer Plumbing & HeatingPlumbing103/21/2026
Bay Ridge MechanicalPlumbing103/21/2026
BHIPlumbing103/21/2026
BMC PlumbingPlumbing103/21/2026
City Wide Plumbing SRVSPlumbing103/21/2026
Dumont Plumbing & HeatingPlumbing103/21/2026
Empires Plumbing MechanicalPlumbing103/21/2026
Galicja Plumbing & HeatingPlumbing103/21/2026
Gregg NY PlumbingPlumbing103/21/2026
Haron Plumbing & HeatingPlumbing103/21/2026
Held BrothersPlumbing103/21/2026
J R Plumbing Heat ContractingPlumbing103/21/2026
J Vulpis SonPlumbing103/21/2026
MaphPlumbing103/21/2026
M Jraus Inc Plumbing HeatPlumbing103/21/2026
RJC MechanicalPlumbing103/21/2026
Robert E WallPlumbing103/21/2026
William C Gerakaris PlumbingPlumbing103/21/2026
Target New York Constructionspecialty_contractor107/08/2026
Alklem PlumbingPlumbing107/08/2026
Arcon Plumbing SolutionsPlumbing107/08/2026
Premier Flow Plumbing and HeatingPlumbing107/08/2026
Proto P & H ServicesPlumbing107/08/2026
All Boro ElectricElectrical103/22/2026
Vertex P & HPlumbing107/08/2026
Heso ElectricalElectrical203/22/2026
JLC Electrical ContractingElectrical103/22/2026
AciscoGeneral Contractor103/21/2026
AG ClassicGeneral Contractor103/21/2026
AG ContractingGeneral Contractor103/21/2026
Bator BintorGeneral Contractor103/21/2026
Brandon JamesGeneral Contractor107/08/2026
C B General ContractingGeneral Contractor103/21/2026
Central Construction ManagementGeneral Contractor104/09/2026
Clark Wilkins IndustriesGeneral Contractor103/21/2026
Crystal ComfortGeneral Contractor103/21/2026
Designed ConcGeneral Contractor103/21/2026
DI MartiniGeneral Contractor103/21/2026
AAA Total PlumbingPlumbing107/22/2010
Advanced Plumbing, Heating & SprinklerPlumbing105/10/2004
AL Eastmond & SonsGeneral Contractor107/16/2003
Algozini PlumbingPlumbing109/21/2004
All Hour Sewer ServicesPlumbing112/19/1995
Amm General ContractingPlumbing108/09/2018
A.M. PlumbingPlumbing111/05/1999
Antenucci _____________MechanicalPlumbing107/19/2004
Art & Style RemodelingGeneral Contractor311/12/2013
Ballas PLB & HeatingPlumbing105/16/2000
Bei Construction & DevelopmentGeneral Contractor108/29/2005
Carmel-YorkGeneral Contractor107/10/2019
Colm LalorGeneral Contractor103/14/2011
Compusite Turnkey ConstructionGeneral Contractor111/03/2000
Dauric EnterprisesGeneral Contractor103/29/2005
D.N.A. ConstructionGeneral Contractor108/17/1998
Dyckman Plumbing & HeatingPlumbing110/12/2004
East Side RenovationGeneral Contractor107/05/2005
Elmwood Plumbing & HeatingPlumbing107/11/1995
Empire's Plumbing & MechanicalPlumbing101/04/2019
Eorge's MechanicalPlumbing110/31/2005
Etna ContractingGeneral Contractor108/02/2006
Five Stars Plumbing & HeatingPlumbing105/06/1998
Fred Smith PLG & HeatingPlumbing111/17/2006
Fred Smith PL & HeatingPlumbing106/08/1999
Glenns Plumbing ServicesPlumbing111/14/2014
GSB Construction Corp Dba New TEGeneral Contractor108/11/2004
Hanjo ContractorsGeneral Contractor105/30/1997
H & M ContractorsGeneral Contractor111/30/2007
Home Improvement Spec NYGeneral Contractor111/25/2011
House DekoGeneral Contractor105/09/2006
Ideal RenovationGeneral Contractor307/19/2010
Inwood CompanyGeneral Contractor210/18/2004
Julius MannGeneral Contractor105/22/2002
Kordun ConstructionPlumbing112/14/2018
Larry FLYNN/Dba W.L. FLYNN ConstructionGeneral Contractor104/08/1998
Lynes Plumbing & HeatingPlumbing109/13/2005
Mackler PL & HTPlumbing106/11/1998
Master Plumbing HeatPlumbing107/14/2005
Maxwell Plumbing MechanlPlumbing111/19/1993
McManus Mechanical MaintaGeneral Contractor110/22/2019
Mike Catsimalis Plumbing & HeatingPlumbing112/05/2011
Mirabile Plumbing & HeatingPlumbing112/18/2007
MJ LliguiGeneral Contractor111/20/2013
Northeast Plumbing & HeatingPlumbing112/07/2010
Nova Renovation SpecialistsGeneral Contractor112/10/2007
NytechGeneral Contractor112/24/1997
Pipe RitePlumbing109/17/2013
Poler ContractingGeneral Contractor109/28/1998
Prism General ServicesGeneral Contractor212/06/2011
P.S.I. MechanicalPlumbing106/26/2002
Reyvin Plumbing, HeatingPlumbing111/21/2000
Sarakin Construction DevelopmentGeneral Contractor106/14/2002
Spring EnterprisGeneral Contractor112/30/1999
Stuart IserPlumbing105/29/2002
Systems 2000 Plumbing ServicesPlumbing107/11/2019
T.B.R.General Contractor211/06/1998
Tower Buildding RestGeneral Contractor104/23/2001
United City General ContractorGeneral Contractor110/13/2006
Unlimited Mechanical & HeatingPlumbing107/15/2008
Vanguard Construction & Develop CompanyGeneral Contractor207/12/2004
Vered DesignsGeneral Contractor110/16/2013
Wayne's Builders & ConstructionGeneral Contractor112/30/2005
Widing Brothers PlumbingPlumbing109/28/1998
Zann ContractingGeneral Contractor106/14/2002
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Michael Zenreich1724110/15/2026
HT Engineering6274508/14/2026
New Age Engineering7746204/07/2026
Sag Engineering & Consulting608308/12/2025
Domani Inspection Service843506/02/2025
Integrity Consulting Service666206/05/2024
Group-S5216601/04/2024
Uni-D7898412/28/2022
Katz Engineering238104/19/2021
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
10/30/2026
Objection resolved — Resolved
10/28/2026
Objection raised — Fire_Protection
10/28/2026
Objection raised — Inspections
10/28/2026
Objection raised — Other
300 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBrandon James04/28/2026
DOB NOWPlumbingPermit IssuedAlklem Plumbing04/28/2026
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp02/04/2026
DOB NOWGeneral ConstructionSigned-offEvgc10/31/2025
DOB NOWGeneral ConstructionPermit IssuedEvgc10/30/2025
DOB NOWGeneral ConstructionSigned-offEvgc10/07/2025
DOB NOWGeneral ConstructionPermit IssuedEvgc10/07/2025
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp10/02/2025
DOB NOWStructuralPermit IssuedCentral Construction Management08/20/2025
DOB NOWGeneral ConstructionPermit IssuedEvgc08/14/2025
DOB NOWPlumbingPermit IssuedAmerican Standard P&H Cororp08/01/2025
DOB NOWPlumbingSigned-offArcon Plumbing Solutions10/11/2024
DOB NOWGeneral ConstructionSigned-offEL Contracting10/07/2024
DOB NOWPlumbingSigned-offVertex P & H09/11/2024
DOB NOWGeneral ConstructionSigned-offTarget New York Construction09/10/2024
DOB NOWMechanical SystemsSigned-offTarget New York Construction09/10/2024
DOB NOWGeneral ConstructionSigned-offDual Fuel Company06/20/2023
DOB NOWPlumbingSigned-offDual Fuel Plumbing & Heating06/20/2023
DOB NOWBoiler EquipmentSigned-offDual Fuel Plumbing & Heating06/20/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedSpring Scaffolding11/09/2022
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp10/13/2022
DOB NOWGeneral ConstructionSigned-offMuja General Contracting10/06/2022
DOB NOWGeneral ConstructionSigned-offSkyline Restoration08/08/2022
DOB NOWSidewalk ShedSigned-offSpring Scaffolding08/05/2022
DOB NOWSidewalk ShedSigned-offPowers Bridging & Scaffol07/15/2022
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp04/13/2022
DOB NOWPlumbingSigned-offDarinko Plumbing11/09/2021
DOB NOWPlumbingSigned-offDarinko Plumbing08/11/2021
DOB NOWPlumbingSigned-offDarinko Plumbing06/02/2021
DOB NOWGeneral ConstructionSigned-offK&K Constructon Group05/27/2021
DOB NOWPlumbingSigned-offGalicja Plumbing and Heating05/11/2021
DOB NOWPlumbingSigned-offProto P & H Services09/14/2020
BISOTISSUEDEvgc10/29/2021
BISOTISSUEDCrafted Interiors Design03/09/2021
BISOTISSUEDCrafted Interiors Design02/12/2021
BISOTISSUEDCrafted Interiors Design09/01/2020
BISOTISSUEDMcManus Mechanical Mainta10/22/2019
BISPLISSUEDSystems 2000 Plumbing Services07/11/2019
BISOTISSUEDCarmel-York07/10/2019
BISPLISSUEDPremier Flow Plumbing and Heating05/29/2019
+ 42 more permits on file
4 projects · most recent 10/15/2026
Water/Sanitary Gas
FiledStatusContractorScope
10/15/2026——Water/Sanitary
08/14/2026Signed-offCobalt MechanicalGas, Water/Sanitary
04/07/2026Permit IssuedAlklem PlumbingGas, Water/Sanitary
06/23/2025Permit IssuedCobalt MechanicalGas
25 projects · most recent 11/04/2026
General Wiring Boiler Controls
FiledStatusContractorScope
11/04/2026Permit IssuedGlendale Electl ContngGeneral Wiring
08/24/2026CompleteRedline Electric—
05/12/2026Permit IssuedStellmann ElectricalGeneral Wiring
02/02/2026CompleteHeso Electrical—
11/12/2025CompleteHeso ElectricalGeneral Wiring
10/08/2024CompleteRiviera ElectricGeneral Wiring
07/28/2024CompleteJumper ElectricGeneral Wiring
04/02/2024CompleteSupreme ElectricGeneral Wiring
09/11/2023CompleteAbec ElectricalGeneral Wiring
08/09/2023CompleteItkin ElectricBoiler Controls
06/26/2023CompleteV Electric NYGeneral Wiring
05/02/2023Permit IssuedAbilene Electric—
08/01/2022CompleteTop Shelf Electric—
07/18/2022CompleteGlendale Electl ContngGeneral Wiring
07/02/2022CompleteOptimal Electric—
1 project · most recent 11/08/2022
Sidewalk Shed
FiledStatusContractorScope
11/08/2022Permit IssuedSpring ScaffoldingSidewalk Shed
▾Field Inspections (DOB CAP) — 24
DateTypeResultReport
09/01/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/30/2025Pass-Final General Construction Non-Directive 14PassView ↗
09/16/2025Fail-Final General Construction Non-Directive 14FailView ↗
08/08/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/21/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/09/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/24/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/31/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/22/2023Pass-Final Boiler Equipment InspectionPassView ↗
10/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/16/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/13/2023Fail-Final General Construction Non-Directive 14FailView ↗
03/13/2023Pass-Final General Construction Non-Directive 14PassView ↗
03/08/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/03/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/02/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/13/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 117
DateRequirementInspectorRole
10/09/2026Final—progress
10/09/2026Lighting in dwelling units—energy_progress
10/09/2026Fire-Resistant Penetrations and Joints—special
10/09/2026Post-installed Anchors—special
10/09/2026Energy Code Compliance Inspections—progress
08/14/2026Fire-Resistant Penetrations and JointsHENRY TORRESspecial
07/22/2026Fire-Resistant Penetrations and JointsHENRY TORRESspecial
04/13/2026Fire-Resistant Penetrations and JointsStephen Shishkospecial
04/13/2026Energy Code Compliance InspectionsStephen Shishkoprogress
04/13/2026Fire-Resistant Penetrations and JointsStephen Shishkospecial
04/13/2026Lighting in dwelling unitsStephen Shishkoenergy_progress
03/25/2026FinalStephen Shishkoprogress
11/25/2025Fire-Resistant Penetrations and JointsHENRY TORRESspecial
09/29/2025FinalNAYYAREEN CHHAPRAprogress
06/17/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
06/17/2025Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
05/28/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
05/28/2025Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
02/28/2025FinalJOHN MCMONAGLEprogress
02/28/2025Lighting in dwelling unitsJOHN MCMONAGLEenergy_progress
02/28/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
02/28/2025Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
02/12/2025FinalJOHN MCMONAGLEprogress
02/12/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
02/12/2025Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
Latest 25 of 117.