Public elementary, junior or senior high
The Highbridge Green School
200 WEST 167 STREET · BIN 2117349
💬 Discuss this project
2011Year Built
4Stories
W1Building Class
R7-1Zoning
54,941 sfGross Floor Area
1Units
LL97 Covered4 Open Violations 2 unresolved · 2 paperwork only ▸
Public elementary, junior or senior high · Owner of record: NYC SCHOOL CONSTRUCTION AUTHORITY · 27,410 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Floor 3Under Construction23p · 2 filings · 20 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY103/22/2026
DEPARTMENT OF EDUCATION 0203/22/2026
DOE I.S. 285103/22/2026
DEPARTMENT OF EDUCATION203/22/2026
IANNELLI CONSTRUCTION203/22/2026
NEW YORK CITY SCHOOL CONSTRUCTION AUTHORITY103/22/2026
SCHOOL CONSTRUCTION AUTHORITY1703/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SYNERGY STRATEGIC DESIGN ARCHITECTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ABC CONSTRUCTION CONT INCGeneral Contractor304/09/2026
A & S ELECTRIC INC.Electrical103/22/2026
JOSHUA ANDERSONElectrical103/21/2026
EAGLE 1 MECHANICAL, INCFire Protection107/08/2026
FORSYTHE PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983608/11/2026
Building Lifecycle
All (86)Filed (9)Permit Issued (5)Violation (40)Inspection (2)Objection (15)Special Inspection (15)
08/25/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/13/2026
Objection resolved — Addressed
08/12/2026
Objection resolved — Addressed
08/12/2026
Special inspection requirement — Sprinkler Systems
Noel Tolentino
08/11/2026
Filed — Alteration
Relocate existing Sprinkler heads & extend existing piping as required. Provide New Sprinkler heads & extend existing piping as required.
X01247140-P2
08/11/2026
Filed — Alteration
Provide new Drinking Fountain with Bottle Filler and Associated Accessories & sanitary, vent, Cold water piping & Shutoff Valves. Reconnect New Plumbing to Existing.
X01262678-P2
08/11/2026
Objection raised — Other
08/11/2026
Objection raised — Other
03/31/2026
Violation issued (ECB, open)
Construction
03/31/2026
Violation issued (ECB, open)
Construction
03/26/2026
Objection raised — Other
03/23/2026
Filed — Alteration
Provide new Drinking Fountain with Bottle Filler and Associated Accessories & sanitary, vent, Cold water piping & Shutoff Valves. Reconnect New Plumbing to Existing.
X01262678-P1
03/19/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
03/18/2026
Filed — Alteration
Relocate existing Sprinkler heads & extend existing piping as required. Provide New Sprinkler heads & extend existing piping as required.
X01247140-P1
03/16/2026
Special inspection requirement — Lighting controls
Noel Tolentino
03/16/2026
Special inspection requirement — Interior lighting power
Noel Tolentino
03/16/2026
Special inspection requirement — Maintenance information
Noel Tolentino
03/16/2026
Special inspection requirement — Final
Noel Tolentino
03/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Noel Tolentino
03/16/2026
Special inspection requirement — Mechanical Systems
Noel Tolentino
12/22/2025
Permit issued — Plumbing
X01262678-S1-PL
11/25/2025
Permit issued — Sprinklers
X01247140-S2-EW-SP
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/20/2025
Permit issued — General Construction
X01262678-I1-GC
10/15/2025
Permit issued — Mechanical Systems
X01247140-S1-MS
10/15/2025
Permit issued — General Construction
X01247140-I1-GC
09/02/2025
Objection resolved — Addressed
08/26/2025
Objection resolved — Addressed
08/25/2025
Objection resolved — Addressed
08/21/2025
Objection resolved — Addressed
08/19/2025
Objection resolved — Addressed
08/08/2025
Objection raised — Other
08/08/2025
Objection raised — Admin
08/05/2025
Filed — Alteration
Provide new Drinking Fountain with Bottle Filler and Associated Accessories & sanitary, vent, Cold water piping & Shutoff Valves. Reconnect New Plumbing to Existing.
X01262678-S1
08/04/2025
Filed — Alteration
Provide new Drinking Fountain with Bottle Filler and Associated Accessories & sanitary, vent, Cold water piping & Shutoff Valves. Reconnect New Plumbing to Existing.
X01262678-I1
07/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Noel Tolentino
07/10/2025
Objection raised — Other
07/09/2025
Objection raised — Other
07/09/2025
Objection raised — Other
07/07/2025
Filed — Alteration
Relocate existing Sprinkler heads & extend existing piping as required. Provide New Sprinkler heads & extend existing piping as required.
X01247140-S1
07/07/2025
Filed — Alteration
Relocate existing Sprinkler heads & extend existing piping as required. Provide New Sprinkler heads & extend existing piping as required.
X01247140-S2
07/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Noel Tolentino
07/07/2025
Special inspection requirement — Interior lighting power
Noel Tolentino
07/07/2025
Special inspection requirement — Maintenance information
Noel Tolentino
07/07/2025
Special inspection requirement — Lighting controls
Noel Tolentino
07/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Noel Tolentino
07/03/2025
Filed — Alteration
Relocate existing Sprinkler heads & extend existing piping as required. Provide New Sprinkler heads & extend existing piping as required.
X01247140-I1
06/26/2025
Special inspection requirement — Mechanical Systems
Noel Tolentino
06/26/2025
Special inspection requirement — Final
Noel Tolentino
05/21/2025
Violation issued (ECB, closed)
Construction
05/21/2025
Violation issued (ECB, closed)
Construction
07/24/2024
Violation issued (ECB, closed)
Construction
07/24/2024
Violation issued (ECB, closed)
Construction
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/28/2023
Violation issued (ECB, closed)
Construction
03/28/2023
Violation issued (ECB, closed)
Construction
03/21/2022
Violation issued (ECB, closed)
Construction
03/04/2021
Violation issued (ECB, closed)
Construction
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedFORSYTHE PLBG & HTG CORP12/22/2025
DOB NOWSprinklersPermit IssuedEAGLE 1 MECHANICAL, INC11/25/2025
DOB NOWGeneral ConstructionPermit IssuedABC CONSTRUCTION CONT INC10/20/2025
DOB NOWMechanical SystemsPermit IssuedABC CONSTRUCTION CONT INC10/15/2025
DOB NOWGeneral ConstructionPermit IssuedABC CONSTRUCTION CONT INC10/15/2025
BISOTISSUEDNYCSCA04/21/2015
BIS—ISSUEDIANNELLI CONSTRUCTION CO03/19/2015
BIS—ISSUEDIANNELLI CONSTRUCTION CO10/10/2014
BIS—ISSUEDIANNELLI CONSTRUCTION CO02/06/2014
BISPLISSUEDFORSYTHE P&H CORP01/24/2014
BISPLISSUEDFORSYTHE P&H CORP01/24/2014
BISPLISSUEDFORSYTHE P&H CORP01/24/2014
BISOTISSUEDIANNELLI CONSTRUCTION CO08/26/2013
BIS—ISSUEDIANNELLI CONSTRUCTION CO08/14/2013
BISOTISSUEDIANNELLI CONSTRUCTION CO08/07/2013
BISOTISSUEDIANNELLI CONSTRUCTION CO08/07/2013
BISOTISSUEDIANNELLI CONSTRUCTION CO07/05/2013
BISOTISSUEDIANNELLI CONSTRUCTION CO07/05/2013
BISPLISSUEDFORSYTHE P&H CORP06/07/2013
BISFPISSUEDCHIEF FIRE PREV.& MECH CO05/30/2013
BISPLISSUEDFORSYTHE P&H CORP01/17/2013
BISPLISSUEDFORSYTHE P&H CORP01/17/2013
BISPLISSUEDFORSYTHE P&H CORP01/17/2013
BISOTISSUEDIANNELLI CONSTRUCTION CO12/18/2012
BISEQISSUEDIANNELLI CONSTRUCTION CO08/09/2012
BIS—ISSUEDIANNELLI CONSTRUCTION CO08/08/2012
BISEQISSUEDIANNELLI CONSTRUCTION CO08/08/2012
BISEQISSUEDDEL-SAVIO CONSTR. CORP04/04/2012
BISEQISSUEDIANNELLI CONSTRUCTION CO03/07/2012
BISEQISSUEDIANNELLI CONSTRUCTION CO03/07/2012
BISEQISSUEDDEL-SAVIO CONSTR. CORP03/07/2012
BIS—ISSUEDIANNELLI CONSTRUCTION CO01/19/2012
BISPLISSUEDFORSYTHE P&H CORP01/18/2012
BISPLISSUEDFORSYTHE P&H CORP01/18/2012
BISPLISSUEDFORSYTHE P&H CORP01/18/2012
BISEQISSUEDIANNELLI CONSTRUCTION CO03/17/2011
BISEQISSUEDIANNELLI CONSTRUCTION CO03/17/2011
BISEQISSUEDIANNELLI CONSTRUCTION CO03/17/2011
BISPLISSUEDFORSYTHE P&H CORP02/01/2011
BISPLISSUEDFORSYTHE P&H CORP02/01/2011
+ 6 more permits on file
1 project · most recent 08/11/2026
Others
FiledStatusContractorScope
08/11/2026Permit IssuedABC CONSTRUCTION CONT INCOthers
1 project · most recent 08/11/2026
FiledStatusContractorScope
08/11/2026Permit IssuedEAGLE 1 MECHANICAL, INC12 heads
2 projects · most recent 08/11/2026
Water/Sanitary
FiledStatusContractorScope
08/11/2026———
08/11/2026Permit IssuedFORSYTHE PLBG & HTG CORPWater/Sanitary
6 projects · most recent 12/01/2025
General Wiring Lighting
FiledStatusContractorScope
12/01/2025CompleteSTANCO SYSTEM ELEC'L CONTGeneral Wiring
11/25/2025Permit IssuedLVI NYC ELECTRICAL INCLighting
12/12/2024CompleteANCO ELECTL CONTCTNG INC—
05/10/2024CompleteANCO ELECTL CONTCTNG INC—
02/09/2022Permit IssuedA & S ELECTRIC INC.General Wiring
01/28/2022Permit IssuedA & S ELECTRIC INC.General Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/25/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/19/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
08/12/2026Sprinkler SystemsNoel Tolentinospecial
03/16/2026Lighting controlsNoel Tolentinoenergy_progress
03/16/2026Interior lighting powerNoel Tolentinoenergy_progress
03/16/2026Maintenance informationNoel Tolentinoenergy_progress
03/16/2026FinalNoel Tolentinoprogress
03/16/2026Energy Code Compliance InspectionsNoel Tolentinoprogress
03/16/2026Mechanical SystemsNoel Tolentinospecial
07/28/2025Fire-Resistant Penetrations and JointsNoel Tolentinospecial
07/07/2025Energy Code Compliance InspectionsNoel Tolentinoprogress
07/07/2025Interior lighting powerNoel Tolentinoenergy_progress
07/07/2025Maintenance informationNoel Tolentinoenergy_progress
07/07/2025Lighting controlsNoel Tolentinoenergy_progress
07/07/2025Fire-Resistant Penetrations and JointsNoel Tolentinospecial
06/26/2025Mechanical SystemsNoel Tolentinospecial
06/26/2025FinalNoel Tolentinoprogress
▾Documents — 69 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/19/2026X01247140-P1Request digital key ↗
08/19/2026X01247140-S2Request digital key ↗
08/19/2026X01247140-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits2
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
02/14/2024201025862Open ↗
07/06/2013201025862Open ↗
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature10
09/23/2026X01247140-S1Open ↗
09/23/2026X01247140-S1Open ↗
09/23/2026X01247140-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/19/2026X01247140-P2Open ↗
08/19/2026X01247140-P1Open ↗
08/19/2026X01247140-S2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026X01247140-S2Open ↗
09/23/2026X01247140-S1Open ↗
09/23/2026X01247140-S1Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs22
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)9
08/15/2026X01262678-P2Open ↗
08/14/2026X01247140-P2Open ↗
08/13/2026X01262678-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/15/2026X01262678-P2Open ↗
08/14/2026X01247140-P2Open ↗
08/13/2026X01262678-P1Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
07/17/2018201025862Open ↗
12/01/2017201025862Open ↗
08/24/2017201025862Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026X01262678-S1Open ↗
▸Filing & Intake Forms1
▸BISBOROUGH INTAKE FORM1
08/24/2017201025862Open ↗
▸Other Documents11
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal11
08/19/2026X01247140-S2Open ↗
08/17/2026X01262678-S1Open ↗
08/15/2026X01262678-P2Open ↗
Showing 3 of 11 on file for this type