204 2ND AVENUE
MANHATTAN · East Village · BIN 1006480
💬 Discuss this project
0Year Built
—Stories
U4Building Class
R8BZoning
0 sfGross Floor Area
0Units
0 Active ViolationsFISP: SAFE
Telephone utility · Owner of record: Verizon New York · 32,840 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsVerizon1 filing
RoofVerizon Communications LLC1p · 2 filings · 5 docs
Floor 12Verizon Communications LLC1 filing · 4 docs
Floor 11Verizon Communications LLC1 filing · 4 docs
Floor 10Verizon Communications LLC2p · 3 filings · 9 docs
Floor 9Tenth floor work and piping2 filings · 5 docs
Floor 8Verizon2p · 4 filings · 16 docs
Floor 7Verizon2 filings · 6 docs
Floor 6
Floor 5Verizon3p · 2 filings · 12 docs
Floor 4Sprinkler system modification2p · 2 filings · 5 docs
Floor 3Verizon1p · 2 filings · 6 docs
Floor 2Verizon2 filings · 6 docs
Floor 1Verizon4p · 7 filings · 15 docs
MezzanineVerizon Communications LLC1p · 1 filing · 4 docs
BasementVerizon6p · 1 filing · 6 docs
Sub-BasementVerizon3 filings · 12 docs
Site & exteriorVerizon4 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Verizon New York19707/08/2026
Bell Atlantic2103/21/2026
NY Telephone Co403/21/2026
Nynex403/21/2026
NY Telephone Realty203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Michael Rezk108/07/2025
Merritt Engineering Consultants206/24/2025
Rigid Structural Design101/10/2025
WFC Architects109/23/2024
C.E.C109/19/2024
Keri Engineering809/11/2024
Arthur R. Breue, P.E502/02/2022
FL&M Engineering Design & Inspection108/06/2021
Tohfaz Uddin PE110/22/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Hovann203/21/2026
Angela Rivera403/21/2026
KM Associates of New York1103/21/2026
Synergy Building Consultants103/21/2026
Rigid Structural Design203/21/2026
Green Studio203/21/2026
Merritt Engineering Consultant203/21/2026
K & M Associates1103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
James E FitzgeraldGeneral Contractor707/08/2026
Tishman InteriorsGeneral Contractor507/08/2026
Structure ToneGeneral Contractor507/08/2026
Spring ScaffoldingScaffold404/09/2026
Allan/Brite-Way Electrical CoElectrical303/22/2026
On-Trac Construction AssociatesGeneral Contractor303/21/2026
King Hoist & ScaffoldingScaffold203/21/2026
Carlitos ContractingScaffold204/09/2026
New York Plumbing-Heating-CoolingPlumbing107/08/2026
Stanco System Electrical ContElectrical103/21/2026
Star Electrical ContractorsElectrical103/21/2026
James F. Volpe ElectricalElectrical103/21/2026
Abco-Peerless SprinklerFire Protection107/08/2026
H.M. Hughes CoGeneral Contractor104/09/2026
Matrone AnthonyElectrical103/21/2026
Egg ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KZ Engineering4665103/17/2025
Crosscheck Inspection Services5441409/23/2024
Building Lifecycle
All (170)Filed (22)Permit Issued (24)Signed Off (16)Facade (FISP) (18)Violation (56)Objection (4)Special Inspection (30)
08/31/2026
Signed off — Alteration
Filing for the installation of NEW Steel dunnage on the 1st floor to support chiller.
M01098971-I1
08/11/2026
Signed off — Alteration
Filing for minor construction of concrete pads in support of 1st floor Chiller and 3rd Floor A/C Unit replacement.
M01094171-I1
08/10/2026
Signed off — Alteration
M01098964-I1
02/20/2026
Cycle 10 facade report submitted
02/20/2026
Cycle 10 facade report signed — SAFE
02/11/2026
Cycle 10 facade inspection completed
12/31/2025
Signed off — Alteration
M01259900-I1
12/11/2025
Signed off — Alteration
FACADE RESTORATION INCLUDING LINTEL AND FACE BRICK REPLACEMENT, STONE REPOINTING AND SEALANT REPLACEMENT AS PER PLANS SUBMITTED. NO CHANGE IN USE,OCCUPANCY OR EGRESS.
M01178812-I1
10/01/2025
Permit issued — Mechanical Systems
M01098964-I1-MS
09/11/2025
Permit issued — Suspended Scaffold
M01196238-I1-SC
08/07/2025
Filed — Alteration
M01259900-I1
08/07/2025
Permit issued — Sidewalk Shed
M01259900-I1-SH
07/08/2025
Permit issued — General Construction
M01178812-I1-GC
06/24/2025
Filed — Alteration
FACADE RESTORATION INCLUDING LINTEL AND FACE BRICK REPLACEMENT, STONE REPOINTING AND SEALANT REPLACEMENT AS PER PLANS SUBMITTED. NO CHANGE IN USE,OCCUPANCY OR EGRESS.
M01178812-I1
05/02/2025
Signed off — Alteration
Mechanical work related to the Replacement of the Rooftop Air Handling Unit
M00759889-I1
03/26/2025
Signed off — Alteration
M00539442-I1
03/25/2025
Signed off — Alteration
M00539441-I1
03/19/2025
Permit issued — Suspended Scaffold
M01196238-I1-SC
03/17/2025
Filed — Alteration
Installation of suspended scaffold for facade inspection/repair.
M01196238-I1
03/17/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
03/17/2025
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
02/10/2025
Special inspection requirement — Fenestration air leakage
Christopher Krepcio
02/10/2025
Special inspection requirement — Air barrier - visual inspection
Christopher Krepcio
02/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Christopher Krepcio
02/10/2025
Special inspection requirement — Final
Christopher Krepcio
01/13/2025
Permit issued — Supported Scaffold
M01162148-I1-SF
01/13/2025
Permit issued — Supported Scaffold
M01162148-I1-SH
01/10/2025
Filed — Alteration
M01162148-I1
11/15/2024
Permit issued — General Construction
M01094171-I1-GC
10/30/2024
Permit issued — Mechanical Systems
M01098964-I1-MS
10/17/2024
Permit issued — Structural
M01098971-I1-ST
09/25/2024
Objection raised — Admin
09/25/2024
Objection resolved — Addressed
09/25/2024
Objection raised — Scope
09/25/2024
Objection resolved — Addressed
09/23/2024
Filed — Alteration
Filing for minor construction of concrete pads in support of 1st floor Chiller and 3rd Floor A/C Unit replacement.
M01094171-I1
09/19/2024
Filed — Alteration
Filing for the installation of NEW Steel dunnage on the 1st floor to support chiller.
M01098971-I1
09/11/2024
Filed — Alteration
M01098964-I1
09/03/2024
Special inspection requirement — Structural Steel - High Strength Bolting
EUGENE BIFULCO
09/03/2024
Special inspection requirement — Structural Steel - Welding
EUGENE BIFULCO
09/03/2024
Special inspection requirement — Structural Steel - Details
EUGENE BIFULCO
08/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
EUGENE BIFULCO
08/20/2024
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
08/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
08/20/2024
Special inspection requirement — Final
EUGENE BIFULCO
08/12/2024
Special inspection requirement — Final
EUGENE BIFULCO
06/25/2024
Signed off — Alteration
DEMOLISH EXISTING PRESSURE REDUCING VALVES (PRV) IN THE STEAM ROOMS AND ALL ASSOCIATED PNEUMATIC PIPING. REPLACE WITH NEW ELECTRONIC PRVs. REPLACE EXISTING INSIDE SERVICE MOTORIZED VALVE AND ASSOCIATED AUTOMATIC SHUT OFF PANEL. BLANCE NEW EXHAUST FAN.
M08002103-I1
06/19/2024
Filed — Alteration
DEMOLISH EXISTING PRESSURE REDUCING VALVES (PRV) IN THE STEAM ROOMS AND ALL ASSOCIATED PNEUMATIC PIPING. REPLACE WITH NEW ELECTRONIC PRVs. REPLACE EXISTING INSIDE SERVICE MOTORIZED VALVE AND ASSOCIATED AUTOMATIC SHUT OFF PANEL. BLANCE NEW EXHAUST FAN.
M08002103-P1
06/11/2024
Special inspection requirement — High-Pressure Steam Piping (Welding)
EUGENE BIFULCO
06/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
06/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
06/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
06/11/2024
Special inspection requirement — Electrical motors and elevators
EUGENE BIFULCO
06/11/2024
Special inspection requirement — Maintenance information
EUGENE BIFULCO
06/11/2024
Special inspection requirement — Final
EUGENE BIFULCO
06/11/2024
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
06/11/2024
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
06/05/2024
Signed off — Alteration
Removal & Replacement of AC-14
M00900446-I1
06/03/2024
Signed off — Alteration
Modification to the existing Sprinkler System
M00397534-I1
04/01/2024
Signed off — Alteration
Install new water service, remove existing booster pumps with install of triple booster pump in conjunction with removal of existing water tanks on roof
M00349488-I1
Latest 60 of 170 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offStructure Tone10/01/2025
DOB NOWSuspended ScaffoldPermit IssuedH & H Restoration09/11/2025
DOB NOWSidewalk ShedSigned-offSpring Scaffolding08/07/2025
DOB NOWGeneral ConstructionSigned-offHM Hughes Co07/08/2025
DOB NOWSuspended ScaffoldPermit IssuedH & H Restoration03/19/2025
DOB NOWSupported ScaffoldPermit IssuedCarlitos Contracting01/13/2025
DOB NOWSupported ScaffoldPermit IssuedCarlitos Contracting01/13/2025
DOB NOWGeneral ConstructionSigned-offStructure Tone11/15/2024
DOB NOWMechanical SystemsSigned-offStructure Tone10/30/2024
DOB NOWStructuralSigned-offStructure Tone10/17/2024
DOB NOWMechanical SystemsSigned-offJames E Fitzgerald11/02/2023
DOB NOWMechanical SystemsSigned-offJames E Fitzgerald08/14/2023
DOB NOWMechanical SystemsSigned-offJames E Fitzgerald04/29/2023
DOB NOWMechanical SystemsSigned-offJames E Fitzgerald11/04/2022
DOB NOWMechanical SystemsSigned-offJames E Fitzgerald10/19/2022
DOB NOWMechanical SystemsSigned-offTishman Interiors02/10/2022
DOB NOWGeneral ConstructionSigned-offTishman Interiors02/10/2022
DOB NOWSidewalk ShedSigned-offSpring Scaffolding08/10/2021
DOB NOWGeneral ConstructionSigned-offOn-Trac Construction Associates07/23/2021
DOB NOWSprinklersSigned-offAbco-Peerless Sprinkler02/01/2021
DOB NOWMechanical SystemsSigned-offTishman Interiors09/22/2020
DOB NOWPlumbingSigned-offNew York Plumbing-Heating-Cooling07/02/2020
DOB NOWMechanical SystemsSigned-offTishman Interiors05/13/2020
DOB NOWSupported ScaffoldPermit IssuedKing Hoist & Scaffolding10/23/2019
BISOTISSUEDTishman Interiors10/16/2020
BISOTISSUEDTishman Interiors06/17/2020
BISOTISSUEDTulla Contracting01/28/2020
BISSPISSUEDPace Plumbing11/22/2019
BISMHISSUEDTishman Interiors09/30/2019
BISOTISSUEDTishman Interiors09/30/2019
BISSPISSUEDMackler Master Fire04/08/2019
BISOTRE-ISSUEDTishman Interiors10/03/2018
BISMHISSUEDTishman Interiors10/03/2018
BISOTRE-ISSUEDTishman Interiors09/12/2018
BISMHISSUEDTishman Interiors09/12/2018
BISMHRE-ISSUEDTishman Interiors10/13/2017
BISOTISSUEDTishman Interiors10/12/2017
BISOTISSUEDTishman Interiors10/12/2017
BISOTISSUEDSugrue Contracting05/10/2017
BISMHISSUEDSugrue Contracting05/03/2017
+ 34 more permits on file
9 projects · most recent 07/30/2025
General Wiring
FiledStatusContractorScope
07/30/2025CompleteTop Shelf Electric—
01/23/2025Permit IssuedSpice Electric Company—
02/08/2022Permit IssuedDiane ElectricGeneral Wiring
08/05/2021CompleteTop Shelf Electric—
07/29/2021CompleteJames F. Volpe ElectricalGeneral Wiring
04/20/2020Permit IssuedJames F. Volpe ElectricalGeneral Wiring
01/30/2020CompleteAllan/Brite-Way Electrical CoGeneral Wiring
01/29/2020CompleteFive Borough Electric—
01/18/2019CompleteAllan/Brite-Way Electrical Co—
1 project · most recent 09/19/2024
Steel
FiledStatusContractorScope
09/19/2024Signed-offStructure ToneSteel
1 project · most recent 10/22/2019
Scaffold
FiledStatusContractorScope
10/22/2019Permit IssuedKing Hoist & ScaffoldingScaffold
1 project · most recent 03/17/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
03/17/2025Permit IssuedH & H RestorationSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
03/17/2025Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
03/17/2025Post-installed AnchorsKarol Zdancewiczspecial
02/10/2025Fenestration air leakageChristopher Krepcioenergy_progress
02/10/2025Air barrier - visual inspectionChristopher Krepcioenergy_progress
02/10/2025Energy Code Compliance InspectionsChristopher Krepcioprogress
02/10/2025FinalChristopher Krepcioprogress
09/03/2024Structural Steel - High Strength BoltingEUGENE BIFULCOspecial
09/03/2024Structural Steel - WeldingEUGENE BIFULCOspecial
09/03/2024Structural Steel - DetailsEUGENE BIFULCOspecial
08/20/2024Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
08/20/2024Energy Code Compliance InspectionsEUGENE BIFULCOprogress
08/20/2024Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
08/20/2024FinalEUGENE BIFULCOprogress
08/12/2024FinalEUGENE BIFULCOprogress
06/11/2024High-Pressure Steam Piping (Welding)EUGENE BIFULCOspecial
06/11/2024HVAC-R and service water heating equipment—energy_progress
06/11/2024HVAC-R and service water heating system controls—energy_progress
06/11/2024HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
06/11/2024Electrical motors and elevatorsEUGENE BIFULCOenergy_progress
06/11/2024Maintenance informationEUGENE BIFULCOenergy_progress
06/11/2024FinalEUGENE BIFULCOprogress
06/11/2024Energy Code Compliance InspectionsEUGENE BIFULCOprogress
06/11/2024Mechanical SystemsEUGENE BIFULCOspecial
03/29/2024Energy Code Compliance InspectionsEUGENE BIFULCOprogress
03/29/2024Mechanical SystemsEUGENE BIFULCOspecial
Latest 25 of 50.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
VerizonTelecom siteEntire building
Project M01178812 Alteration · LOC Issued · 06/24/2025
Project M01094171 Alteration · LOC Issued · 09/23/2024
Project M01098964 Alteration · LOC Issued · 09/11/2024
Project M00900446 Alteration · LOC Issued · 08/07/2023
Project M08020470 Alteration · LOC Issued · 11/03/2022
Project M00759889 Alteration · LOC Issued · 10/28/2022
Project M08002103 Alteration · LOC Issued · 09/27/2022
Project M00447117 Alteration · LOC Issued · 02/10/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 734 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch17
09/03/2026M00569172-I1Request digital key ↗
09/02/2026M00539441-I1Request digital key ↗
09/02/2026M00539442-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00349488-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00329661-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/04/2026M00397534-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00247712-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00447117-I1Request digital key ↗
▸Applications & Permits157
▸BISPLAN / WORK APPROVAL APPLICATION81
03/06/2025121939395Open ↗
05/08/2023123192749Open ↗
04/20/2022123192749Open ↗
Showing 3 of 81 on file for this type
▸BISWORK PERMIT APPLICATION75
10/19/2020140898884Open ↗
06/17/2020140898884Open ↗
01/30/2020123699266Open ↗
Showing 3 of 75 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZONING EXHIBIT I: CERTIFICATION1
03/02/2018123210587Open ↗
▸Seals & Professional Certifications178
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION91
01/22/2020123699266Open ↗
04/11/2019122943832Open ↗
02/11/2019122943832Open ↗
Showing 3 of 91 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/04/2026M00397534-I1Open ↗
09/04/2026M00447117-I1Open ↗
09/03/2026M00569172-I1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST15
01/22/2020123699266Open ↗
Showing 1 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026M00900446-P1Open ↗
09/01/2026M00900446-P1Open ↗
08/31/2026M01178812-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
05/28/2020140898884Open ↗
01/22/2020123699266Open ↗
Showing 2 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/01/2026M00900446-P1Open ↗
09/01/2026M00397534-I1Open ↗
08/30/2026M01098971-I1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
05/28/2020140898884Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
05/28/2020140898884Open ↗
Showing 1 of 2 on file for this type
▸Trade Schedules & Equipment55
▸BISSCHEDULE B - PLUMBING14
07/27/2020123210587Open ↗
Showing 1 of 14 on file for this type
▸BISSELF-CERT PLUMBING NOTICE13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA9
05/30/2024123192749Open ↗
10/29/2020123192758Open ↗
06/26/2020123192767Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
09/04/2019123210587Open ↗
08/07/2019123210587Open ↗
01/25/2018123210587Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS3
01/16/2019123082029Open ↗
11/02/2017122900370Open ↗
07/26/2017122925157Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT3
01/16/2019123082029Open ↗
11/02/2017122900370Open ↗
07/26/2017122925157Open ↗
▸BISSIGN HANGER CERTIFICATE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-841
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFDNY-SPRINKLER LETTER OF NO OBJECTIONS FOR 13 CONTIGUOUS FLOORS1
11/19/2020123210587Open ↗
▸BISFDNY-SPRINKLER LETTER OF NOTIFICATION1
11/19/2020123210587Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos61
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
07/18/2020123192730Open ↗
07/02/2020123192767Open ↗
05/28/2020140898884Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
09/04/2026M00397534-I1Open ↗
09/04/2026M00447117-I1Open ↗
09/02/2026M00539441-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISASBESTOS INSPECTION REPORT9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)6
05/30/2024123192749Open ↗
10/29/2020123192758Open ↗
03/02/2018122662234Open ↗
Showing 3 of 6 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026M08002103-I1Open ↗
08/13/2026M00759889-I1Open ↗
▸Energy Compliance38
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS22
01/22/2020123699266Open ↗
01/15/2019123082029Open ↗
01/15/2019123082029Open ↗
Showing 3 of 22 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
10/27/2020140898884Open ↗
05/01/2020123210596Open ↗
01/15/2019123082029Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/01/2020123210596Open ↗
05/01/2020123210596Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00539442-I1Open ↗
08/13/2026M00447117-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/28/2020140898884Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00900446-I1Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY11
11/19/2020123210587Open ↗
11/12/2020123210587Open ↗
10/27/2020140898884Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs59
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST28
03/14/2025121939395Open ↗
03/12/2025121938252Open ↗
05/30/2024123192749Open ↗
Showing 3 of 28 on file for this type
▸BISADMINISTRATIVE OBJECTIONS19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
11/21/2018123210587Open ↗
02/12/2018122660343Open ↗
07/28/2017122925157Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
09/03/2026M00569172-I1Open ↗
08/13/2026M01162148-I1Open ↗
▸Cost, Insurance & Ownership69
▸BISCOST AFFIDAVIT62
10/29/2020123192758Open ↗
10/27/2020140898884Open ↗
07/02/2020123192767Open ↗
Showing 3 of 62 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
06/19/2024121939395Open ↗
06/19/2024121938252Open ↗
04/04/2024123192749Open ↗
Showing 3 of 4 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST3
06/11/2020140898884Open ↗
06/11/2020140898884Open ↗
Showing 2 of 3 on file for this type
▸Filing & Intake Forms75
▸BISEFILING COVER SHEET55
01/22/2020123699266Open ↗
01/26/2018123210596Open ↗
01/26/2018123210596Open ↗
Showing 3 of 55 on file for this type
▸BISBOROUGH INTAKE FORM10
10/02/2020140898884Open ↗
10/30/2019123192749Open ↗
08/07/2019123192767Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION8
09/08/2020123210587Open ↗
01/06/2020123210596Open ↗
09/04/2019123210587Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
05/28/2020140898884Open ↗
Showing 1 of 2 on file for this type
▸Other Documents4
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations1
08/13/2026M01196238-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01196238-I1Open ↗