| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| M01333788 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Permit Issued | 02/04/2026 | 08/20/2026 | Design BELLSEY & ASSOCIATES Owner Brookfield Properties Filer DVA Advisors | Structural work as shown on plans filed herewith. |
| M01332509 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Permit Issued | 01/28/2026 | 07/31/2026 | Design AKF ENGINEERS, LLP Owner Brookfield Properties Filer DVA Advisors | Structural work as shown on plans filed herewith. |
| M01389887 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Permit Issued | 05/01/2026 | 07/13/2026 | Design AKF ENGINEERS, LLP Owner Brookfield Properties Filer DVA Advisors | Sprinkler work as shown on plans filed herewith. |
| M01387849 ↗ | 250 VESEY STREET MANHATTAN | Alteration | Permit Issued | 04/24/2026 | 04/28/2026 | Design BELLSEY & ASSOCIATES Filer DVA Advisors | Structural work including new steel framing and support to new elevator rails and buffers at 1st floor, new elevator machines at 8th floor E… |
| M01331540 ↗ | 250 VESEY STREET MANHATTAN | Alteration | Permit Issued | 02/13/2026 | 03/09/2026 | — | Structural work in conjunction with 2nd floor core renovation |
| M01177377 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 02/20/2025 | 01/29/2026 | Filer GARO GUMUSYAN | AT 27TH FLOOR TENANT SPACE AND PUBLIC BATHROOMS, Removal of Existing Ductwork, Exhaust Grilles and Diffusers as per plans filed herewith. No… |
| Name | Jobs together | Most recent |
|---|---|---|
| BELLSEY & ASSOCIATES | 21 | 08/19/2026 |
| AKF ENGINEERS, LLP | 15 | 08/19/2026 |
| THORNTON TOMASETTI | 10 | 04/24/2026 |
| WB ENGINEERS & CONSULTANTS PLLC | 9 | 01/07/2026 |
| GARO GUMUSYAN | 8 | 07/15/2025 |
| PATTI & ANTHES CONSULTING ENGINEERS | 7 | 06/24/2025 |
| Spectorgroup Architecture LLP | 6 | 04/23/2024 |
| MG ENGINEERING D.P.C. | 5 | 12/11/2023 |
| JAROS BAUM & BOLLES | 4 | 03/12/2025 |
| COSENTINI ASSOCIATES | 3 | 07/05/2023 |
| HLW INTERNATIONAL | 3 | 01/07/2026 |
| M. CHETRIT CONSULTING ENGINEERS P.C | 3 | 05/28/2020 |
| MMOSER ASSOCIATES | 3 | 03/05/2024 |
| DESIMONE CONSULTING ENGINEERS | 2 | 11/15/2022 |
| HIGHLAND ASSOCIATES | 2 | 02/10/2025 |
| LORING CONSULTING ENGINEERS, INC. | 2 | 04/18/2023 |
| METHOD ARCHITECTS PLLC | 2 | 03/14/2025 |
| ROBERT DERECTOR ASSOCIATES | 2 | 01/09/2026 |
| SKIDMORE OWINGS & MERRILL LLP | 2 | 03/12/2025 |
| TPG ARCHITECTURE, LLP | 2 | 04/21/2025 |
| WSP | 2 | 02/27/2020 |
| AMA CONSULTING ENGINEERS, PC | 1 | 03/14/2025 |
| BARAK PLISKIN | 1 | 12/30/2025 |
| CALLISONRTKL ARCHITECTS, P.C. | 1 | 09/25/2023 |
| FOGARTY FINGER ARCHITECTURE PLLC | 1 | 01/31/2021 |
| Name | Jobs together | Most recent |
|---|---|---|
| AGGRESSIVE FIRE PROT LLC | 11 | 08/19/2026 |
| M&T PLBG AND HTG CO., INC | 6 | 08/19/2026 |
| ASHLAR MECHANICAL CORP | 2 | 01/07/2026 |
| M & S MECHANICAL SVCS INC | 2 | 05/01/2026 |
| PSI PARTNERS, LLC | 2 | 01/09/2026 |
| TURNER CONSTRUCTION COMPA | 2 | 12/08/2023 |
| DENKO MECHANICAL INC | 1 | 05/01/2026 |
| FRANKIE PLBG & HTG L.L.C | 1 | 10/23/2024 |
| PAR PLUMBING CO., INC | 1 | 04/21/2025 |
| WAGER CONTRACTING CO, INC | 1 | 03/15/2024 |
| Name | Jobs together | Most recent |
|---|---|---|
| BROOKFIELD PROPERTIES | 20 | 08/19/2026 |
| CBRE | 10 | 03/14/2025 |
| 1250 BROADWAY ASSOCIATES LLC | 8 | 07/15/2025 |
| 99 PARK AVENUE ASSOCIATES LP | 7 | 11/15/2022 |
| BROOKFIELD PROPERTIES OPERATED BY C | 4 | 01/07/2026 |
| 875 3RD AVENUE LLC | 3 | 06/01/2020 |
| Brookfield operated by CBRE | 1 | 07/21/2021 |
| Name | Jobs together | Most recent |
|---|---|---|
| WILLIAM VITACCO ASSOCIATES | 25 | 01/09/2026 |
| GARO GUMUSYAN | 8 | 06/24/2025 |
| DVA Advisors | 4 | 08/19/2026 |
| JAM CONSULTANTS, INC. | 4 | 04/18/2023 |
| GILLMAN CONSULTING INC | 2 | 11/24/2021 |
| LMS-ACE SERVICES | 2 | 11/15/2021 |
| SARO GUMUSYAN ARCHITECTURE | 2 | 07/15/2025 |
| EMPIRE CITY CONSULTANTS, INC. | 1 | 07/11/2024 |
| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| M01333788 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Permit Issued | 02/04/2026 | 08/20/2026 | Design BELLSEY & ASSOCIATES Owner Brookfield Properties Filer DVA Advisors | Structural work as shown on plans filed herewith. |
| M01332509 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Permit Issued | 01/28/2026 | 07/31/2026 | Design AKF ENGINEERS, LLP Owner Brookfield Properties Filer DVA Advisors | Structural work as shown on plans filed herewith. |
| M01389887 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Permit Issued | 05/01/2026 | 07/13/2026 | Design AKF ENGINEERS, LLP Owner Brookfield Properties Filer DVA Advisors | Sprinkler work as shown on plans filed herewith. |
| M01387849 ↗ | 250 VESEY STREET MANHATTAN | Alteration | Permit Issued | 04/24/2026 | 04/28/2026 | Design BELLSEY & ASSOCIATES Filer DVA Advisors | Structural work including new steel framing and support to new elevator rails and buffers at 1st floor, new elevator machines at 8th floor E… |
| M01331540 ↗ | 250 VESEY STREET MANHATTAN | Alteration | Permit Issued | 02/13/2026 | 03/09/2026 | — | Structural work in conjunction with 2nd floor core renovation |
| M01177377 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 02/20/2025 | 01/29/2026 | Filer GARO GUMUSYAN | AT 27TH FLOOR TENANT SPACE AND PUBLIC BATHROOMS, Removal of Existing Ductwork, Exhaust Grilles and Diffusers as per plans filed herewith. No… |
| M01238403 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 06/24/2025 | 01/29/2026 | Design GARO GUMUSYAN | AT 27TH FLOOR PUBLIC BATHROOMS, INSTALLATION OF INTERIOR PARTITIONS & FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR E… |
| M01238407 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 06/24/2025 | 01/29/2026 | Filer GARO GUMUSYAN | AT 27TH FLOOR PUBLIC BATHROOMS, Installation of Ductwork, Exhaust Grilles and Diffusers as per plans filed herewith. No change to use, occup… |
| M01326533 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Permit Issued | 01/08/2026 | 01/27/2026 | Design ROBERT DERECTOR ASSOCIATES Owner Brookfield Properties | Sprinkler work as shown on plans filed herewith. No change to use, egress or occupancy. |
| M01319204 ↗ | 225 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 01/06/2026 | 01/12/2026 | Sprinkler work as shown on plans filed herewith. No change to use, egress or occupancy. | |
| M01330903 ↗ | 250 VESEY STREET MANHATTAN | Alteration | Permit Issued | 12/30/2025 | 01/02/2026 | Design BARAK PLISKIN | General demolition as shown on plans. |
| M01276063 ↗ | 225 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 09/17/2025 | 09/29/2025 | Sprinkler work as shown on plans filed herewith. No change to use, egress or occupancy. | |
| M01139162 ↗ | 200 VESEY STREET MANHATTAN | Alteration | Signed-off | 03/12/2025 | 07/23/2025 | Design AMA CONSULTING ENGINEERS, PC Owner CBRE | Modifications to an existing sprinkler system |
| M01252373 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 07/15/2025 | 07/16/2025 | Design GARO GUMUSYAN | AT 26TH FLOOR SOUTH TENANT SPACE, REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE… |
| M01005763 ↗ | 1 WATER STREET MANHATTAN | Alteration | Permit Issued | 03/15/2024 | 06/20/2025 | Design SUPERSTRUCTURES ENG. + ARCH. | ONYP Parking Garage Restoration as per the plans filed including: Repair of spalled concrete column, slab, wall and ceiling at parking garag… |
| M01195280 ↗ | 225 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 04/18/2025 | 06/04/2025 | Sprinkler & Standpipe work as shown on plans filed herewith. No change to use, egress or occupancy. | |
| M01153919 ↗ | 2 MANHATTAN WEST MANHATTAN | Alteration | Signed-off | 03/06/2025 | 03/28/2025 | Design JAROS BAUM & BOLLES | Modifications to existing sprinkler system for 45C/46M floor common corridor. No change in use, egress or occupancy. |
| M01093266 ↗ | 225 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 09/16/2024 | 03/04/2025 | Design AKF ENGINEERS, LLP | structural work as shown on plans |
| M01163744 ↗ | 666 5 AVENUE MANHATTAN | Alteration | Signed-off | 02/10/2025 | 02/14/2025 | Design HIGHLAND ASSOCIATES | Structural work as shown on plans filed herewith. No change in use, egress of occupancy. |
| M01147165 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 12/10/2024 | 01/30/2025 | Filer GARO GUMUSYAN | AT 14TH FLOOR TENANT SPACE, MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRE… |
| M01119161 ↗ | 666 5 AVENUE MANHATTAN | Alteration | Signed-off | 10/23/2024 | 11/20/2024 | Design HIGHLAND ASSOCIATES | Sprinkler Removals, Temp loops as shown on plans filed herewith. No change in use, egress or occupancy. |
| M01125890 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 10/24/2024 | 10/28/2024 | Design GARO GUMUSYAN | AT 8-12TH FLOOR, INSTALLATION OF INTERIOR NON BEARING PARTITIONS, CEILING, AND FLOORING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRES… |
| M01125894 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 10/24/2024 | 10/28/2024 | Design GARO GUMUSYAN | AT 14TH FLOOR, INSTALLATION OF INTERIOR NON BEARING PARTITIONS, CEILING, AND FLOORING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS … |
| M01072557 ↗ | 1114 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 07/11/2024 | 07/17/2024 | Design BELLSEY & ASSOCIATES Owner BROOKFIELD PROPERTIES | Filing herewith Mechanical work in the Sub-Cellar and Cellar(Concourse Level) as per plans filed herewith. No change to use, egress or occup… |
| M00890915 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 01/10/2024 | 05/10/2024 | Design THORNTON TOMASETTI Owner Brookfield Properties | Structural work as shown on plans for new curtain wall at roof terrace. |
| M01003224 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 03/05/2024 | 03/14/2024 | Design MMOSER ASSOCIATES | Filing herewith for Interior renovation, proposing walls and a door for entryway. No change to use, egress or occupancy. |
| M00883454 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 07/05/2023 | 02/07/2024 | Design COSENTINI ASSOCIATES | Mechanical work as shown on plans. |
| M00883639 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 06/29/2023 | 02/07/2024 | Owner Brookfield Properties | General construction work as shown on plans (Base Building Lobby Work). |
| M00968884 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 12/06/2023 | 02/01/2024 | Design AKF ENGINEERS, LLP Owner Brookfield Properties | Plumbing work as shown on plans |
| M00907553 ↗ | 250 VESEY STREET MANHATTAN | Alteration | Signed-off | 09/25/2023 | 01/25/2024 | Design AKF ENGINEERS, LLP | Plumbing work as shown on plans (Floor 19 & 20 - Office Renovation). |
| M00204549 ↗ | 1 LIBERTY PLAZA MANHATTAN | Alteration | Signed-off | 08/23/2019 | 12/04/2023 | Design AKF ENGINEERS, LLP Owner BROOKFIELD PROPERTIES | Modify existing mechanical system work as shown on plans. No Change in use, egress, or occupancy. |
| M00931137 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Permit Issued | 09/28/2023 | 11/20/2023 | Design THORNTON TOMASETTI Owner Brookfield Properties | Structural work as shown on plans |
| M00648348 ↗ | 395 9TH AVENUE MANHATTAN | Alteration | Signed-off | 04/12/2022 | 11/17/2023 | Installation of interior partitions for public corridor and tenant separation. Application filed in conjunction with NB # 121187143. | |
| M00656987 ↗ | 395 9TH AVENUE MANHATTAN | Alteration | Signed-off | 03/21/2022 | 11/17/2023 | Design JAROS BAUM & BOLLES | Mechanical work as filed on plans herewith. No change in egress, use, or occupancy |
| M00817640 ↗ | 620 8 AVENUE MANHATTAN | Alteration | Signed-off | 03/17/2023 | 11/16/2023 | Design THORNTON TOMASETTI Owner BROOKFIELD PROPERTIES Filer JAM CONSULTANTS, INC. | STRUCTURAL WORK ASSOCIATED WITH BUILDING SHUTTLE ELEVATOR SHAFT AND BULKHEAD IN CONJUNCTION WITH M00817634-I1. |
| M00817647 ↗ | 620 8 AVENUE MANHATTAN | Alteration | Signed-off | 03/16/2023 | 11/16/2023 | Owner BROOKFIELD PROPERTIES Filer JAM CONSULTANTS, INC. | MECHANICAL MODIFICATIONS ASSOCIATED WITH BUILDING SHUTTLE ELEVATOR SHAFT AND BULKHEAD IN CONJUNCTION WITH M00817634. |
| M00838755 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 04/03/2023 | 11/16/2023 | Design BELLSEY & ASSOCIATES | General construction work as shown on plans |
| M00838764 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 04/03/2023 | 11/16/2023 | Design THORNTON TOMASETTI Owner Brookfield Properties | Structural work as shown on plans |
| M00839167 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 04/03/2023 | 11/16/2023 | Design AKF ENGINEERS, LLP Owner Brookfield Properties | Mechanical work as shown on plans. Demolition of distribution ductwork and piping as shown on design drawings for construction floors 33-4… |
| M00849407 ↗ | 620 8 AVENUE MANHATTAN | Alteration | Signed-off | 04/18/2023 | 11/16/2023 | — | INTERIOR NON-STRUCTURAL DEMOLITION ON FLOORS 26, 29, & 30; MINOR CONSTRUCTION ON FLOOR 26 FOR SHAFT ENCLOSURE. NO CHANGE IN USE, EGRESS, OR… |
| M00868300 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 05/31/2023 | 11/16/2023 | General construction work as shown on plans (Cadwalader, Wickersham & Taft LLP - Phase 1). | |
| M00868304 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 05/30/2023 | 11/16/2023 | Design COSENTINI ASSOCIATES | Mechanical work as shown on plans (Cadwalader, Wickersham & Taft LLP - Phase 1) |
| M00868361 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 05/30/2023 | 11/16/2023 | Design THORNTON TOMASETTI Owner Brookfield Properties | Structural work as shown on plans for new stair infill opening at 2nd floor (Cadwalader, Wickersham & Taft LLP - Phase 1). |
| M00817634 ↗ | 620 8 AVENUE MANHATTAN | Alteration | Signed-off | 03/16/2023 | 11/15/2023 | Owner BROOKFIELD PROPERTIES Filer JAM CONSULTANTS, INC. | GENERAL CONSTRUCTION TO BUILD SHUTTLE ELEVATOR SHAFT AND RELATED BULKHEAD AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPAN… |
| M00894081 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 08/17/2023 | 09/08/2023 | Design AKF ENGINEERS, LLP Owner Brookfield Properties | Sprinkler work associated with new bathrooms on floors 33-39 (34-40 marketing) as shown on plans. |
| M00683787 ↗ | 200 VESEY STREET MANHATTAN | Alteration | Signed-off | 03/17/2022 | 06/10/2023 | Owner CBRE | Mechanical work as shown on plans. (Former SEC Spaces). Floors 4, 20 (Construction)/21 (Marketing). |
| M00849419 ↗ | 620 8 AVENUE MANHATTAN | Alteration | Signed-off | 04/18/2023 | 04/24/2023 | Owner BROOKFIELD PROPERTIES Filer JAM CONSULTANTS, INC. | DEMOLITION OF MECHANICAL DUCT DISTRIBUTION AND RELATED PIPING, EQUIPMENT ON FLOORS 29 AND 30; CAP FOR FUTURE CONNECTIONS. |
| M00852815 ↗ | 620 8 AVENUE MANHATTAN | Alteration | Signed-off | 04/20/2023 | 04/21/2023 | Design THORNTON TOMASETTI | INTERIOR DEMO-- REMOVAL OF STEEL BEAMS FROM UNDERSIDE OF 30TH FLOOR IN CONJUNCTION WITH DEMOLITION/REMOVAL OF HD FILING SYSTEM UNDER M008494… |
| M08037382 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 11/28/2022 | 03/28/2023 | Design TPG ARCHITECTURE, LLP | AT 29th FLOOR TENANT SPACE, REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPAN… |
| M08037389 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 12/06/2022 | 03/28/2023 | Design MG ENGINEERING D.P.C. Filer GARO GUMUSYAN | AT 29th FLOOR TENANT SPACE, MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRE… |
| M08054699 ↗ | 395 9TH AVENUE MANHATTAN | Alteration | Signed-off | 03/03/2023 | 03/06/2023 | Design JAROS BAUM & BOLLES | Mechanical work as shown on plans. No change in egress, use, or occupancy |
| M08021809 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 11/15/2022 | 02/24/2023 | Filer GARO GUMUSYAN | AT 17TH FLOOR TENANT SPACE, INSTALLATION OF STEEL SUPPORT FOR KWIK WALL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS … |
| M08054675 ↗ | 395 9TH AVENUE MANHATTAN | Alteration | Signed-off | 02/21/2023 | 02/24/2023 | Design HLW INTERNATIONAL | General Construction work as shown on plans. No change in use, egress or occupancy. |
| M00676082 ↗ | 395 9TH AVENUE MANHATTAN | Alteration | Signed-off | 08/25/2022 | 01/05/2023 | Design JAROS BAUM & BOLLES | Mechanical work as filed on plans herewith. No change in egress, use, or occupancy |
| M00711210 ↗ | 250 VESEY STREET MANHATTAN | Alteration | Signed-off | 04/20/2022 | 11/18/2022 | Design AKF ENGINEERS, LLP | Mechanical work as shown on plans (Brookfield Building Office Relocation). |
| M00785817 ↗ | 200 VESEY STREET MANHATTAN | Alteration | Signed-off | 08/24/2022 | 11/18/2022 | Design BELLSEY & ASSOCIATES Owner CBRE | Interior renovation as shown on plans filed herewith. No change to use egress or occupancy. |
| M00676042 ↗ | 395 9TH AVENUE MANHATTAN | Alteration | Signed-off | 04/18/2022 | 11/17/2022 | Design HLW INTERNATIONAL | Interior renovation to include construction of new partitions and finishes as shown on plans. No change in use, egress or occupancy under t… |
| M00677645 ↗ | 250 VESEY STREET MANHATTAN | Alteration | Signed-off | 03/01/2022 | 11/17/2022 | Design AKF ENGINEERS, LLP | Mechanical work as shown on plans. Floors 4, 9, 10. |
| M00677675 ↗ | 250 VESEY STREET MANHATTAN | Alteration | Signed-off | 03/01/2022 | 11/17/2022 | Design BELLSEY & ASSOCIATES | General construction work to include non-structural demolition as shown on plans. Floors 4, 9 and 10. |
| M00710776 ↗ | 250 VESEY STREET MANHATTAN | Alteration | Signed-off | 04/21/2022 | 11/17/2022 | Design BELLSEY & ASSOCIATES | General Construction: General construction work as shown on plans (Brookfield Building Office Relocation). |
| M00774007 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 08/23/2022 | 11/17/2022 | Design GARO GUMUSYAN | AT 17TH FLOOR TENANT SPACE, INSTALLATION OF INTERIOR PARTITIONS AND FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF… |
| M00774010 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 08/23/2022 | 11/17/2022 | Filer GARO GUMUSYAN | AT 17TH FLOOR TENANT SPACE, MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRE… |
| M00785827 ↗ | 200 VESEY STREET MANHATTAN | Alteration | Signed-off | 08/24/2022 | 11/17/2022 | Owner CBRE | Mechanical work as shown on plans filed herewith. No change to use egress or occupancy. |
| M08015393 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 10/25/2022 | 11/17/2022 | Design BELLSEY & ASSOCIATES Owner Brookfield Properties | General Construction work as shown on plans filed herewith. No change in use, egress or occupancy. |
| M08015411 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 10/19/2022 | 11/17/2022 | Mechanical work as shown on plans filed herewith. No change in use, occupancy, or egress. | |
| M00784724 ↗ | 200 VESEY STREET MANHATTAN | Alteration | Signed-off | 08/17/2022 | 08/19/2022 | Design BELLSEY & ASSOCIATES | General Construction work as shown on plans. Floor 24 (construction)/25 (marketing). |
| M00784742 ↗ | 200 VESEY STREET MANHATTAN | Alteration | Signed-off | 08/12/2022 | 08/16/2022 | Owner CBRE | Mechanical work as shown on plans. Floor 24 (Construction)/25 (Marketing). |
| M00746750 ↗ | 225 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 06/29/2022 | 07/14/2022 | Design BELLSEY & ASSOCIATES | General construction work as shown on plans for restroom upgrades. Floor 40 (Construction)/41 (Marketing). |
| M00746758 ↗ | 225 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 06/27/2022 | 07/06/2022 | Design AKF ENGINEERS, LLP Owner BROOKFIELD PROPERTIES | Mechanical work as shown on plans for restrooms upgrade. Floor 40 (Construction)/41 (Marketing). |
| M00687912 ↗ | 200 VESEY STREET MANHATTAN | Alteration | Signed-off | 04/13/2022 | 04/21/2022 | Design BELLSEY & ASSOCIATES Owner CBRE | Interior renovation as shown on plans filed herewith. No change to use egress or occupancy. |
| M00687923 ↗ | 200 VESEY STREET MANHATTAN | Alteration | Signed-off | 04/11/2022 | 04/21/2022 | Owner CBRE | Modification of Mechanical work as shown on plans filed herewith. No change to use, egress, or occupancy. |
| M00683753 ↗ | 200 VESEY STREET MANHATTAN | Alteration | Signed-off | 03/22/2022 | 04/14/2022 | Design BELLSEY & ASSOCIATES Owner CBRE | General construction work as shown on plans. (Former SEC Spaces). Floors 4, 14-17 (Construction)/15-18 (Marketing), 20 (Construction)/21 (Ma… |
| M00683772 ↗ | 200 VESEY STREET MANHATTAN | Alteration | Permit Issued | 03/18/2022 | 04/14/2022 | Design THORNTON TOMASETTI Owner CBRE | Structural work as shown on plans. (Former SEC Spaces). Floors 4, 14-17 (Construction)/15-18 (Marketing), 20 (Construction)/21 (Marketing). |
| M00449476 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 01/22/2021 | 03/22/2022 | General construction work as shown on plans. | |
| M00626701 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 11/26/2021 | 01/27/2022 | Design COSENTINI ASSOCIATES | Mechanical work as shown on plans filed herewith. No change in use, egress or occupancy under this application. |
| M00627757 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 11/15/2021 | 01/03/2022 | Design GARO GUMUSYAN Filer LMS-ACE SERVICES | AT 14TH FLOOR TENANT SPACE, REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPAN… |
| M00627759 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 11/15/2021 | 01/03/2022 | AT 14TH FLOOR TENANT SPACE, MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRE… | |
| M00593362 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 11/24/2021 | 12/13/2021 | Design MMOSER ASSOCIATES Filer GILLMAN CONSULTING INC | Filing herewith south terrace work for the finish upgrades as per plans. No change to use, egress or occupancy. |
| M00626792 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 11/18/2021 | 11/23/2021 | Interior renovation to include new construction of new partitions and finishes as shown on plans. No change in use, egress or occupancy unde… | |
| M00528324 ↗ | 200 VESEY STREET MANHATTAN | Alteration | Signed-off | 08/05/2021 | 10/21/2021 | General construction work as shown on plans. 4th Floor Corridor Phase. | |
| M00583894 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 09/09/2021 | 10/21/2021 | Filer GARO GUMUSYAN | AT 4TH FLOOR SOUTH TENANT SPACE, MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF… |
| M00599502 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 10/08/2021 | 10/20/2021 | Design MMOSER ASSOCIATES Filer GILLMAN CONSULTING INC | Filing herewith for the construction of partitions and doors for the 9th & 10th floor stair bump out. Scope includes non-bearing partitions… |
| M00583885 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 09/09/2021 | 10/15/2021 | Design GARO GUMUSYAN Filer LMS-ACE SERVICES | AT 4TH FLOOR TENANT SPACE, INSTALLATION OF INTERIOR PARTITIONS AND FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF … |
| M00595469 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 09/28/2021 | 10/15/2021 | Design GARO GUMUSYAN | AT 4TH FLOOR PUBLIC BATHROOMS AND HALLWAYS, REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS AND FIXTURES AS PER PLANS FILED HEREWITH. NO CHA… |
| M00595472 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 09/28/2021 | 10/15/2021 | Filer GARO GUMUSYAN | AT 4TH FLOOR PUBLIC BATHROOMS AND HALLWAYS, MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY … |
| M00553319 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 08/03/2021 | 10/06/2021 | Mechanical work as shown on plans. Floor 27, 28 (Construction) / 28, 29 (Marketing). | |
| M00553245 ↗ | 200 LIBERTY STREET MANHATTAN | Alteration | Signed-off | 08/03/2021 | 08/04/2021 | Design BELLSEY & ASSOCIATES | General construction work as shown on plans. Floors 27, 28 (Construction)/28, 29 (Marketing). |
| M00503694 ↗ | 410 PARK AVENUE MANHATTAN | Alteration | Signed-off | 04/21/2021 | 05/13/2021 | Design METHOD ARCHITECTS PLLC | AT 6TH FLOOR SUITE #600, INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND HUNG CEILING AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANC… |
| M00450857 ↗ | 7 EAST 28 STREET MANHATTAN | Alteration | Signed-off | 01/31/2021 | 05/03/2021 | Interior general construction. | |
| M00450869 ↗ | 7 EAST 28 STREET MANHATTAN | Alteration | Signed-off | 02/11/2021 | 05/03/2021 | Structural installation of framing as shown on plans | |
| M00478683 ↗ | 1 LIBERTY PLAZA MANHATTAN | Alteration | Signed-off | 04/22/2021 | 04/24/2021 | Design BELLSEY & ASSOCIATES | Non-structural demolition and general construction of partial 27th floor and floors 47-52 as shown on plans. NO CHANGE IN USE, EGRESSOR OCCU… |
| M00479099 ↗ | 1 LIBERTY PLAZA MANHATTAN | Alteration | Signed-off | 04/21/2021 | 04/24/2021 | Design AKF ENGINEERS, LLP | Mechanical demolition for partial 27th floor and floors 47-52 as shown on plans |
| 123819127BIS | 1 LIBERTY PLAZA MANHATTAN | — | ISSUED | 12/02/2019 | 03/05/2021 | — | OT |
| 123909663BIS | 875 3 AVENUE MANHATTAN | — | ISSUED | 12/02/2020 | 12/02/2020 | — | OT |
| 123866021BIS | 250 VESEY STREET MANHATTAN | — | ISSUED | 03/04/2020 | 10/07/2020 | — | OT |
| M00328441 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 03/30/2020 | 08/03/2020 | Filer GARO GUMUSYAN | AT SUITE 1830, MODIFICATIONS TO EXISTING MECHANICAL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| 123654170BIS | 99 PARK AVENUE MANHATTAN | — | ISSUED | 07/22/2020 | 07/22/2020 | — | MH |
| 123654189BIS | 99 PARK AVENUE MANHATTAN | — | ISSUED | 07/22/2020 | 07/22/2020 | — | MH |
| 123720474BIS | 1240 BROADWAY MANHATTAN | — | ISSUED | 07/22/2020 | 07/22/2020 | — | MH |
| 123812482BIS | 99 PARK AVENUE MANHATTAN | — | ISSUED | 07/21/2020 | 07/21/2020 | — | MH |
| Building | Filings | Most Recent |
|---|---|---|
| 200 LIBERTY STREET ↗ | 76 | 08/21/2026 |
| 250 VESEY STREET ↗ | 26 | 07/08/2026 |
| 1240 BROADWAY ↗ | 23 | 07/08/2026 |
| 620 8 AVENUE ↗ | 18 | 07/08/2026 |
| 395 9TH AVENUE ↗ | 18 | 07/08/2026 |
| 200 VESEY STREET ↗ | 30 | 07/08/2026 |
| 7 EAST 28 STREET ↗ | 8 | 07/08/2026 |
| 99 PARK AVENUE ↗ | 27 | 07/08/2026 |
| 410 PARK AVENUE ↗ | 1 | 07/08/2026 |
| 875 3 AVENUE ↗ | 8 | 07/08/2026 |
| 225 LIBERTY STREET ↗ | 20 | 07/08/2026 |
| 1114 AVENUE OF THE AMER ↗ | 4 | 07/08/2026 |
| 666 5 AVENUE ↗ | 8 | 07/08/2026 |
| 2 MANHATTAN WEST ↗ | 2 | 04/09/2026 |
| 1 LIBERTY PLAZA ↗ | 3 | 04/09/2026 |
| 1 NORTH END AVENUE ↗ | 3 | 03/21/2026 |
| 1 WATER STREET ↗ | 3 | 03/21/2026 |