← Back
Elevator apt, semi-fireproof with stores
2043 WEBSTER AVENUE
BRONX · BIN 2817480
💬 Discuss this project
2024Year Built
7Stories
D7Building Class
R7-1Zoning
42,750 sfGross Floor Area
46Units
0 Open Violations
Elevator apt, semi-fireproof with stores · Owner of record: 2043 WEBSTER REALTY LLC · 7,500 sf lot · 5.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction5p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 73p · 1 filing · 20 docs
Floor 6179p · 1 filing · 20 docs
Floor 5183p · 2 filings · 20 docs
Floor 4179p · 1 filing · 20 docs
Floor 3179p · 1 filing · 20 docs
Floor 2184p · 2 filings · 20 docs
Floor 1Under Construction191p · 3 filings · 20 docs
CellarUnder Construction187p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY507/08/2026
GJUSHI CONSTRUCTION CO LLC2003/22/2026
SAKHAI BROS REALTY COR103/22/2026
2043-2047 WEBSTER AVE1603/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/15/2021$2.6M—2043-2047 WEBSTER AVE LLC → 2043 WEBSTER REALTY LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC403/21/2026
KC EXPEDITING INC303/21/2026
ALBA CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GJUSHI CONSTRUCTION CO LLGeneral Contractor3707/08/2026
AL ELECTRICAL GROUP INC 005120General Contractor503/22/2026
INFINITI ESC PLUMBING CORPlumbing307/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor107/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/22/2026
NY BUILDING ASSOCIATES INGeneral Contractor107/23/2026
GO PRO FIRE PROTECTION CFire Protection107/08/2026
AMERICAN STANDARD PLUMBING &Fire Protection107/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SQ. ARCH, LLC4802207/16/2026
NKM ENGINEERING PLLC6244107/16/2026
HUAN DESIGN INC7669107/16/2026
MASTROGIACOMO ENGINEERING4237806/26/2026
AMERICAN CONSTRUCTION TES9731306/26/2026
VIBRANALYSIS INC., DBA VT6864612/29/2025
BADALY ARCHITECT PLLC71371008/19/2024
Building Lifecycle
All (147)Filed (27)Permit Issued (32)Signed Off (7)Violation (17)Inspection (11)Objection (20)Special Inspection (30)Tax Incentive (3)
05/05/2027
421-a(16) construction completed
07/22/2026
Permit issued — General Construction
X01431772-I1-GC-CX
07/22/2026
Special inspection requirement — Subgrade Inspections
MICHAEL MASTROGIACOMO
07/22/2026
Special inspection requirement — Structural Steel - High Strength Bolting
EDWIN HOPKINS
07/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MICHAEL MASTROGIACOMO
07/22/2026
Special inspection requirement — Structural Steel - Welding
EDWIN HOPKINS
07/22/2026
Special inspection requirement — Structural Steel - Details
EDWIN HOPKINS
07/22/2026
Special inspection requirement — Concrete - Cast-In-Place
MICHAEL MASTROGIACOMO
07/22/2026
Special inspection requirement — Deep Foundation Elements
EDWIN HOPKINS
07/22/2026
Special inspection requirement — Mechanical Systems
MICHAEL MASTROGIACOMO
07/22/2026
Special inspection requirement — Chimneys and vents
MICHAEL MASTROGIACOMO
07/22/2026
Special inspection requirement — Masonry
EDWIN HOPKINS
07/22/2026
Special inspection requirement — Heating Systems
MICHAEL MASTROGIACOMO
07/22/2026
Special inspection requirement — Final
MICHAEL MASTROGIACOMO
07/22/2026
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL MASTROGIACOMO
07/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
MICHAEL MASTROGIACOMO
07/22/2026
Special inspection requirement — Footing and Foundation
MOHAMMAD BADALY
07/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
MICHAEL MASTROGIACOMO
07/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
MICHAEL MASTROGIACOMO
07/22/2026
Special inspection requirement — Insulation placement and R values
MICHAEL MASTROGIACOMO
07/22/2026
Special inspection requirement — Duct leakage testing, insulation and design
MICHAEL MASTROGIACOMO
07/22/2026
Special inspection requirement — Lighting controls
MICHAEL MASTROGIACOMO
07/22/2026
Special inspection requirement — Interior lighting power
MICHAEL MASTROGIACOMO
07/22/2026
Special inspection requirement — Shutoff dampers
MICHAEL MASTROGIACOMO
07/22/2026
Special inspection requirement — Fenestration air leakage
MICHAEL MASTROGIACOMO
07/22/2026
Special inspection requirement — Permanent certificate
MICHAEL MASTROGIACOMO
07/22/2026
Special inspection requirement — Ventilation and air distribution system
MICHAEL MASTROGIACOMO
07/22/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MICHAEL MASTROGIACOMO
07/22/2026
Special inspection requirement — Air barrier — testing
MICHAEL MASTROGIACOMO
07/22/2026
Special inspection requirement — Maintenance information
MICHAEL MASTROGIACOMO
07/22/2026
Special inspection requirement — Air barrier continuity plan testing
MICHAEL MASTROGIACOMO
07/22/2026
Special inspection requirement — Structural Cold-Formed Steel
EDWIN HOPKINS
07/21/2026
Permit issued — Plumbing
X01431772-S1-PL
07/21/2026
Permit issued — Plumbing
X01431772-S1-EW-SP
07/16/2026
Filed — Alteration
RENOVATION OF PROPOSED LAUNDROMAT ESTABLISHMENT WITH, REPAIR/NEW PARTITION, FLOOR, CEILING, DOOR, PAINTING, ALSO INSTALL DRYER EXHAUST AND SPLIT TYPE A/C AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01431772-I1
07/16/2026
Filed — Alteration
RENOVATION OF PROPOSED LAUNDROMAT ESTABLISHMENT WITH, REPAIR/NEW PARTITION, FLOOR, CEILING, DOOR, PAINTING, ALSO INSTALL DRYER EXHAUST AND SPLIT TYPE A/C AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01431772-S1
06/26/2026
Filed — New Building
PROPOSED NEW MIX-USED BUILDING
X00525964-A5
04/07/2026
Filed — New Building
PROPOSED NEW MIX-USED BUILDING
X00525964-A3
02/24/2026
Signed off — Alteration
Provide new sprinkler and plumbing system in conjunction with NB #X00525964
X00709081-I1
01/09/2026
Signed off — New Building
PROPOSED NEW MIX-USED BUILDING
X00525964-S3
01/06/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/29/2025
Filed — Alteration
Provide new sprinkler and plumbing system in conjunction with NB #X00525964
X00709081-P4
12/29/2025
Violation issued (ECB, closed)
Unknown
12/22/2025
Filed — Alteration
Provide new sprinkler and plumbing system in conjunction with NB #X00525964
X00709081-P3
12/22/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/17/2025
Signed off — New Building
PROPOSED NEW MIX-USED BUILDING
X00525964-S2
12/16/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/09/2025
Filed — Alteration
Provide new sprinkler and plumbing system in conjunction with NB #X00525964
X00709081-P2
12/08/2025
Permit issued — Sprinklers
X00709081-I1-PL
12/05/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
12/05/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/02/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/21/2025
Filed — Alteration
Provide new sprinkler and plumbing system in conjunction with NB #X00525964
X00709081-P1
09/12/2025
Signed off — Alteration
X00543275-I1
09/05/2025
Permit issued — Curb Cut
X00525964-S2-CC
09/04/2025
Permit issued — Structural
X00525964-I1-GC-CX
08/14/2025
Filed — New Building
PROPOSED NEW MIX-USED BUILDING
X00525964-P9
08/14/2025
Permit issued — Boiler Equipment
X00525964-S3-BE
07/09/2025
Violation issued (ECB, closed)
Construction
04/23/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 147 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNY BUILDING ASSOCIATES IN07/22/2026
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD P&H CORORP.07/21/2026
DOB NOWPlumbingPermit IssuedAMERICAN STANDARD PLUMBING &07/21/2026
DOB NOWSprinklersSigned-offINFINITI ESC PLUMBING COR12/08/2025
DOB NOWCurb CutSigned-offGJUSHI CONSTRUCTION CO LL09/05/2025
DOB NOWStructuralPermit IssuedGJUSHI CONSTRUCTION CO LL09/04/2025
DOB NOWBoiler EquipmentSigned-offINFINITI ESC PLUMBING COR08/14/2025
DOB NOWGeneral ConstructionPermit IssuedGJUSHI CONSTRUCTION CO LL02/21/2025
DOB NOWConstruction FenceSigned-offGJUSHI CONSTRUCTION CO LL02/20/2025
DOB NOWSprinklersSigned-offGO PRO FIRE PROTECTION C11/14/2024
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR10/22/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC09/09/2024
DOB NOWGeneral ConstructionPermit IssuedGJUSHI CONSTRUCTION CO LL09/06/2024
DOB NOWConstruction FenceSigned-offGJUSHI CONSTRUCTION CO LL09/04/2024
DOB NOWGeneral ConstructionPermit IssuedGJUSHI CONSTRUCTION CO LL02/13/2024
DOB NOWSupport of ExcavationSigned-offGJUSHI CONSTRUCTION CO LL02/12/2024
DOB NOWSupport of ExcavationSigned-offGJUSHI CONSTRUCTION CO LL02/12/2024
DOB NOWConstruction FenceSigned-offGJUSHI CONSTRUCTION CO LL02/12/2024
DOB NOWMechanical SystemsPermit IssuedGJUSHI CONSTRUCTION CO LL01/24/2024
DOB NOWSupport of ExcavationSigned-offGJUSHI CONSTRUCTION CO LL10/31/2023
DOB NOWStructuralPermit IssuedGJUSHI CONSTRUCTION CO LL10/03/2023
DOB NOWConstruction FenceSigned-offGJUSHI CONSTRUCTION CO LL03/28/2023
DOB NOWSupport of ExcavationSigned-offGJUSHI CONSTRUCTION CO LL03/28/2023
DOB NOWFoundationPermit IssuedGJUSHI CONSTRUCTION CO LL03/17/2023
DOB NOWStructuralPermit IssuedGJUSHI CONSTRUCTION CO LL01/04/2023
DOB NOWGeneral ConstructionPermit IssuedGJUSHI CONSTRUCTION CO LL07/06/2022
DOB NOWFoundationPermit IssuedGJUSHI CONSTRUCTION CO LL06/29/2022
DOB NOWSupport of ExcavationSigned-offGJUSHI CONSTRUCTION CO LL05/26/2022
DOB NOWConstruction FenceSigned-offGJUSHI CONSTRUCTION CO LL05/25/2022
DOB NOWMechanical SystemsPermit IssuedGJUSHI CONSTRUCTION CO LL05/23/2022
DOB NOWConstruction FenceSigned-offGJUSHI CONSTRUCTION CO LL07/23/2021
DOB NOWConstruction FenceSigned-offGJUSHI CONSTRUCTION CO LL06/23/2021
BIS—ISSUEDPROGRAM UNLIMITED PLUMBING & HTG08/14/1997
2 projects · most recent 07/16/2026
Air Conditioning Systems Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/16/2026Permit IssuedNY BUILDING ASSOCIATES INAir Conditioning Systems—
06/26/2026Signed-offGJUSHI CONSTRUCTION CO LLAir Conditioning Systems, Associated Ducts and Piping, Ventilation Systems
Cooling
Trane T4WCC4060E1000A 22,000 BTU · Condensing Unit ×3
Heating
Trane T4WCC4060E1000A 22,000 BTU ×3
Ventilation
Duravent 1104-0800-0001 800 CFM ×42
Ducts & Piping
__Junk__ 17002512H 800 CFM · Ductwork ×36
1 project · most recent 07/16/2026
Sprinkler System
FiledStatusContractorScope
07/16/2026Permit IssuedAMERICAN STANDARD PLUMBINSprinkler System
1 project · most recent 07/16/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/16/2026Permit IssuedAMERICAN STANDARD P&H CORGas, Water/Sanitary
8 projects · most recent 09/22/2026
General Wiring
FiledStatusContractorScope
09/22/2026Permit IssuedGALAXY ELECTRIC CORPGeneral Wiring
07/29/2026Permit IssuedGALAXY ELECTRIC CORPGeneral Wiring
05/19/2026CompleteAL ELECTRICAL GROUP INC1 meters, 1 new_meters
03/17/2026CompleteJAM ELECTRICAL CORP—
02/13/2026CompleteAL ELECTRICAL GROUP INCGeneral Wiring
02/11/2026CompleteAL ELECTRICAL GROUP INC—
08/28/2024CompleteILLUMINOUS ELECTRIC CORP.—
11/19/2020Permit IssuedHECMAR ELECTRIC1 meters, 1 new_meters
1 project · most recent 06/26/2026
Steel Masonry
FiledStatusContractorScope
06/26/2026Signed-offGJUSHI CONSTRUCTION CO LLSteel, Masonry
1 project · most recent 01/10/2019
Fence
FiledStatusContractorScope
01/10/2019——Fence
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
01/06/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/22/2025Pass-Final Boiler Equipment InspectionPassView ↗
12/16/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
12/05/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
12/05/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/02/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/23/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/23/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/30/2025Pass-Final House ConnectionPassView ↗
11/01/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/01/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/22/2026FinalMICHAEL MASTROGIACOMOprogress
07/22/2026HVAC-R and service water heating equipmentMICHAEL MASTROGIACOMOenergy_progress
07/22/2026Fenestration air leakageMICHAEL MASTROGIACOMOenergy_progress
07/22/2026Structural Steel - High Strength BoltingEDWIN HOPKINSspecial
07/22/2026Energy Code Compliance InspectionsMICHAEL MASTROGIACOMOprogress
07/22/2026Heating SystemsMICHAEL MASTROGIACOMOspecial
07/22/2026Structural Cold-Formed SteelEDWIN HOPKINSspecial
07/22/2026Lighting in dwelling unitsMICHAEL MASTROGIACOMOenergy_progress
07/22/2026Interior lighting powerMICHAEL MASTROGIACOMOenergy_progress
07/22/2026Air barrier - visual inspectionMICHAEL MASTROGIACOMOenergy_progress
07/22/2026Exterior lighting powerMICHAEL MASTROGIACOMOenergy_progress
07/22/2026Chimneys and ventsMICHAEL MASTROGIACOMOspecial
07/22/2026Air barrier — testing MICHAEL MASTROGIACOMOenergy_progress
07/22/2026Shutoff dampersMICHAEL MASTROGIACOMOenergy_progress
07/22/2026Fire-Resistant Penetrations and JointsMICHAEL MASTROGIACOMOspecial
07/22/2026Subgrade InspectionsMICHAEL MASTROGIACOMOspecial
07/22/2026MasonryEDWIN HOPKINSspecial
07/22/2026Structural Steel - DetailsEDWIN HOPKINSspecial
07/22/2026Permanent certificateMICHAEL MASTROGIACOMOenergy_progress
07/22/2026Lighting controlsMICHAEL MASTROGIACOMOenergy_progress
07/22/2026Fenestration areasMICHAEL MASTROGIACOMOenergy_progress
07/22/2026Fenestration and door U-factor and product ratingsMICHAEL MASTROGIACOMOenergy_progress
07/22/2026HVAC-R and service water piping design and insulationMICHAEL MASTROGIACOMOenergy_progress
07/22/2026Mechanical SystemsMICHAEL MASTROGIACOMOspecial
07/22/2026Fire-Resistance Rated ConstructionMICHAEL MASTROGIACOMOprogress
Latest 25 of 150.
▾Documents — 302 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch27
08/26/2026X00078869-I1Request digital key ↗
08/26/2026X00078834-I1Request digital key ↗
08/25/2026X00543275-I1Request digital key ↗
Showing 3 of 27 on file for this type
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION11
09/22/2025240229784Open ↗
09/22/2025220657288Open ↗
11/23/2020210178109Open ↗
Showing 3 of 11 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
08/22/2024240335712Open ↗
▸Zoning, Tax Lot & Property Records26
▸DOB NOWZD1: DOB Zoning Diagram10
08/18/2026X00525964-A3Open ↗
08/18/2026X00525964-A5Open ↗
08/18/2026X00525964-P8Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWZoning Exhibit form (1-5)10
08/18/2026X00525964-A3Open ↗
08/18/2026X00525964-A5Open ↗
08/18/2026X00525964-P8Open ↗
Showing 3 of 10 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/11/2018210178109Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
07/10/2018210178109Open ↗
▸BISZONING DIAGRAM1
10/11/2018210178109Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
10/11/2018210178109Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
07/10/2018210178109Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications132
▸DOB NOWSpecial Inspector Seal & Signature72
09/27/2026X01431772-S1Open ↗
09/27/2026X01431772-S1Open ↗
09/23/2026X00525964-S3Open ↗
Showing 3 of 72 on file for this type
▸DOB NOWProgress Inspector Seal & Signature30
09/27/2026X01431772-S1Open ↗
09/27/2026X01431772-S1Open ↗
09/23/2026X00525964-S3Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
08/26/2026X00078869-I1Open ↗
08/26/2026X00078834-I1Open ↗
08/25/2026X00543275-I1Open ↗
Showing 3 of 27 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
09/08/2022240335712Open ↗
08/01/2018240225243Open ↗
07/26/2018240229784Open ↗
▸Trade Schedules & Equipment11
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)9
08/18/2026X00525964-A3Open ↗
08/18/2026X00525964-P7Open ↗
08/18/2026X00525964-I1Open ↗
Showing 3 of 9 on file for this type
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
11/01/2018210178109Open ↗
▸BISSCHEDULE B - PLUMBING1
07/26/2018240229784Open ↗
▸Safety & Tenant Protection18
▸DOB NOWStreet Tree Checklist10
08/18/2026X00525964-A5Open ↗
08/18/2026X00525964-P8Open ↗
08/18/2026X00525964-I1Open ↗
Showing 3 of 10 on file for this type
▸BISSTREET TREE CHECKLIST3
08/22/2024240335712Open ↗
10/11/2018210178109Open ↗
07/10/2018210178109Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
10/11/2018210178109Open ↗
▸BISBPP: STREET TREES SITE PLAN1
08/09/2024240335712Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos1
▸DOB NOWOER: Notice to Proceed1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
10/11/2018210178109Open ↗
10/11/2018210178109Open ↗
10/11/2018210178109Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY9
10/11/2018210178109Open ↗
10/11/2018210178109Open ↗
10/11/2018210178109Open ↗
Showing 3 of 9 on file for this type
▸BISSOIL REPORT1
10/11/2018210178109Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
10/11/2018210178109Open ↗
▸DOB NOWTR5: Special Inspection Progress Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR5 Test Report1
08/18/2026X00525964-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/11/2018210178109Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
10/15/2018210178109Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT2
07/26/2018240229784Open ↗
07/05/2018220657288Open ↗
▸DOB NOWCertificate of Insurance1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCertification by Insurance Broker or Agency1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms16
▸BISADDITIONAL INFORMATION9
08/22/2024240335712Open ↗
08/22/2024240335712Open ↗
11/01/2018210178109Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET3
07/05/2018220657288Open ↗
06/28/2018210178109Open ↗
05/23/2018210178109Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
09/08/2022240335712Open ↗
08/01/2018240225243Open ↗
07/26/2018240229784Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/22/2024240335712Open ↗
▸Other Documents31
▸DOB NOWSite Survey: Initial10
08/18/2026X00525964-A3Open ↗
08/18/2026X00525964-P8Open ↗
08/18/2026X00525964-P7Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone10
08/18/2026X00525964-P8Open ↗
08/18/2026X00525964-P2Open ↗
08/18/2026X00525964-A3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWWaiver Document3
08/18/2026X00525964-A3Open ↗
08/18/2026X00525964-A5Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWFinal Survey2
08/18/2026X00525964-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWAdjoining Owners Notification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM1
07/10/2018210178109Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
08/16/2024240335712Open ↗
▸DOB NOWProperty Ownership Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdditional Insured Authorizations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type