| Owner | Filings | Most Recent |
|---|---|---|
| 205 Third Avenue Owner's | 97 | 03/21/2026 |
| 205 Third | 8 | 03/21/2026 |
| 205 3 AVE | 3 | 03/22/2026 |
| C. Wall Architecture | 2 | 03/21/2026 |
| Owners Association | 2 | 03/21/2026 |
| Quantum Design | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| Pebble Studio Design | 2 | 07/17/2026 |
| Javier Fuentes Architecture | 2 | 07/14/2026 |
| Bianca V. Skvirsky, PE | 2 | 06/09/2026 |
| De la Garza Architecture | 1 | 04/09/2026 |
| Cheung Showman Architects | 1 | 04/09/2026 |
| Ilya Chistiakov Architect | 2 | 01/15/2026 |
| Ashraf | 6 | 12/15/2025 |
| Merritt Engineering Consultants | 2 | 12/10/2025 |
| Northline Architects | 1 | 11/05/2025 |
| Zheng & Associates | 2 | 10/24/2025 |
| FPM Group | 1 | 06/01/2025 |
| Jacob Bekermus Architect | 1 | 04/21/2025 |
| Xiaopeng Wang Design | 1 | 01/13/2025 |
| Matiz Architecture and Design | 2 | 03/19/2024 |
| Rad Design & Architecture | 1 | 03/19/2024 |
| Robert Germain Jr. PE | 6 | 01/19/2024 |
| Matthew Ruopoli, AIA | 8 | 12/01/2023 |
| Boschen Design Architecture | 2 | 11/10/2023 |
| Mar Architecture & Engineering | 1 | 02/05/2023 |
| Jane Kim Design | 3 | 11/29/2022 |
| Arnold Montag Architect AM/PM Desi | 3 | 11/14/2022 |
| Studio SFW Design Architecture | 2 | 10/26/2022 |
| Michael Gray Architect | 1 | 08/02/2022 |
| AM Architect's Studio | 1 | 07/21/2022 |
| Avid Designs | 1 | 01/27/2022 |
| @Studio NY | 2 | 09/02/2021 |
| Enthink Engineers | 2 | 04/22/2021 |
| KZ Engineering | 1 | 01/07/2020 |
| O'Donnell Architects | 1 | 12/13/2019 |
| Haider Engineering, P.E | 1 | 06/13/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| Paul Fusco Consulting | 10 | 03/21/2026 |
| EC Building Consultants | 4 | 03/21/2026 |
| Merritt Engineering Consultant | 4 | 03/21/2026 |
| Synergy Building Consultants | 3 | 03/21/2026 |
| J Callahan Consulting | 4 | 03/21/2026 |
| Quick Filing of NY | 1 | 03/21/2026 |
| Boschen Design, Architecture | 2 | 03/21/2026 |
| Mar Architecture Engineering | 2 | 03/21/2026 |
| Expedition NYC | 1 | 03/21/2026 |
| CCBS Consultants | 6 | 03/21/2026 |
| Socotec | 4 | 03/21/2026 |
| Clarke Construction Consultants | 3 | 03/21/2026 |
| Nexus Consulting NYC | 2 | 03/21/2026 |
| AM PM Design Consulting P | 2 | 03/21/2026 |
| S M Expediting | 2 | 03/21/2026 |
| Na & Partners Building Consultants | 2 | 03/21/2026 |
| SNR Expediting Design | 2 | 03/21/2026 |
| Quick Filing | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Ceprine Construction | Scaffold | 9 | 03/21/2026 |
| Dynamix Scaffold Group | Scaffold | 7 | 09/22/2026 |
| Lekos Contracting | General Contractor | 6 | 03/21/2026 |
| C C Controlled Combustion | General Contractor | 4 | 03/21/2026 |
| Reliable Enterprises | Scaffold | 4 | 07/08/2026 |
| Moonk Enterprise | General Contractor | 4 | 03/21/2026 |
| Emelec Electric | Electrical | 4 | 03/22/2026 |
| Morell Builders | General Contractor | 3 | 03/21/2026 |
| Park Slope Painting Services | specialty_contractor | 3 | 03/21/2026 |
| BNJ Construction | General Contractor | 3 | 03/21/2026 |
| Contracting NYC | General Contractor | 3 | 03/21/2026 |
| Brenmac | Scaffold | 3 | 03/21/2026 |
| East Enders NYC | General Contractor | 3 | 03/21/2026 |
| US1 Electric | Electrical | 3 | 03/22/2026 |
| Klein Kitchen | General Contractor | 3 | 03/21/2026 |
| Northwood Interior | General Contractor | 3 | 03/21/2026 |
| E.L. Contracting | General Contractor | 2 | 03/21/2026 |
| Royal Electrical Contracting | Electrical | 2 | 03/21/2026 |
| Cape Plumbing | Plumbing | 2 | 08/26/2026 |
| AM Building Restoration* | General Contractor | 2 | 06/27/2026 |
| CK Plumbing & Mechanical | Plumbing | 2 | 07/08/2026 |
| Asko Electric Construction & Maintenance | Electrical | 2 | 03/22/2026 |
| Gotham Wiring Licensed | Electrical | 2 | 03/22/2026 |
| James Simpson & Son | Plumbing | 2 | 07/08/2026 |
| Angelos's Home Improvemen | General Contractor | 2 | 03/21/2026 |
| Cobra Kitchen Ventilation | Scaffold | 2 | 03/21/2026 |
| Neptune Signs & Awnings | Sign hanger | 2 | 09/01/2026 |
| Brosna Construction | General Contractor | 2 | 03/21/2026 |
| Plumbing Plumbing & Plumbing | Plumbing | 2 | 10/04/2026 |
| Tomak Group | General Contractor | 1 | 10/04/2026 |
| Top Notch Remodeling | General Contractor | 1 | 07/08/2026 |
| Webb Development Service | General Contractor | 1 | 04/09/2026 |
| A.M.N | Plumbing | 1 | 07/08/2026 |
| AP Plumbing & HVAC | Plumbing | 1 | 07/08/2026 |
| Arcon Plumbing Solutions | Plumbing | 1 | 07/08/2026 |
| Authentic Plumbing | Plumbing | 1 | 07/08/2026 |
| CC Controlled Plumbing Co | Plumbing | 1 | 07/08/2026 |
| Crown Plumbing | Plumbing | 1 | 07/08/2026 |
| Hudson Plumbing & MCH | Plumbing | 1 | 07/08/2026 |
| Master 2 Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Rite Way Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Water Dynamic P & H | Plumbing | 1 | 09/16/2026 |
| All City Electrical | Electrical | 1 | 03/22/2026 |
| XH&RC Plumbing and Heating | Plumbing | 1 | 07/08/2026 |
| Diaz Electric of New York | Electrical | 1 | 03/21/2026 |
| Argon Electrical | Electrical | 1 | 03/22/2026 |
| Electric Empire | Electrical | 1 | 03/21/2026 |
| Bayside Electrical Cont | Electrical | 1 | 03/22/2026 |
| Phasor Electric Co | Electrical | 1 | 03/21/2026 |
| Diaz Ana | Electrical | 1 | 03/21/2026 |
| Interstate Electric | Electrical | 1 | 03/21/2026 |
| Lina Electric | Electrical | 1 | 03/21/2026 |
| Eric & NG Electrical | Electrical | 1 | 03/22/2026 |
| Kwong Ming Electric | Electrical | 1 | 03/22/2026 |
| Power Surge Electric | Electrical | 1 | 03/21/2026 |
| Mikoma Electric | Electrical | 1 | 03/21/2026 |
| Paul M. & Son's Electrical Con | Electrical | 1 | 03/22/2026 |
| BLH Elect'l Contractors | Electrical | 1 | 03/21/2026 |
| Silverman Robert | Electrical | 1 | 03/21/2026 |
| Solas Electrical | Electrical | 1 | 03/22/2026 |
| The Metro Group Electric | Electrical | 1 | 03/22/2026 |
| Alexandra's Interiors | General Contractor | 1 | 07/08/2026 |
| Andiamo Painting | specialty_contractor | 1 | 07/08/2026 |
| Cooper Works | General Contractor | 1 | 08/05/2026 |
| Euro Restoration | specialty_contractor | 1 | 07/08/2026 |
| Jimenezcorp | General Contractor | 1 | 09/15/2026 |
| KSW Mechanical | specialty_contractor | 1 | 04/09/2026 |
| Monumental Remodeling | General Contractor | 1 | 07/08/2026 |
| Plumbing Plumbing Plumbing | General Contractor | 1 | 03/21/2026 |
| Prestigiacomo Peter | General Contractor | 1 | 03/21/2026 |
| RD Home Construction | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Pebble Studio Design | 8525 | 1 | 07/17/2026 |
| Sag Engineering & Consulting | 608 | 2 | 07/14/2026 |
| Jose M. Landauro | 3500 | 2 | 04/09/2026 |
| Zheng & Associates | 7330 | 2 | 10/24/2025 |
| Socotec Engineering | 4983 | 1 | 06/01/2025 |
| Rad Design & Architecture | 2082 | 1 | 03/19/2024 |
| Robert F. Germain Jr. PE | 5100 | 6 | 01/19/2024 |
| Doyun Kim; RA | 7415 | 2 | 12/01/2023 |
| Boschen Design, Architect | 2477 | 1 | 11/10/2023 |
| Arnold Montag Architect | 4599 | 2 | 11/14/2022 |
| Macia Inspection & Testin | 402 | 2 | 11/14/2022 |
| Ace Structural Engineering | 496 | 1 | 10/26/2022 |
| AM Design Studio | 4413 | 1 | 07/21/2022 |
| LL Engineering | 1618 | 1 | 05/05/2022 |
| Special Inspection Services | 1200 | 1 | 09/02/2021 |
| Metrospec Sia | 6420 | 2 | 11/04/2020 |
| O'Donnell Architects | 2784 | 1 | 12/13/2019 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Supported Scaffold | Permit Issued | Dynamix Scaffold Group | 09/21/2026 |
| DOB NOW | Plumbing | Permit Issued | Water Dynamic P & H | 09/15/2026 |
| DOB NOW | General Construction | Permit Issued | Jimenezcorp | 09/14/2026 |
| DOB NOW | General Construction | Permit Issued | Tomak Group | 09/04/2026 |
| DOB NOW | Sign | Permit Issued | Neptune Signs & Awnings | 08/31/2026 |
| DOB NOW | Sign | Permit Issued | Neptune Signs & Awnings | 08/31/2026 |
| DOB NOW | General Construction | Permit Issued | Cooper Works | 08/04/2026 |
| DOB NOW | Plumbing | Permit Issued | Cape Plumbing | 07/30/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | Dynamix Scaffold Group | 07/07/2026 |
| DOB NOW | General Construction | Signed-off | AM Building Restoration* | 06/24/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | Vichihel Restoration | 06/18/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | Dynamix Scaffold Group | 05/13/2026 |
| DOB NOW | General Construction | Permit Issued | Monumental Remodeling | 05/01/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | KSW Mechanical | 02/18/2026 |
| DOB NOW | Plumbing | Permit Issued | Crossfield Plumbing & Heating | 02/10/2026 |
| DOB NOW | General Construction | Permit Issued | Webb Development Service | 12/12/2025 |
| DOB NOW | General Construction | Signed-off | Euro Restoration | 11/28/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | AM Building Restoration I | 09/18/2025 |
| DOB NOW | General Construction | Signed-off | AM Building Restoration* | 06/30/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | Dynamix Scaffold Group | 05/28/2025 |
| DOB NOW | General Construction | Signed-off | RD Home Construction | 05/14/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | Dynamix Scaffold Group | 05/12/2025 |
| DOB NOW | General Construction | Signed-off | Klein Kitchen | 03/28/2025 |
| DOB NOW | General Construction | Signed-off | BNJ Construction | 05/08/2024 |
| DOB NOW | Plumbing | Signed-off | Hudson Plumbing & MCH | 04/12/2024 |
| DOB NOW | General Construction | Signed-off | Brosna Construction | 04/02/2024 |
| DOB NOW | General Construction | Signed-off | Andiamo Painting | 12/13/2023 |
| DOB NOW | Plumbing | Signed-off | Cape Plumbing | 12/13/2023 |
| DOB NOW | Plumbing | Signed-off | Crown Plumbing | 12/07/2023 |
| DOB NOW | General Construction | Signed-off | Angeloss Home Improvemen | 11/30/2023 |
| DOB NOW | General Construction | Signed-off | C C Controlled Combustion | 04/19/2023 |
| DOB NOW | General Construction | Signed-off | Contracting NYC | 03/07/2023 |
| DOB NOW | Supported Scaffold | Signed-off | Cobra Kitchen Ventilation | 02/24/2023 |
| DOB NOW | Boiler Equipment | Signed-off | C C Controlled Combustion | 01/27/2023 |
| DOB NOW | General Construction | Signed-off | C C Controlled Combustion | 01/27/2023 |
| DOB NOW | Plumbing | Signed-off | CC Controlled Plumbing Co | 01/27/2023 |
| DOB NOW | Plumbing | Signed-off | A.M.N | 12/01/2022 |
| DOB NOW | General Construction | Signed-off | Northwood Interior | 11/29/2022 |
| DOB NOW | Plumbing | Signed-off | Arcon Plumbing Solutions | 11/25/2022 |
| DOB NOW | General Construction | Signed-off | EL Contracting | 11/23/2022 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/14/2026 | Permit Issued | Cooper Works | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric MXZ-SM48NL 50,000 BTU · Condensing Unit ×2 PKFY-L12NLMUA 13,500 BTU · Vrf Indoor ×2 PKFY-L08NLMUA 9,000 BTU · Vrf Indoor ×1 PKFY-L18NLMUA 20,000 BTU · Vrf Indoor ×1 TPEFYP054MA1M0A 60,000 BTU · Vrf Indoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/17/2026 | Permit Issued | Water Dynamic P & H | Gas, Water/Sanitary |
| 07/14/2026 | Permit Issued | J.hausman Plumbing | Water/Sanitary |
| 10/24/2025 | Permit Issued | AP Plumbing & HVAC | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/04/2026 | Permit Issued | Amber Electl Contng | General Wiring |
| 08/21/2026 | Permit Issued | Green Apple Electrical Services | General Wiring |
| 06/11/2026 | Permit Issued | Empire Lic Electrical Contractors | General Wiring |
| 05/12/2026 | Permit Issued | High Quality Electric of NYC | — |
| 04/23/2026 | Complete | Lume Electric | General Wiring |
| 04/14/2026 | Permit Issued | Brandl Electric | General Wiring |
| 03/27/2026 | Cancelled | E.N.E.L. Electrical | General Wiring |
| 02/18/2026 | Permit Issued | Interstate Electric | General Wiring |
| 11/29/2025 | Complete | Lina Electric | General Wiring |
| 11/26/2025 | Permit Issued | Electric Empire | General Wiring |
| 10/26/2025 | Complete | Method Electric | General Wiring |
| 04/16/2025 | Complete | Gia Electrical | — |
| 02/09/2025 | Complete | Gia Electrical | — |
| 01/23/2025 | Complete | The Metro Group Electric | General Wiring |
| 11/12/2024 | Complete | Conductor Electrical Services | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/15/2025 | Signed-off | Dynamix Scaffold Group | Scaffold, Sidewalk Shed |
| 06/21/2025 | Permit Issued | Dynamix Scaffold Group | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/29/2026 | Permit Issued | Prat Enterpise | Suspended Scaffold (SC) |
| 09/15/2025 | Permit Issued | AM Building Restoration I | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 10/11/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/11/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/10/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/30/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/26/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/24/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/20/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/09/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/09/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/16/2024 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 12/28/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 12/22/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/24/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/24/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/10/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/01/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/01/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/31/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/20/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/05/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/04/2023 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 11/17/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/16/2022 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/16/2022 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 10/14/2022 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/13/2026 | Fire-Resistant Penetrations and Joints | Chen Jin | special |
| 07/13/2026 | HVAC-R and service water piping design and insulation | Chen Jin | energy_progress |
| 07/09/2026 | Tenant Protection Plan Compliance | Chester Kowalski | special |
| 06/09/2026 | Final | BIANCA SKVIRSKY | progress |
| 03/31/2026 | Interior lighting power | JOSE LANDAURO | energy_progress |
| 03/31/2026 | Lighting controls | JOSE LANDAURO | energy_progress |
| 03/31/2026 | Tenant Protection Plan Compliance | JOSE LANDAURO | special |
| 03/31/2026 | Fire-Resistant Penetrations and Joints | JOSE LANDAURO | special |
| 03/31/2026 | Final | Javier de la Garza | progress |
| 03/31/2026 | Energy Code Compliance Inspections | JOSE LANDAURO | progress |
| 03/31/2026 | Fire-Resistance Rated Construction | JOSE LANDAURO | progress |
| 03/23/2026 | Final | Esther Cheung | progress |
| 12/17/2025 | Energy Code Compliance Inspections | Christopher Krepcio | progress |
| 12/17/2025 | Air barrier - visual inspection | Christopher Krepcio | energy_progress |
| 12/17/2025 | Fenestration air leakage | Christopher Krepcio | energy_progress |
| 12/17/2025 | Insulation placement and R values | Christopher Krepcio | energy_progress |
| 12/17/2025 | Final | Christopher Krepcio | progress |
| 12/17/2025 | Tenant Protection Plan Compliance | JOSE LANDAURO | special |
| 12/10/2025 | Tenant Protection Plan Compliance | — | special |
| 12/02/2025 | Fenestration air leakage | Christopher Krepcio | energy_progress |
| 12/02/2025 | Final | Christopher Krepcio | progress |
| 12/02/2025 | Air barrier - visual inspection | Christopher Krepcio | energy_progress |
| 12/02/2025 | Insulation placement and R values | Christopher Krepcio | energy_progress |
| 12/02/2025 | Energy Code Compliance Inspections | Christopher Krepcio | progress |
| 10/02/2025 | Final | AIMAN ELTOHAMY | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Culture Yogurt | Restaurant / Food Service | Floor 1 | Project M01428313 |