Condo, other/miscellaneous [derived]
Gramercy Pk.habital Condominium
205 EAST 22 STREET · BIN 1019668
💬 Discuss this project
1920Year Built
7Stories
RXBuilding Class
R8AZoning
94,593 sfGross Floor Area
67Units
LL97 CoveredRent Stabilized13 Open Violations ▸FISP: SAFE
Condo, other/miscellaneous [derived] · 18,044 sf lot · 5.24 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof4p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 9 docs
Floor 71p · 1 filing · 12 docs
Floor 6Under Construction4p · 2 filings · 15 docs
Floor 5Under Construction3p · 2 filings · 13 docs
Floor 4Under Construction3p · 2 filings · 14 docs
Floor 3Under Construction3p · 2 filings · 14 docs
Floor 2Under Construction4p · 2 filings · 18 docs
Floor 1Under Construction2p · 1 filing · 3 docs
CellarUnder Construction5p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DOUGLAS ELLIMAN PROPERTY MANAG3909/03/2026
KINGS GROUP NY407/08/2026
MANHATTAN SKYLINE303/22/2026
OTR 291 LLC703/22/2026
LIBERTY WINDOW GROUP203/22/2026
CHARLES H GREENTHAL103/22/2026
NORTHEAST 22ND ST. COMPANY3003/22/2026
TOTAL STRUCTURAL CONCEPTS INC.303/21/2026
GRAMERCY PK HABITAL CONDO DOUGEL603/21/2026
PHOENIX BRIDGING INC DBA PHOENIX503/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARSENAL BUILDING CONSULTANTS LLC203/21/2026
LMS-ACE SERVICES203/21/2026
PS ENGINEERS403/21/2026
J. CALLAHAN CONSULTING, INC.603/21/2026
RICHARD LEWIS ARCHITECT603/21/2026
CODE1203/21/2026
BUILDING BROTHERS203/21/2026
RAYMOND HO ARCHITECT803/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
Rigid Structural Design, LLC303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRADITIONAL WATERPROOFINGGeneral Contractor509/03/2026
ALKLEM PLUMBING INCPlumbing307/09/2026
SMI CONSTRUCTION MANGEMENTGeneral Contractor307/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor304/09/2026
DBC INTERIOR INCGeneral Contractor203/21/2026
PREMIER FLOW PLBG AND HTGPlumbing207/08/2026
MANHATTAN CABINETS, INCGeneral Contractor207/08/2026
ARCON PLBG SOLUTIONSPlumbing207/08/2026
PARK EAST DEVELOPMENT INCGeneral Contractor204/09/2026
PANDELI GJINIElectrical103/21/2026
RONALD TESTA, JR.Electrical103/21/2026
ORBIT SPRINKLER CORPFire Protection107/08/2026
PREMIER FLOW PLBG AND HTGFire Protection107/08/2026
BLACK SQUARE BUILDERS CORPGeneral Contractor104/09/2026
KINGS GROUP NY CORPGeneral Contractor107/08/2026
MASPETH CONTRACTING CORPGeneral Contractor104/09/2026
TECHNO-VOLT ELECTRIC, INCGeneral Contractor104/09/2026
A&H EXPRESS PLBG&HTG CORPPlumbing107/08/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
FERKO PLUMBING & HEATINGPlumbing107/08/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
PROCORE MECHANICAL CORPPlumbing107/08/2026
ZONE PLUMBING & HEATING CPlumbing107/08/2026
ANSHELEWITZ, ALVINElectrical103/21/2026
ACTIVE SIGNSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LOMBARDO PROF ENGINEERING8566106/15/2026
EDG2578306/15/2026
QUEENS ENGINEERING PLLC8898212/15/2025
COMPLY BUILDING GROUP8622108/08/2025
WAVIC ENGINEERING PLLC1733308/08/2025
METRIC CONSULTING AND INS1803103/18/2025
CATALPA SPECIAL INSPECTIO2004103/18/2025
GEE2000 ARCHITECT P.C.691103/06/2025
G ENGINEERING PC7778106/20/2024
RAYMOND HO ARCHITECT, PLL1654407/06/2023
Building Lifecycle
All (281)Filed (37)Permit Issued (34)Signed Off (19)Facade (FISP) (15)Violation (60)Inspection (32)Objection (54)Special Inspection (30)
09/02/2026
Permit issued — Structural
M01388827-I1-ST
07/20/2026
Signed off — Alteration
Filing for interior demolition and general construction of an apartment unit 2E. No change of use, egress of occupancy.
M01225673-S1
07/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/07/2026
Permit issued — Plumbing
M01066813-I1-PL
06/30/2026
Signed off — Alteration
Filing for interior demolition and general construction of an apartment unit 2E. No change of use, egress of occupancy.
M01225673-I1
06/23/2026
Signed off — Alteration
Filing for interior demolition and general construction of an apartment unit 2E. No change of use, egress of occupancy.
M01225673-S2
06/15/2026
Filed — Alteration
Garage repairs on the cellar floor as shown on the drawings filed herewith. No change in use, egress, or occupancy.
M01388827-I1
06/15/2026
Special inspection requirement — Post-installed Anchors
VIVEK SHAH
06/08/2026
Filed — Alteration
Plumbing work is filed for Apt. PHGC on 6th and 7th floor.
M01178381-P1
06/03/2026
Special inspection requirement — Tenant Protection Plan Compliance
Michael Lombardo
05/06/2026
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING OFFICES, NO CHANGE, IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M01297453-S1
05/01/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/30/2026
Special inspection requirement — Concrete - Cast-In-Place
VIVEK SHAH
04/30/2026
Special inspection requirement — Masonry
VIVEK SHAH
04/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
VIVEK SHAH
04/27/2026
Cycle 9 facade report signed — SAFE
04/16/2026
Special inspection requirement — Final
VIVEK SHAH
04/10/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/08/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/08/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/03/2026
Permit issued — General Construction
M01178381-I1-GC
03/31/2026
Cycle 9 facade report submitted
03/11/2026
Cycle 9 facade inspection completed
02/24/2026
Signed off — Alteration
MASONRY RESTORATION AND WINDOW SILL REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01166413-I1
02/18/2026
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING OFFICES, NO CHANGE, IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M01297453-I1
02/10/2026
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01052691-I1
02/10/2026
Signed off — Alteration
M01052710-I1
01/13/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/06/2026
Permit issued — Plumbing
M01297453-S1-PL
12/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/17/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/16/2025
Permit issued — General Construction
M01297453-I1-GC
12/15/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING OFFICES, NO CHANGE, IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M01297453-S1
12/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ANDREAS CHRISTOFOROU
12/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
ANDREAS CHRISTOFOROU
12/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/04/2025
Signed off — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
M01239123-I1
12/01/2025
Objection resolved — Addressed
12/01/2025
Objection resolved — Addressed
12/01/2025
Objection resolved — Addressed
12/01/2025
Objection resolved — Addressed
12/01/2025
Objection resolved — Addressed
11/27/2025
Objection raised — Scope
11/27/2025
Objection raised — Scope
11/27/2025
Objection raised — Plumbing
11/27/2025
Objection raised — Structural
11/27/2025
Objection raised — Admin
11/14/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING OFFICES, NO CHANGE, IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M01297453-I1
11/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/10/2025
Permit issued — Sprinklers
M01225673-S2-EW-SP
10/03/2025
Permit issued — Plumbing
M01225673-S1-PL
09/12/2025
Permit issued — General Construction
M01225673-I1-GC
09/02/2025
Filed — Alteration
FILE SUSPENDED SCAFFOLD OUTRIGGER SYSTEMS FOR FACADE RESTORATION AND INSPECTION.
M01239123-P1
09/02/2025
Objection raised — Fire_Protection
09/02/2025
Objection resolved — Addressed
09/02/2025
Objection raised — Fire_Protection
09/02/2025
Objection resolved — Addressed
08/20/2025
Permit issued — General Construction
M01166413-I1-GC
08/18/2025
Objection raised — Cost
08/18/2025
Objection resolved — Addressed
Latest 60 of 281 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedTRADITIONAL WATERPROOFING09/02/2026
DOB NOWPlumbingPermit IssuedALKLEM PLUMBING INC07/07/2026
DOB NOWGeneral ConstructionSigned-offPARK EAST DEVELOPMENT INC04/03/2026
DOB NOWPlumbingSigned-offA&H EXPRESS PLBG&HTG CORP01/06/2026
DOB NOWGeneral ConstructionSigned-offTECHNO-VOLT ELECTRIC, INC12/16/2025
DOB NOWSprinklersSigned-offORBIT SPRINKLER CORP10/10/2025
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC10/03/2025
DOB NOWGeneral ConstructionSigned-offBLACK SQUARE BUILDERS COR09/12/2025
DOB NOWGeneral ConstructionSigned-offMASPETH CONTRACTING CORP08/20/2025
DOB NOWPlumbingPermit IssuedALKLEM PLUMBING INC07/09/2025
DOB NOWSuspended ScaffoldSigned-offMASPETH CONTRACTING CORP06/24/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC05/19/2025
DOB NOWPlumbingPermit IssuedFERKO PLUMBING & HEATING05/13/2025
DOB NOWGeneral ConstructionSigned-offPARK EAST DEVELOPMENT INC05/08/2025
DOB NOWPlumbingPermit IssuedALKLEM PLUMBING INC08/01/2024
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC05/20/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC05/20/2024
DOB NOWGeneral ConstructionSigned-offTRADITIONAL WATERPROOFING07/25/2023
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC03/22/2023
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP11/17/2022
DOB NOWGeneral ConstructionSigned-offDBC INTERIOR09/14/2022
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS08/01/2022
DOB NOWGeneral ConstructionSigned-offTRADITIONAL WATERPROOFING07/27/2022
DOB NOWGeneral ConstructionSigned-offSMI CONSTRUCTION MANGEMEN07/21/2022
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS06/07/2022
DOB NOWGeneral ConstructionSigned-offSMI CONSTRUCTION MANGEMEN04/19/2022
DOB NOWPlumbingSigned-offPROCORE MECHANICAL CORP11/15/2021
DOB NOWGeneral ConstructionSigned-offMANHATTAN CABINETS, INC11/09/2021
DOB NOWSprinklersSigned-offGALICJA PLBG AND HTG CORP09/08/2021
DOB NOWGeneral ConstructionSigned-offMANHATTAN CABINETS, INC08/26/2021
DOB NOWPlumbingSigned-offGALICJA PLBG AND HTG.CORP05/27/2021
DOB NOWSignSigned-offACTIVE SIGNS INC04/22/2020
DOB NOWPlumbingSigned-offZONE PLUMBING & HEATING C01/03/2020
DOB NOWPlumbingSigned-offGALICJA PLBG AND HTG.CORP12/12/2019
BISOTISSUEDMASPETH CONTRACTING CORP10/19/2020
BISOTISSUEDBLACK SQUARE BUILDERS CORP07/08/2020
BISOTISSUEDFILIP HOME IMPR CONTR INC02/26/2020
BISOTISSUEDTND CONSTRUCTION INC01/08/2020
BISOTISSUEDBLACK SQUARE BUILDERS CORP11/20/2019
BISPLISSUEDM & M PIPING AND HEATING09/24/2019
+ 44 more permits on file
2 projects · most recent 08/08/2025
FiledStatusContractorScope
08/08/2025Signed-offORBIT SPRINKLER CORP53 heads
02/10/2022Signed-offPREMIER FLOW PLBG AND HTG—
5 projects · most recent 06/08/2026
Water/Sanitary Gas
FiledStatusContractorScope
06/08/2026Permit IssuedFERKO PLUMBING & HEATINGGas, Water/Sanitary
12/15/2025Signed-offDEPENDABLE MECH CORPWater/Sanitary
08/08/2025Signed-offORBIT PLBG & HTG INCWater/Sanitary
06/20/2024Permit IssuedALKLEM PLUMBING INCGas
11/29/2023Signed-offDONATO PLUMBING, INCGas, Water/Sanitary
21 projects · most recent 08/17/2026
General Wiring
FiledStatusContractorScope
08/17/2026Permit IssuedCENTURY ELECTRIC LLCGeneral Wiring
07/20/2026Permit IssuedEMPIRE LIC ELECL CONTRSGeneral Wiring
04/27/2026CompleteEMPIRE LIC ELECL CONTRSGeneral Wiring
01/13/2026Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
11/04/2025Permit IssuedCRESCO ELECTRICAL CORPGeneral Wiring
10/17/2025CompleteBERGER QUALITY ELEC'L CONGeneral Wiring
05/09/2025CompleteW 8 ELECTRIC CORPGeneral Wiring
05/29/2024CompleteBOROWIDE ELECT'L CONTR'S—
06/16/2023CompleteJOSEPH SGROI & SONS, INC.General Wiring
01/23/2023CompleteJOSEPH SGROI & SONS, INC.General Wiring
01/17/2023CompleteLUNA NYC ELECTRIC CORPGeneral Wiring
12/03/2022Permit IssuedHIGH QUALITY ELECTRIC OF—
11/18/2021CompletePHILIP A. ROBINSONGeneral Wiring
05/27/2021CompleteCENTRUM ELECTRIC CORPGeneral Wiring
04/07/2021CompleteFIU CORP DBA FIU ELECTRICGeneral Wiring
1 project · most recent 06/15/2026
Concrete
FiledStatusContractorScope
06/15/2026Permit IssuedTRADITIONAL WATERPROOFINGConcrete
1 project · most recent 12/15/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
12/15/2025Signed-offDEPENDABLE MECH CORPTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 32
DateTypeResultReport
07/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/01/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/10/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/08/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/08/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/11/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/06/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/22/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/27/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/27/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/02/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
02/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/01/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/23/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/23/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
Latest 25 of 32.
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
06/15/2026Post-installed AnchorsVIVEK SHAHspecial
06/03/2026Tenant Protection Plan ComplianceMichael Lombardospecial
04/30/2026Concrete - Cast-In-PlaceVIVEK SHAHspecial
04/30/2026MasonryVIVEK SHAHspecial
04/30/2026Structural Stability – Alterations of existing buildingsVIVEK SHAHspecial
04/16/2026FinalVIVEK SHAHprogress
12/15/2025Fire-Resistant Penetrations and JointsANDREAS CHRISTOFOROUspecial
12/15/2025Tenant Protection Plan ComplianceANDREAS CHRISTOFOROUspecial
08/05/2025Interior lighting powerWard Welchenergy_progress
08/05/2025Sprinkler SystemsDARIUSZ LUCZAKspecial
08/05/2025Lighting in dwelling unitsWard Welchenergy_progress
07/31/2025Fire-Resistant Penetrations and JointsANA ACCETTAspecial
07/31/2025Fire-Resistance Rated ConstructionWard Welchprogress
05/14/2025FinalWard Welchprogress
03/06/2025Lighting in dwelling unitsPETER GEEenergy_progress
03/03/2025Interior lighting powerPETER GEEenergy_progress
02/28/2025Energy Code Compliance InspectionsPETER GEEprogress
02/28/2025Fire-Resistant Penetrations and JointsPETER GEEspecial
02/28/2025FinalPETER GEEprogress
01/13/2025Insulation placement and R valuesERIC BERLENTenergy_progress
01/13/2025MasonrySAMI HAJJAR P.Especial
01/13/2025Post-installed AnchorsSAMI HAJJAR P.Especial
01/13/2025Tenant Protection Plan ComplianceERIC BERLENTspecial
01/13/2025FinalChrista Waringprogress
01/13/2025Energy Code Compliance InspectionsERIC BERLENTprogress
Latest 25 of 43.
▾Documents — 880 on file (BIS + DOB NOW)
▸Plans & Drawings37
▸DOB NOWPlans/Sketch30
09/03/2026M00582481-P2Request digital key ↗
09/03/2026M00582481-P1Request digital key ↗
09/03/2026M00582481-I1Request digital key ↗
Showing 3 of 30 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/05/2026M00275349-I1Request digital key ↗
09/05/2026M00261243-I1Request digital key ↗
09/05/2026M00261243-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/05/2026M00263137-I1Request digital key ↗
09/05/2026M00263137-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00320251-I1Request digital key ↗
▸Applications & Permits146
▸BISWORK PERMIT APPLICATION74
10/19/2020123910241Open ↗
03/02/2020123769083Open ↗
01/09/2020123846525Open ↗
Showing 3 of 74 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION70
06/29/2021123910241Open ↗
09/15/2020123910241Open ↗
05/07/2020123910241Open ↗
Showing 3 of 70 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
05/07/2020123910241Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications209
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION100
02/14/2020123769083Open ↗
02/10/2020123769083Open ↗
12/17/2019123846525Open ↗
Showing 3 of 100 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature35
09/05/2026M00263137-I1Open ↗
09/05/2026M00263137-P1Open ↗
09/05/2026M00275349-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/23/2026M01225673-S2Open ↗
09/01/2026M00582481-P1Open ↗
09/01/2026M01388827-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/01/2026M00613503-P1Open ↗
09/01/2026M01388827-I1Open ↗
08/31/2026M00691266-I1Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
01/07/2019140825463Open ↗
02/08/2017140602621Open ↗
Showing 2 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
01/07/2019140825463Open ↗
02/08/2017140602621Open ↗
Showing 2 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
01/07/2019140825463Open ↗
02/08/2017140602621Open ↗
Showing 2 of 4 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment70
▸BISSELF-CERT PLUMBING NOTICE26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISSCHEDULE B - PLUMBING20
01/07/2019140825463Open ↗
Showing 1 of 20 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE16
09/06/2019140825463Open ↗
09/03/2019140825463Open ↗
04/16/2019140825463Open ↗
Showing 3 of 16 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER/STANDPIPE ELECTRICAL LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
01/06/2017122528577Open ↗
▸Safety & Tenant Protection17
▸BISTenant Protection Plan and Notes9
02/14/2020123769083Open ↗
02/10/2020123769083Open ↗
10/24/2019123766898Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWTenant Protection Plan7
09/05/2026M00261243-I1Open ↗
09/05/2026M00261243-P1Open ↗
09/05/2026M00320251-I1Open ↗
Showing 3 of 7 on file for this type
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos79
▸DOB NOWDEP ACP-5: Asbestos Assessment Report31
09/05/2026M00263137-I1Open ↗
09/05/2026M00263137-P1Open ↗
09/05/2026M00275349-I1Open ↗
Showing 3 of 31 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)25
10/09/2020123910241Open ↗
09/15/2020123910241Open ↗
02/10/2020123769083Open ↗
Showing 3 of 25 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance68
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS33
02/14/2020123769083Open ↗
02/10/2020123769083Open ↗
12/17/2019123846525Open ↗
Showing 3 of 33 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS15
12/06/2021123910241Open ↗
02/05/2021123846525Open ↗
10/10/2019140825463Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
12/06/2021123910241Open ↗
02/05/2021123846525Open ↗
02/04/2021123769083Open ↗
Showing 3 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis4
09/02/2026M00691266-I1Open ↗
08/13/2026M00751982-I1Open ↗
08/13/2026M00747915-I1Open ↗
Showing 3 of 4 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/07/2019140825463Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/04/2021123769083Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY9
12/06/2021123910241Open ↗
02/05/2021123846525Open ↗
02/04/2021123769083Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
06/27/2017122861144Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
05/15/2018123182821Open ↗
▸Approvals, Objections & Sign-offs66
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST32
12/08/2021123910241Open ↗
02/05/2021123846525Open ↗
02/04/2021123769083Open ↗
Showing 3 of 32 on file for this type
▸BISADMINISTRATIVE OBJECTIONS22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
06/13/2018123182821Open ↗
06/06/2018123182821Open ↗
05/15/2018123182821Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/27/2026M01052710-I1Open ↗
08/13/2026M01052691-I1Open ↗
08/13/2026M01052691-P1Open ↗
▸BISSUPERSEDING LETTER2
09/24/2019121292662Open ↗
01/31/2019121292662Open ↗
▸Cost, Insurance & Ownership82
▸BISCOST AFFIDAVIT78
12/07/2021123910241Open ↗
12/06/2021123910241Open ↗
09/16/2021123910241Open ↗
Showing 3 of 78 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT4
03/02/2020123769083Open ↗
Showing 1 of 4 on file for this type
▸Filing & Intake Forms83
▸BISEFILING COVER SHEET38
05/04/2020123910241Open ↗
02/14/2020123769083Open ↗
02/10/2020123769083Open ↗
Showing 3 of 38 on file for this type
▸BISADDITIONAL INFORMATION24
09/16/2021123910241Open ↗
10/09/2020123910241Open ↗
04/29/2020123910241Open ↗
Showing 3 of 24 on file for this type
▸BISBOROUGH INTAKE FORM15
10/19/2020123910241Open ↗
05/04/2020123910241Open ↗
10/10/2019140825463Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
01/07/2019140825463Open ↗
02/08/2017140602621Open ↗
Showing 2 of 6 on file for this type
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations2
08/13/2026M01239123-P1Open ↗
08/13/2026M01239123-I1Open ↗
▸DOB NOWManufacturer's Specifications2
08/13/2026M01239123-I1Open ↗
08/13/2026M01239123-P1Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
06/27/2017122861144Open ↗
▸BISARA Supporting Document1
06/27/2017122861144Open ↗