Condo, residential tower (mixed-use, multi-family elevator) [derived]
Brompton Condominium
205 EAST 85TH STREET · BIN 1087920
💬 Discuss this project
2007Year Built
20Stories
RMBuilding Class
C2-8AZoning
284,702 sfGross Floor Area
166Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 20,426 sf lot · 13.94 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 17Unit 17E, Unit 17FUnder Construction9p · 3 filings · 10 docs
Floor 16Unit 16L9p · 1 filing · 13 docs
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11Unit 11B, Unit 11C, Unit 11D +2Under Construction24p · 5 filings · 20 docs
Floor 10
Floor 9Unit 11L8p · 2 filings · 5 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3Unit 3GH5p · 2 filings · 11 docs
Floor 2Housekeeping and rubbish removal for dust control5p · 2 filings · 9 docs
Floor 1The Soto Method, Athleta72p · 8 filings · 20 docs
Site & exteriorWilsonUnder Construction30p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
86th & 3rd Owners6603/21/2026
1517-25 Third Avenue3803/21/2026
Bar-Mar Associates2207/08/2026
210 E 86 St Corp-Mem of Bar-Mar1903/21/2026
210 E 86th St1003/21/2026
S & M Enterprises603/21/2026
The Wings Group503/22/2026
C2016 Trust503/21/2026
210 East 86 Street403/21/2026
Agency 86 3rd Owner403/21/2026
1517-25 3 AVE403/21/2026
Brompton Condominium403/21/2026
Perlbinder Realty303/21/2026
Park Wing Realty203/21/2026
1511 3 Ave Associates203/21/2026
L&L Wings203/21/2026
The Vgroup103/22/2026
NYC Department of Housing Preservation and Development103/21/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Metropolis Group1403/21/2026
A S Design Collaborative403/21/2026
A & T Design Group403/21/2026
All in Permit Consultants103/21/2026
Paul Fusco Consulting803/21/2026
Rip CC603/21/2026
Expedient Consulting203/21/2026
Dimo Design103/21/2026
Dina Vedmed Architect103/21/2026
Jenny Flores Expediting203/21/2026
Perotto Consulting Management203/21/2026
J Callahan Consulting603/21/2026
All City Expediting203/21/2026
Municipal Building Consultants203/21/2026
Louis Striar203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Platinum Industries GroupGeneral Contractor603/21/2026
TMS Plumbing & HeatingPlumbing307/08/2026
Vella InteriorsGeneral Contractor307/08/2026
Hydrokinetic Plumbing & Heating IPlumbing308/14/2026
Source ElectricGeneral Contractor203/22/2026
Stanex ConstructionGeneral Contractor204/09/2026
Streamline USAGeneral Contractor207/08/2026
Universal ServicesGeneral Contractor203/21/2026
Reem Plumbing & HeatingFire Protection207/08/2026
Soho ContractingScaffold207/08/2026
Master 2 Plumbing & HeatingPlumbing207/08/2026
Leone Construction Manag*General Contractor208/04/2026
Master Plumbing and HeatingFire Protection207/08/2026
Coyle ContractingGeneral Contractor204/09/2026
A&A PlumbingPlumbing207/08/2026
G.N.T. MechanicalPlumbing107/08/2026
Able Electrical Service & MNTElectrical103/22/2026
Marathon MechanicalPlumbing107/08/2026
Master PLB and HeatingPlumbing107/08/2026
Midland Electrical CoElectrical103/21/2026
Blueberry BuildersGeneral Contractor104/09/2026
Michael Brothers ElectricElectrical103/22/2026
Gallery Restorationspecialty_contractor107/08/2026
Klein KitchenGeneral Contractor104/09/2026
Next Generation Restorationspecialty_contractor107/08/2026
Elpo Electrical ContgElectrical103/22/2026
Polar Mechanicalspecialty_contractor108/30/2026
A1 SpecializedSign hanger107/08/2026
National MaintenanceSign hanger107/08/2026
Advanced Plumbing MechanicalPlumbing107/08/2026
Anesis ServicesFire Protection108/26/2026
G.N.T. MechanicalFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Welldone Inspection8628607/29/2026
Bendix Engineering4293201/28/2026
Zarina Kindo, RA4900111/30/2025
Jack Green Associates422411/20/2025
Hudson Union Architecture9266111/20/2025
Outsource Special Inspection2827111/03/2025
Gregory V. Perotto, P.E947302/28/2025
Steven Michael Peterson S2035202/09/2024
Special Testing & Consulting1688506/21/2023
AK Consulting Services, I6198212/02/2021
AK Engineering678201/11/2021
Building Lifecycle
All (231)Filed (39)Permit Issued (40)Signed Off (20)Facade (FISP) (6)Violation (60)Inspection (18)Objection (18)Special Inspection (30)
08/28/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
08/27/2026
Permit issued — Mechanical Systems
M01436325-S2-MS
08/25/2026
Permit issued — Sprinklers
M01436325-S3-EW-SP
08/13/2026
Permit issued — Plumbing
M01436325-S1-PL
08/13/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/12/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/06/2026
Objection resolved — Addressed
08/06/2026
Objection resolved — Addressed
08/06/2026
Objection resolved — Addressed
08/06/2026
Objection resolved — Addressed
08/06/2026
Objection resolved — Addressed
08/04/2026
Objection raised — Structural
08/04/2026
Objection raised — Scope
08/04/2026
Objection raised — Scope
08/04/2026
Objection raised — Scope
08/04/2026
Objection raised — Scope
08/04/2026
Objection resolved — Addressed
08/03/2026
Permit issued — General Construction
M01436325-I1-GC
08/03/2026
Objection raised — Scope
07/29/2026
Filed — Alteration
RELOCATE SPRINKLER PER PLAN IN UNIT 12K. NO CHANGE IN SPRINKLER RISER OR INFRASTRUCTURE.
M01436325-S3
07/29/2026
Filed — Alteration
RELOCATE SPRINKLER PER PLAN IN UNIT 12K. NO CHANGE IN SPRINKLER RISER OR INFRASTRUCTURE.
M01436325-I1
07/29/2026
Filed — Alteration
RELOCATE SPRINKLER PER PLAN IN UNIT 12K. NO CHANGE IN SPRINKLER RISER OR INFRASTRUCTURE.
M01436325-S2
07/29/2026
Filed — Alteration
RELOCATE SPRINKLER PER PLAN IN UNIT 12K. NO CHANGE IN SPRINKLER RISER OR INFRASTRUCTURE.
M01436325-S1
07/25/2026
Special inspection requirement — Tenant Protection Plan Compliance
QIUFAN JIANG
07/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIUFAN JIANG
07/25/2026
Special inspection requirement — Interior lighting power
Chiwa Yeung
07/25/2026
Special inspection requirement — Sprinkler Systems
QIUFAN JIANG
07/25/2026
Special inspection requirement — Tenant Protection Plan Compliance
QIUFAN JIANG
07/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
QIUFAN JIANG
07/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
QIUFAN JIANG
07/24/2026
Special inspection requirement — Final
Chiwa Yeung
07/24/2026
Special inspection requirement — Lighting controls
Chiwa Yeung
07/24/2026
Special inspection requirement — Lighting in dwelling units
Chiwa Yeung
06/11/2026
Signed off — Alteration
MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS
M01298815-S3
06/01/2026
Signed off — Alteration
MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS
M01298815-S2
05/27/2026
Permit issued — General Construction
M01239040-I1-GC
05/14/2026
Signed off — Alteration
MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS
M01298815-S1
05/14/2026
Signed off — Alteration
MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS. NO CHANGE TO USE, OCCUPANCY OR EGRESS
M01298815-I1
04/21/2026
Signed off — Alteration
RENOVATE EXISTING APARTMENT, PARTITIONS & DOORS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01384372-I1
04/20/2026
Permit issued — General Construction
M01384372-I1-GC
04/17/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/13/2026
Filed — Alteration
RENOVATE EXISTING APARTMENT, PARTITIONS & DOORS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M01384372-I1
04/08/2026
Signed off — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION OF APARTMENT 3GH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00635919-I1
04/08/2026
Permit issued — General Construction
M01239040-I1-GC
04/08/2026
Special inspection requirement — Final
Dina Vedmed
04/08/2026
Special inspection requirement — Lighting in dwelling units
Dina Vedmed
04/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Dina Vedmed
04/07/2026
Permit issued — Plumbing
M01242481-I1-PL
03/26/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/19/2026
Signed off — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION OF APARTMENT 3GH (INSTALLATION OF PLUMBING FIXTURES). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00635920-I1
01/28/2026
Filed — Alteration
M01239040-I1
01/28/2026
Filed — Alteration
M01345802-I1
01/28/2026
Filed — Alteration
M01242481-I1
01/28/2026
Permit issued — Sign
M01332158-I1-SG
01/26/2026
Signed off — Alteration
Replacement of plumbing fixture in unit 11L at existing rough-ins. No change in use, occupancy, or egress
M01290914-I1
01/22/2026
Special inspection requirement — Lighting in dwelling units
Matthew Bendix
01/22/2026
Special inspection requirement — Lighting controls
Matthew Bendix
01/16/2026
Signed off — Alteration
Non-structural interior renovation of residential unit with new finishes, fixture, appliances, and lighting fixture. No change in use, egress, or occupancy.
M01291302-I1
01/14/2026
Permit issued — Sprinklers
M01298815-S3-EW-SP
01/08/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 231 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedPolar Mechanical08/27/2026
DOB NOWSprinklersPermit IssuedAnesis Services08/25/2026
DOB NOWPlumbingPermit IssuedHydrokinetic Plumbing & Heating I08/13/2026
DOB NOWGeneral ConstructionPermit IssuedLeone Construction Manag*08/03/2026
DOB NOWGeneral ConstructionPermit IssuedStreamline USA05/27/2026
DOB NOWGeneral ConstructionSigned-offNext Generation Restoration04/20/2026
DOB NOWGeneral ConstructionPermit IssuedStreamline USA04/08/2026
DOB NOWPlumbingPermit IssuedAdvanced Plumbing Mechanical04/07/2026
DOB NOWSignPermit IssuedMad Signs01/28/2026
DOB NOWSprinklersSigned-offReem Plumbing & Heating01/14/2026
DOB NOWMechanical SystemsPermit IssuedUniversal Services01/06/2026
DOB NOWMechanical SystemsSigned-offCoyle Contracting12/02/2025
DOB NOWPlumbingSigned-offA&A Plumbing12/01/2025
DOB NOWSprinklersSigned-offReem Plumbing & Heating11/28/2025
DOB NOWGeneral ConstructionSigned-offCoyle Contracting11/25/2025
DOB NOWGeneral ConstructionPermit IssuedBlueberry Builders11/13/2025
DOB NOWPlumbingSigned-offHydrokinetic Plumbing & Heating I10/28/2025
DOB NOWPlumbingSigned-offTMS Plumbing & Heating10/20/2025
DOB NOWGeneral ConstructionSigned-offLeone Construction Manag*10/06/2025
DOB NOWGeneral ConstructionSigned-offStanex Construction02/11/2025
DOB NOWPlumbingSigned-offMarathon Mechanical03/22/2024
DOB NOWGeneral ConstructionSigned-offStanex Construction03/11/2024
DOB NOWPlumbingSigned-offTMS Plumbing & Heating12/19/2023
DOB NOWMechanical SystemsSigned-offPlatinum Industries Group12/16/2022
DOB NOWGeneral ConstructionSigned-offPlatinum Industries Group12/16/2022
DOB NOWPlumbingSigned-offG.N.T. Mechanical12/09/2022
DOB NOWSprinklersSigned-offG.N.T. Mechanical12/08/2022
DOB NOWSignSigned-offNational Maintenance05/13/2022
DOB NOWGeneral ConstructionSigned-offKlein Kitchen01/10/2022
DOB NOWPlumbingSigned-offMaster PLB and Heating01/08/2022
DOB NOWPlumbingSigned-offTMS Plumbing & Heating01/07/2022
DOB NOWGeneral ConstructionSigned-offGallery Restoration10/15/2021
DOB NOWMechanical SystemsSigned-offVella Interiors08/17/2021
DOB NOWPlumbingSigned-offMaster 2 Plumbing & Heating05/12/2021
DOB NOWSprinklersSigned-offMaster Plumbing and Heating04/23/2021
DOB NOWMechanical SystemsSigned-offVella Interiors01/25/2021
DOB NOWSprinklersSigned-offMaster Plumbing and Heating01/15/2021
DOB NOWPlumbingSigned-offMaster 2 Plumbing & Heating01/15/2021
DOB NOWSidewalk ShedSigned-offSoho Contracting06/25/2018
DOB NOWSidewalk ShedSigned-offSoho Contracting06/08/2018
+ 50 more permits on file
2 projects · most recent 11/30/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/30/2025Permit IssuedUniversal ServicesHeating and Air Conditioning Systems
Heat / Cool
Trane wsch012 12,000 BTU · Heat Pump Outdoor ×1
11/20/2025Signed-offCoyle ContractingHeating and Air Conditioning Systems
Heat / Cool
Water Furnace V5AV048 1,323 CFM · Fan Coil Indoor ×1
2 projects · most recent 07/29/2026
Sprinkler System
FiledStatusContractorScope
07/29/2026Permit IssuedThomas FaySprinkler System
11/20/2025Signed-offReem Plumbing & Heating6 heads
2 projects · most recent 07/29/2026
Water/Sanitary Gas
FiledStatusContractorScope
07/29/2026Permit IssuedHydrokinetic Plumbing & Heating IGas, Water/Sanitary
11/20/2025Signed-offA&A PlumbingWater/Sanitary
18 projects · most recent 08/25/2026
General Wiring Lighting
FiledStatusContractorScope
08/25/2026CompleteTop Notch Electric—
08/13/2026Permit IssuedPrecision Electrical ContGeneral Wiring
03/20/2026CompleteTop Notch Electric—
12/08/2025CompleteTrinity Electric GroupGeneral Wiring
10/08/2025Permit IssuedAlliance Elevator Company—
04/18/2025CompletePower Surge ElectricGeneral Wiring
10/16/2024Permit IssuedAccurate ElectricalGeneral Wiring
05/22/2024CompleteAlliance Elevator Company—
03/19/2024CompleteSource ElectricGeneral Wiring, Lighting
12/21/2022CompleteRoz-A-Lite Electrical Contg IGeneral Wiring
08/31/2022CompletePower Surge ElectricGeneral Wiring
04/21/2022CompleteRainbow Electric CoGeneral Wiring
02/14/2022CompleteMichael Brothers ElectricGeneral Wiring
04/15/2021CompleteA & S Electric—
03/22/2019CompleteAble Electrical Service & MNTGeneral Wiring
1 project · most recent 11/20/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
11/20/2025Signed-offReem Plumbing & HeatingTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
08/28/2026Fail-Final General Construction Non-Directive 14FailView ↗
08/13/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/12/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/26/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/08/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/27/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/04/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/21/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/21/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/19/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/19/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/30/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 76
DateRequirementInspectorRole
07/25/2026Tenant Protection Plan ComplianceQIUFAN JIANGspecial
07/25/2026Fire-Resistant Penetrations and JointsQIUFAN JIANGspecial
07/25/2026Interior lighting powerChiwa Yeungenergy_progress
07/25/2026Sprinkler SystemsQIUFAN JIANGspecial
07/25/2026Tenant Protection Plan ComplianceQIUFAN JIANGspecial
07/24/2026Lighting in dwelling unitsChiwa Yeungenergy_progress
07/24/2026Lighting controlsChiwa Yeungenergy_progress
07/24/2026Tenant Protection Plan ComplianceQIUFAN JIANGspecial
07/24/2026Fire-Resistant Penetrations and JointsQIUFAN JIANGspecial
07/24/2026FinalChiwa Yeungprogress
04/08/2026Energy Code Compliance InspectionsDina Vedmedprogress
04/08/2026FinalDina Vedmedprogress
04/08/2026Lighting in dwelling unitsDina Vedmedenergy_progress
01/22/2026Lighting controlsMatthew Bendixenergy_progress
01/22/2026Lighting in dwelling unitsMatthew Bendixenergy_progress
11/24/2025Mechanical SystemsZARINA KINDOspecial
11/24/2025FinalGEORGE GUTTMANNprogress
10/30/2025Lighting controlsJeff Fuquayenergy_progress
10/07/2025HVAC-R and service water piping design and insulationLAWRENCE GREENenergy_progress
10/07/2025Tenant Protection Plan ComplianceLAWRENCE GREENspecial
10/07/2025Mechanical SystemsLAWRENCE GREENspecial
10/07/2025FinalLAWRENCE GREENprogress
10/07/2025Energy Code Compliance InspectionsLAWRENCE GREENprogress
10/07/2025HVAC-R and service water heating equipmentLAWRENCE GREENenergy_progress
10/07/2025HVAC-R and service water heating system controlsLAWRENCE GREENenergy_progress
Latest 25 of 76.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The Soto MethodFitness / RecreationFloor 1
Project M01298815 Alteration · LOC Issued · 11/20/2025
AthletaRetailFloor 1
Project M01169987 Alteration · Approved · 02/28/2025
WilsonRetailFloor 1
Project M00730187 Alteration · LOC Issued · 05/12/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,109 on file (BIS + DOB NOW)
▸Plans & Drawings40
▸DOB NOWPlans/Sketch37
09/06/2026M00051349-I1Request digital key ↗
09/06/2026M00051349-P1Request digital key ↗
09/03/2026M00552635-P1Request digital key ↗
Showing 3 of 37 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00313076-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00313835-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/04/2026M00323592-I1Request digital key ↗
▸Applications & Permits203
▸BISPLAN / WORK APPROVAL APPLICATION108
01/19/2021140978333Open ↗
01/04/2021140978333Open ↗
05/30/2019104483710Open ↗
Showing 3 of 108 on file for this type
▸BISWORK PERMIT APPLICATION90
01/22/2021140978333Open ↗
01/28/2019123465455Open ↗
10/05/2018123465455Open ↗
Showing 3 of 90 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
01/19/2021140978333Open ↗
▸Seals & Professional Certifications300
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION131
07/10/2019123465455Open ↗
07/10/2019123465455Open ↗
01/15/2019122371520Open ↗
Showing 3 of 131 on file for this type
▸DOB NOWProgress Inspector Seal & Signature43
09/23/2026M01298815-S2Open ↗
09/23/2026M01298815-S2Open ↗
09/23/2026M00552635-P1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature40
09/06/2026M00051349-I1Open ↗
09/04/2026M00323592-I1Open ↗
09/04/2026M00313835-I1Open ↗
Showing 3 of 40 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST31
09/13/2018123465455Open ↗
03/23/2018123410665Open ↗
07/13/2017123312879Open ↗
Showing 3 of 31 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/23/2026M01298815-S2Open ↗
09/23/2026M00552635-P1Open ↗
09/23/2026M01298815-S3Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
09/13/2018123465455Open ↗
03/23/2018123410665Open ↗
07/13/2017123312879Open ↗
Showing 3 of 13 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
01/19/2021140978333Open ↗
02/09/2018140724429Open ↗
▸Trade Schedules & Equipment100
▸BISSELF-CERT PLUMBING NOTICE39
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 39 on file for this type
▸BISSCHEDULE B - PLUMBING31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE12
01/16/2019123465455Open ↗
09/13/2018123465455Open ↗
03/23/2018123410665Open ↗
Showing 3 of 12 on file for this type
▸BISSPRINKLER INSP REPORT : FP-856
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSIGN HANGER CERTIFICATE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection12
▸BISTenant Protection Plan and Notes4
09/13/2018123465455Open ↗
03/23/2018123410665Open ↗
02/09/2018140724429Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWTenant Protection Plan3
08/13/2026M00313835-I1Open ↗
08/13/2026M00313076-I1Open ↗
08/13/2026M00323592-I1Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
01/19/2021140978333Open ↗
▸Environmental & Asbestos42
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
01/19/2021140978333Open ↗
10/05/2018123465455Open ↗
09/13/2018123465455Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/04/2026M00323592-I1Open ↗
09/04/2026M00313835-I1Open ↗
09/03/2026M00635920-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance71
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS34
07/10/2019123465455Open ↗
01/15/2019122371520Open ↗
01/15/2019122371520Open ↗
Showing 3 of 34 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS22
07/10/2019123465455Open ↗
01/15/2019122371520Open ↗
12/20/2018140724429Open ↗
Showing 3 of 22 on file for this type
▸BISTR8: Energy Code Progress Inspections5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
01/19/2021140978333Open ↗
04/06/2018140724429Open ↗
04/06/2018140724429Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis2
09/03/2026M00635919-I1Open ↗
08/13/2026M00552635-I1Open ↗
▸BISENERGY CODE 2ND REVIEW1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
02/09/2022140978333Open ↗
▸BISLIGHTING IN DWELLING UNITS1
02/09/2022140978333Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/19/2021140978333Open ↗
04/06/2018140724429Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
01/15/2019122371520Open ↗
▸Approvals, Objections & Sign-offs107
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST58
02/15/2022140978333Open ↗
07/10/2019123465455Open ↗
04/12/2019104483710Open ↗
Showing 3 of 58 on file for this type
▸BISADMINISTRATIVE OBJECTIONS32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
05/22/2018123410665Open ↗
Showing 1 of 10 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
05/30/2019104483710Open ↗
Showing 1 of 3 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL1
02/09/2022140978333Open ↗
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership115
▸BISCOST AFFIDAVIT111
01/19/2021140978333Open ↗
07/10/2019123465455Open ↗
01/15/2019122371520Open ↗
Showing 3 of 111 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
02/09/2022140978333Open ↗
02/09/2022140978333Open ↗
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms109
▸BISEFILING COVER SHEET59
09/13/2018123465455Open ↗
04/20/2018123502414Open ↗
03/23/2018123410665Open ↗
Showing 3 of 59 on file for this type
▸BISADDITIONAL INFORMATION24
01/19/2021140978333Open ↗
01/19/2021140978333Open ↗
04/27/2018140724429Open ↗
Showing 3 of 24 on file for this type
▸BISBOROUGH INTAKE FORM21
07/10/2019123465455Open ↗
05/30/2019104483710Open ↗
04/12/2019104483710Open ↗
Showing 3 of 21 on file for this type
▸BISeFiling Job Application Cover Sheet5
01/19/2021140978333Open ↗
02/09/2018140724429Open ↗
Showing 2 of 5 on file for this type
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
12/20/2018140724429Open ↗
Showing 1 of 4 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type