RoofUnder Construction7p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing · Protection and Mechanical Methods
TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
USE OF CHUTE AT THE TIME OF FULL DEMOLITION IN CONJUNCTION WITH THE DEMO APPLICATION
On file for this project
21 documents · 2 drawing sheets
Proposed to remove standpipe and sprinkler system prior to demolition, in conjunction with full demolition Job # B01184678. No change to use egress or occupancy under this application
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 50Under Construction1 filing · 3 docs
Issued Permit Scope
Protection and Mechanical Methods
TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
Floor 49
Floor 48
Floor 47
Floor 46
Floor 45
Floor 44
Floor 43
Floor 42
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6Under Construction1p · 2 filings · 12 docs
ArchitectureFire Protection
Issued Permit Scope
General Construction · Sprinklers · Standpipe
Proposed to remove standpipe and sprinkler system prior to demolition, in conjunction with full demolition Job # B01184678. No change to use egress or occupancy under this application
On file for this project
5 documents
REPAIR OF FACIA PANELS TO INCLUDE RE-CAULKING ON ALL EXPOSURES, RE-ATTACHMENT OF DAMAGED/CRACKED LIMESTONE PANELS AS SHOWN ON PLAN DRAWINGS HEREIN.
On file for this project
7 documents
Floor 5Under Construction4p · 3 filings · 20 docs
ArchitectureDMFire ProtectionMechanical
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sprinklers · Standpipe
USE OF CHUTE AT THE TIME OF FULL DEMOLITION IN CONJUNCTION WITH THE DEMO APPLICATION
On file for this project
21 documents · 3 drawing sheets
Proposed to remove standpipe and sprinkler system prior to demolition, in conjunction with full demolition Job # B01184678. No change to use egress or occupancy under this application
On file for this project
5 documents
REPAIR OF FACIA PANELS TO INCLUDE RE-CAULKING ON ALL EXPOSURES, RE-ATTACHMENT OF DAMAGED/CRACKED LIMESTONE PANELS AS SHOWN ON PLAN DRAWINGS HEREIN.
On file for this project
7 documents
Floor 4Under Construction7p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe
USE OF CHUTE AT THE TIME OF FULL DEMOLITION IN CONJUNCTION WITH THE DEMO APPLICATION
On file for this project
21 documents · 3 drawing sheets
Proposed to remove standpipe and sprinkler system prior to demolition, in conjunction with full demolition Job # B01184678. No change to use egress or occupancy under this application
On file for this project
5 documents
Non-structural interior demolition
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 3Under Construction7p · 4 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe
USE OF CHUTE AT THE TIME OF FULL DEMOLITION IN CONJUNCTION WITH THE DEMO APPLICATION
On file for this project
21 documents · 3 drawing sheets
Proposed to remove standpipe and sprinkler system prior to demolition, in conjunction with full demolition Job # B01184678. No change to use egress or occupancy under this application
On file for this project
5 documents
Non-structural interior demolition
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 2Under Construction4p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe
USE OF CHUTE AT THE TIME OF FULL DEMOLITION IN CONJUNCTION WITH THE DEMO APPLICATION
On file for this project
21 documents · 1 drawing sheet
Proposed to remove standpipe and sprinkler system prior to demolition, in conjunction with full demolition Job # B01184678. No change to use egress or occupancy under this application
On file for this project
5 documents
Non-structural interior demolition
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 1Under Construction143p · 6 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Support of Excavation
Underpinning in conjunction with construction of 51 story new building. Building foundation and SOE filed separately.
On file for this project
112 documents · 4 drawing sheets
USE OF CHUTE AT THE TIME OF FULL DEMOLITION IN CONJUNCTION WITH THE DEMO APPLICATION
On file for this project
21 documents · 4 drawing sheets
Proposed to remove standpipe and sprinkler system prior to demolition, in conjunction with full demolition Job # B01184678. No change to use egress or occupancy under this application
On file for this project
5 documents
Latest 3 of 6 filings on this floor.
Mezzanine2p · 1 filing · 6 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Non-structural interior demolition
On file for this project
6 documents
CellarUnder Construction131p · 3 filings · 20 docs
ArchitectureDMPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Plumbing · Protection and Mechanical Methods · Support of Excavation
Underpinning in conjunction with construction of 51 story new building. Building foundation and SOE filed separately.
On file for this project
112 documents · 5 drawing sheets
USE OF CHUTE AT THE TIME OF FULL DEMOLITION IN CONJUNCTION WITH THE DEMO APPLICATION
On file for this project
21 documents
Non-structural interior demolition
On file for this project
6 documents · 2 drawing sheets
Sub-CellarUnder Construction123p · 1 filing · 20 docs
ArchitectureStructural
Issued Permit Scope
Foundation · Support of Excavation
Underpinning in conjunction with construction of 51 story new building. Building foundation and SOE filed separately.
On file for this project
112 documents · 1 drawing sheet