| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q00721236 ↗ | 89-12 162 STREET QUEENS | New Building | Permit Issued | 04/21/2022 | 06/01/2026 | Design S. WIEDER ARCHITECT P.C. Owner THE VAJA GROUP Filer SUNSHINE PLAZA LLC | Temporary Standpipe Work Type filed in conjunction with NB GC#Q00721236-I1 |
| X00588660 ↗ | 580 GERARD AVENUE BRONX | New Building | Permit Issued | 09/15/2021 | 05/22/2026 | Filer JM ZONING, LLC. | To install support scaffold for construction of new building. |
| Q00721898 ↗ | 89-25 162 STREET QUEENS | New Building | Permit Issued | 04/21/2022 | 12/26/2025 | Design S. WIEDER ARCHITECT P.C. Owner THE VAJA GROUP Filer SUNSHINE PLAZA LLC | Temporary Standpipe Work Type filed in conjunction with NB GC#Q00721898-I1 |
| B00480060 ↗ | 205 MONTAGUE STREET BROOKLYN | Alteration | Permit Issued | 08/25/2021 | 09/30/2025 | Design SPENCER ENGINEERING, PC Owner MIDTOWN EQUITIES | Non-structural interior demolition |
| X00687136 ↗ | WEST 170TH STREET BRONX | New Building | Permit Issued | 02/28/2022 | 07/31/2025 | Design ROGERS ARCHITECTS PLLC Owner 76-78 WEST 170 STREET Filer CORE CONSULTANTS NYC | Temp. Standpipe application in conjuction with New Building Job Number #X00687136-I1 |
| B00530191 ↗ | 55 WATER STREET BROOKLYN | Alteration | Signed-off | 06/18/2021 | 07/15/2025 | Design CROSS ARCHITECTURE | Interior Renovation of an Existing Eating and Drinking Establishment, Space 1A (55 Rest LLC). No change in Use, Egress, or Occupancy. |
| Name | Projects together | Most recent |
|---|---|---|
| LOMBARDO PROFESSIONAL ENGINEERING | 10 | 01/23/2023 |
| TAHIR DEMIRCIOGLU ARCHITECT PLLC | 4 | 04/19/2022 |
| ABEJA ENGINEERING PLLC | 2 | 11/08/2021 |
| ALL CITY ENGINEERING, P.C. | 2 | 09/07/2026 |
| BECKER ENGINEERING, P.C. | 2 | 11/28/2018 |
| ISSAC & STERN ARCHITECTS, P.C | 2 | 06/23/2026 |
| MCNAMARA SALVIA | 2 | 06/23/2026 |
| MOTTOLA RINI ENGINEERS | 2 | 01/06/2025 |
| S. WIEDER ARCHITECT P.C. | 2 | 09/07/2026 |
| SPENCER ENGINEERING, PC | 2 | 11/19/2021 |
| Structure 22 Engineering | 2 | 09/07/2026 |
| VASILIOS ARTEMIOU PE | 2 | 09/07/2026 |
| BERZAK ASSOCIATES ARCHITECTS PC | 1 | 01/20/2022 |
| CAMERON ENGINEERING | 1 | 11/19/2021 |
| CROSS ARCHITECTURE | 1 | 01/06/2025 |
| ENGINEERING SOLUTIONS | 1 | 06/16/2026 |
| FMC ENGINEERING | 1 | 06/23/2026 |
| GEOTECHNICAL ENGINEERING SERVICES | 1 | 03/11/2022 |
| JUST CONSULTING ENGINEERING | 1 | 09/07/2026 |
| LAURENCE G JONES ARCHITECTS, PLLC | 1 | 02/19/2021 |
| LUNA ENGINEERING INC. | 1 | 06/23/2026 |
| MADSEN CONSULTING ENGINEERING | 1 | 02/23/2022 |
| MARTIN H. KAPELL | 1 | 08/18/2021 |
| ROGERS ARCHITECTS PLLC | 1 | 06/16/2026 |
| SILMAN | 1 | 06/16/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| OMNIBUILD CONSTRUCTION IN | 4 | 06/23/2026 |
| MANHATTAN CONSTRUCTORS* | 3 | 01/23/2023 |
| CERTIFIED OF N.Y. INC | 2 | 01/06/2025 |
| CITY WIDE BUILDERS GRP IN | 2 | 09/07/2026 |
| REIDY CONTRACTING GROUP | 2 | 01/06/2025 |
| TARGET PIPING NY LLC | 2 | 09/07/2026 |
| ALPHA SCAFFOLDING INC | 1 | 06/23/2026 |
| BAYPORT CONSTRUCTION CORP | 1 | 06/23/2026 |
| BLUE WATER BUILDERS LLC | 1 | 06/16/2026 |
| ENER-CON TECHNICAL SERVIC | 1 | 06/23/2026 |
| FORWARD MECHANICAL CORP | 1 | 06/16/2026 |
| LIS PIPING SOLUTION INC | 1 | 06/23/2026 |
| MMI PLUMBING & HEATING IN | 1 | 11/19/2021 |
| STREAM PLUMBING INC | 1 | 06/23/2026 |
| VOLK INDUSTRIAL SERVICES | 1 | 11/19/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| MANHATTAN CONCRETE | 6 | 12/20/2022 |
| GETIR US INC. | 2 | 03/30/2022 |
| MIDTOWN EQUITIES | 2 | 11/19/2021 |
| THE VAJA GROUP | 2 | 09/07/2026 |
| 55 WATER LLC | 1 | 01/06/2025 |
| 76-78 WEST 170 STREET | 1 | 06/16/2026 |
| JDS CONSTRUCTION GROUP LLC | 1 | 11/19/2018 |
| SOHO PROPERTIES | 1 | 11/28/2018 |
| THE DATEN GROUP | 1 | 04/04/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| LOMBARDO BUILDING CONSULTANTS | 5 | 12/20/2022 |
| COMMERCIAL CAPITAL USA INC | 2 | 04/04/2022 |
| DOMANI CONSULTING | 2 | 11/28/2018 |
| SUNSHINE PLAZA LLC | 2 | 09/07/2026 |
| WILLIAM VITACCO ASSOCIATES | 2 | 11/19/2021 |
| ADVANCED BUILDERS SERVICES | 1 | 09/07/2026 |
| BROOKLYNROOTDESIGN | 1 | 09/07/2026 |
| CORE CONSULTANTS NYC | 1 | 06/16/2026 |
| JM ZONING, LLC. | 1 | 06/23/2026 |
| LOMBARDO PROFESSIONAL ENGINEERING | 1 | 07/09/2021 |
| PRISE PARTNERS LLC | 1 | 01/06/2025 |
| S&G EXPEDITING CORP | 1 | 06/16/2026 |
| SAM HOLIDAY EXPERDITORS | 1 | 01/20/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q00721236 ↗ | 89-12 162 STREET QUEENS | New Building | Permit Issued | 04/21/2022 | 06/01/2026 | Design S. WIEDER ARCHITECT P.C. Owner THE VAJA GROUP Filer SUNSHINE PLAZA LLC | Temporary Standpipe Work Type filed in conjunction with NB GC#Q00721236-I1 |
| X00588660 ↗ | 580 GERARD AVENUE BRONX | New Building | Permit Issued | 09/15/2021 | 05/22/2026 | Filer JM ZONING, LLC. | To install support scaffold for construction of new building. |
| Q00721898 ↗ | 89-25 162 STREET QUEENS | New Building | Permit Issued | 04/21/2022 | 12/26/2025 | Design S. WIEDER ARCHITECT P.C. Owner THE VAJA GROUP Filer SUNSHINE PLAZA LLC | Temporary Standpipe Work Type filed in conjunction with NB GC#Q00721898-I1 |
| B00480060 ↗ | 205 MONTAGUE STREET BROOKLYN | Alteration | Permit Issued | 08/25/2021 | 09/30/2025 | Design SPENCER ENGINEERING, PC Owner MIDTOWN EQUITIES | Non-structural interior demolition |
| X00687136 ↗ | WEST 170TH STREET BRONX | New Building | Permit Issued | 02/28/2022 | 07/31/2025 | Design ROGERS ARCHITECTS PLLC Owner 76-78 WEST 170 STREET Filer CORE CONSULTANTS NYC | Temp. Standpipe application in conjuction with New Building Job Number #X00687136-I1 |
| B00530191 ↗ | 55 WATER STREET BROOKLYN | Alteration | Signed-off | 06/18/2021 | 07/15/2025 | Design CROSS ARCHITECTURE | Interior Renovation of an Existing Eating and Drinking Establishment, Space 1A (55 Rest LLC). No change in Use, Egress, or Occupancy. |
| X00687238 ↗ | 580 GERARD AVENUE BRONX | Alteration | Signed-off | 03/09/2022 | 03/17/2025 | Design MCNAMARA SALVIA | Foundation element being filed in conjunction with new building, job #X00588660. |
| X00671237 ↗ | 580 GERARD AVENUE BRONX | Alteration | Signed-off | 02/01/2022 | 02/26/2025 | Scope of work filed to break a portion of the slab on grade. No impact to the existing structure. Application is filed in conjunction with F… | |
| X00686586 ↗ | 580 GERARD AVENUE BRONX | Alteration | Signed-off | 03/11/2022 | 02/26/2025 | SOE being filed in conjunction with new building, job #X00588660. | |
| B00566635 ↗ | 55 WATER STREET BROOKLYN | Alteration | Signed-off | 08/31/2021 | 10/01/2024 | Design MOTTOLA RINI ENGINEERS Owner 55 WATER LLC Filer PRISE PARTNERS LLC | Space 1A, ABC Kitchen - Mechanical renovations to existing restaurant filed herewith as per plans. No change in use, egress, or occupancy. |
| M00816912 ↗ | 135 EAST 47TH STREET MANHATTAN | Alteration | Signed-off | 01/23/2023 | 11/16/2023 | INSTALLATION AND USE OF TEMPORARY MINI MOBILE CRANE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATIO… | |
| M08017583 ↗ | 135 EAST 47TH STREET MANHATTAN | Alteration | Signed-off | 10/18/2022 | 11/16/2023 | Owner MANHATTAN CONCRETE | INSTALLATION AND USE OF TEMPORARY ALUMA SHORING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00801901 ↗ | 270 WEST 96 STREET MANHATTAN | Alteration | Signed-off | 12/20/2022 | 12/21/2022 | Owner MANHATTAN CONCRETE | INSTALLATION AND USE OF TEMPORARY MOBILE MINI CRANE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATIO… |
| M08018735 ↗ | 270 WEST 96 STREET MANHATTAN | Alteration | Signed-off | 10/11/2022 | 10/11/2022 | INSTALLATION AND USE OF TEMPORARY CONCRETE PLACING BOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | |
| M00717277 ↗ | 41 JOHN STREET MANHATTAN | Alteration | Permit Issued | 04/19/2022 | 05/02/2022 | TENANT FITOUT FOR A MINOR INTERIOR RENOVATION OF RETAIL SPACE THE FIRST FLOOR WITH ACCESSORY STORAGE SPACE AT CELLAR LEVEL, PROPOSING NEW P… | |
| M00680545 ↗ | 382 2 AVENUE MANHATTAN | Alteration | Permit Issued | 03/31/2022 | 04/15/2022 | TENANT FITOUT FOR A MINOR INTERIOR RENOVATION OF RETAIL SPACE ON THE FIRST FLOOR PROPOSING NEW PARTITIONS. NO CHANGE IN USE, OCCUPANCY OR EG… | |
| B00685709 ↗ | 577 4 AVENUE BROOKLYN | Alteration | Signed-off | 04/04/2022 | 04/12/2022 | Owner THE DATEN GROUP | COMMERCIAL TENANT FITOUT FOR AN INTERIOR RENOVATION OF RETAIL SPACE ON FIRST FLOOR, PROPOSING NEW PARTITIONS, FINISH WORK, FILED IN CONJUNCT… |
| M00690729 ↗ | 227 WEST 13 STREET MANHATTAN | Alteration | Signed-off | 03/30/2022 | 04/01/2022 | Owner GETIR US INC. | TENANT FITOUT FOR A MINOR INTERIOR RENOVATION OF RETAIL SPACE ON THE FIRST FLOOR PROPOSING NEW PARTITIONS. NO CHANGE IN USE, OCCUPANCY OR EG… |
| B00523720 ↗ | 200 MONTAGUE STREET BROOKLYN | Alteration | Signed-off | 06/02/2021 | 02/23/2022 | Owner MANHATTAN CONCRETE | INSTALLATION AND USE OF TEMPORARY MOBILE EQUIPMENT TO ASSIST IN CONSTRUCTION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPA… |
| B00665766 ↗ | 200 MONTAGUE STREET BROOKLYN | Alteration | Signed-off | 01/25/2022 | 02/23/2022 | Owner MANHATTAN CONCRETE | INSTALLATION AND USE OF TEMPORARTY SUPPORTED SCAFFOLD AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00545255 ↗ | 1165 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 07/09/2021 | 02/23/2022 | Owner MANHATTAN CONCRETE | Installation and use of concrete placing boom as per plans filed herewith. No change in use, egress, or occupancy. |
| M00615390 ↗ | 116 AVENUE OF THE AMER MANHATTAN | Alteration | Permit Issued | 11/08/2021 | 11/18/2021 | Design ABEJA ENGINEERING PLLC Owner GETIR US INC. | WE ARE FILING FOR THE INTERIOR RENOVATION OF AN EXIST. COMMERCIAL AREA (U.G. 6)@1ST. FL.. INCLUDES REPLACING FINISHES AS NEEDED, REPLACE LIG… |
| B00627123 ↗ | 55 WATER STREET BROOKLYN | Alteration | Signed-off | 11/08/2021 | 11/09/2021 | TEMPORARY ROOF INSTALLATION AT COURTYARD AREA TO BE INSTALLED DURING WINTER MONTHS WHILE TEMPORARY PLACE OF ASSEMBLY FOR CIRCUS EVENT IS ACT… | |
| M00617592 ↗ | 224 WEST 35 STREET MANHATTAN | Alteration | Permit Issued | 10/27/2021 | 11/04/2021 | Design ABEJA ENGINEERING PLLC | WE ARE FILING FOR THE INTERIOR RENOVATION OF AN EXIST. COMMERCIAL AREA (U.G. 6)@1ST. FL. AND MEZZANINE FL. INCLUDES REPLACING FINISHES THROU… |
| B00594699 ↗ | 205 MONTAGUE STREET BROOKLYN | Alteration | Permit Issued | 09/27/2021 | 09/29/2021 | Design SPENCER ENGINEERING, PC Owner MIDTOWN EQUITIES | Application filed for interior tenant fit-out including removal of non-structural partitions and installation of interior partitions and fin… |
| M00554543 ↗ | 54 WARREN STREET MANHATTAN | Alteration | Permit Issued | 07/14/2021 | 09/22/2021 | Filer SAM HOLIDAY EXPERDITORS | NEW STRUCTURAL FRAMING FOR PLATFORMS IN SUB-CELLAR/CELLAR TO BE USED FOR MECHANICAL EQUIP/SPACES. NEW FIRE-RELATED ENCLOSURES FOR GAS METER… |
| B00570305 ↗ | 205 SMITH STREET BROOKLYN | Alteration | Signed-off | 08/16/2021 | 09/08/2021 | STRUCTURAL WORK AND FOUNDATION WORK AS PER ATTACHED PLANS. NO CHANGE IN USE, OCCUPANCY, or EGRESS, UNDER THIS APPLICATION. | |
| B00577687 ↗ | 205 SMITH STREET BROOKLYN | Alteration | Signed-off | 08/18/2021 | 09/07/2021 | Design MARTIN H. KAPELL | New Elevator pit as per plans |
| B00552369 ↗ | 30 FRONT STREET BROOKLYN | Alteration | Signed-off | 07/08/2021 | 08/03/2021 | INSTALLATION AND USE OF TEMPORARY EXTERIOR CORE CLIMBING SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | |
| 340718245BIS | 30 FRONT STREET BROOKLYN | — | ISSUED | 02/19/2020 | 08/03/2021 | — | EQ |
| 340733040BIS | 30 FRONT STREET BROOKLYN | — | ISSUED | 06/17/2020 | 08/03/2021 | — | EQ |
| B00458161 ↗ | 55 WATER STREET BROOKLYN | Alteration | Signed-off | 02/19/2021 | 03/03/2021 | BASE BUILDING - INTERIOR RENOVATION AND DEMOLITION OF PARTITIONS FOR INSTALLATION OF NEW BATHROOMS ON THE 1ST FLOOR AS PER PLANS. NO CHANGE … | |
| B00458216 ↗ | 55 WATER STREET BROOKLYN | Alteration | Signed-off | 02/16/2021 | 03/01/2021 | Design MOTTOLA RINI ENGINEERS | BASE BUILDING -MODIFICATION TO EXISTING toilet exhaust system IN CONJUNCTION WITH NEW BATHROOMS INSTALLATION |
| 340788810BIS | 30 FRONT STREET BROOKLYN | — | ISSUED | 11/25/2020 | 11/25/2020 | — | EQ |
| 340783174BIS | 30 FRONT STREET BROOKLYN | — | ISSUED | 11/06/2020 | 11/06/2020 | — | EQ |
| 340783192BIS | 30 FRONT STREET BROOKLYN | — | ISSUED | 11/06/2020 | 11/06/2020 | — | EQ |
| 340762801BIS | 52 FLATBUSH AVENUE EXTENSION BROOKLYN | — | ISSUED | 09/09/2020 | 09/09/2020 | — | EQ |
| 122918879BIS | 29 9 AVENUE MANHATTAN | — | ISSUED | 05/22/2017 | 08/10/2020 | — | OT |
| 340718744BIS | 52 FLATBUSH AVENUE EXTENSION BROOKLYN | — | ISSUED | 02/24/2020 | 02/24/2020 | — | EQ |
| 123058957BIS | 29 9 AVENUE MANHATTAN | — | ISSUED | 08/03/2018 | 02/04/2020 | — | MH, OT, PL |
| 340712241BIS | 52 FLATBUSH AVENUE EXTENSION BROOKLYN | — | ISSUED | 01/03/2020 | 01/03/2020 | — | EQ |
| 123803009BIS | 29 9 AVENUE MANHATTAN | — | ISSUED | 09/12/2019 | 09/12/2019 | — | OT |
| M00124356 ↗ | 29 9 AVENUE MANHATTAN | Alteration | Signed-off | 01/29/2019 | 09/11/2019 | Owner MANHATTAN CONCRETE | INSTALLATION OF PROTECTIVE CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| 123680230BIS | 43 PARK PLACE MANHATTAN | — | ISSUED | 02/15/2019 | 02/15/2019 | — | OT |
| 123156360BIS | 43 PARK PLACE MANHATTAN | — | ISSUED | 12/24/2018 | 12/24/2018 | — | EQ |
| M00098445 ↗ | 111 WEST 57 STREET MANHATTAN | Alteration | Permit Issued | 11/19/2018 | 11/26/2018 | Design BECKER ENGINEERING, P.C. Filer DOMANI CONSULTING | INSTALLATION OF SUPPORTED SCAFFOLD AS PER PLANS. |
| M00096937 ↗ | 43 PARK PLACE MANHATTAN | Alteration | Permit Issued | 11/21/2018 | 11/21/2018 | Design BECKER ENGINEERING, P.C. Owner SOHO PROPERTIES Filer DOMANI CONSULTING | Install of Supported Scaffold from floors 001 thru 012 as per plans filed herewith. |
| 340598277BIS | 422 FULTON STREET BROOKLYN | — | ISSUED | 04/24/2018 | 10/03/2018 | — | OT |
| 123018661BIS | 111 WEST 57 STREET MANHATTAN | — | ISSUED | 03/31/2017 | 10/01/2018 | — | OT |
| 123109368BIS | 43 PARK PLACE MANHATTAN | — | ISSUED | 12/08/2017 | 07/17/2018 | — | OT |
| 140767631BIS | 43 PARK PLACE MANHATTAN | — | ISSUED | 05/30/2018 | 07/13/2018 | — | EQ |
| 123137676BIS | 29 9 AVENUE MANHATTAN | — | ISSUED | 11/08/2017 | 11/08/2017 | — | OT |
| 123137667BIS | 29 9 AVENUE MANHATTAN | — | ISSUED | 11/03/2017 | 11/03/2017 | — | OT |
| Building | Filings | Most Recent |
|---|---|---|
| 29 9 AVENUE ↗ | 2 | 07/08/2026 |
| 200 MONTAGUE STREET ↗ | 7 | 07/08/2026 |
| 41 JOHN STREET ↗ | 1 | 07/08/2026 |
| 89-12 162 STREET ↗ | 1 | 07/08/2026 |
| 1165 MADISON AVENUE ↗ | 5 | 07/08/2026 |
| 270 WEST 96 STREET ↗ | 4 | 07/08/2026 |
| 55 WATER STREET ↗ | 9 | 07/08/2026 |
| 577 4 AVENUE ↗ | 1 | 07/08/2026 |
| 205 MONTAGUE STREET ↗ | 5 | 07/08/2026 |
| 116 AVENUE OF THE AMER ↗ | 1 | 07/08/2026 |
| 135 EAST 47TH STREET ↗ | 5 | 07/08/2026 |
| WEST 170TH STREET ↗ | 1 | 07/08/2026 |
| 54 WARREN STREET ↗ | 1 | 07/08/2026 |
| 89-25 162 STREET ↗ | 1 | 04/09/2026 |
| 580 GERARD AVENUE ↗ | 11 | 04/09/2026 |
| 227 WEST 13 STREET ↗ | 3 | 03/21/2026 |
| 382 2 AVENUE ↗ | 3 | 03/21/2026 |
| 30 FRONT STREET ↗ | 3 | 03/21/2026 |
| 205 SMITH STREET ↗ | 6 | 03/21/2026 |
| 224 WEST 35 STREET ↗ | 3 | 03/21/2026 |
| 111 WEST 57 STREET ↗ | 3 | 03/21/2026 |
| 43 PARK PLACE ↗ | 3 | 03/21/2026 |