← Back
Condo, residential unit in elevator building
Vista on Vinegar Hill Condominium
206 FRONT STREET · BIN 3391191
💬 Discuss this project
2006Year Built
7Stories
R4Building Class
R6AZoning
37,725 sfGross Floor Area
46Units
LL97 CoveredRent Stabilized7 Open Violations ▸FISP: SAFEFDNY Report ↗
Condo, residential unit in elevator building · 8,190 sf lot · 4.61 FAR built · Flood zone X
Locations of Work
Structural
Cellar2p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHOICE NEW YORK MANAGEMENT307/08/2026
VISTA ON VINEGAR HILL CONDOMINIUM1407/08/2026
G & L RLTY GROUP LLC503/22/2026
OWNER OF 206 FRONT ST103/22/2026
G L REALTY1603/21/2026
CHOICE MANAGEMENT303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AGILE DESIGN ENGINEERING PC304/28/2025
NA107/22/2023
LU ENGINEERING SERVICE PC103/15/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Z BUILDING NY203/21/2026
HWANGS BUILDING MANAGEMEN103/21/2026
LC EXPEDITING SERVICES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HCMC GROUP INCGeneral Contractor807/08/2026
EFIN MANAGEMENT CORPGeneral Contractor203/21/2026
INGRAVALLO JOHNElectrical103/21/2026
JOHN INGRAVALLOElectrical103/21/2026
APOLLO ELECTRIC INSDUS IN 004990General Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARC CONSULTING ENGINEERS,4083304/28/2025
JIAN ENGINEERING PLLC7397104/28/2025
ANDREW GOODRICH, P.E., PL965108/21/2024
CMSC, INC6098108/21/2024
HSU & ASSOCIATES8025107/22/2023
LU ENGINEERING SERVICE PC6575103/15/2021
Building Lifecycle
All (97)Filed (5)Permit Issued (5)Signed Off (5)Facade (FISP) (6)Violation (60)Inspection (1)Objection (8)Special Inspection (7)
05/04/2026
Violation issued (HPD, closed)
A
09/15/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SHORING FOR EXISTING PARKING STRUCTURE CELLAR CEILING SLAB. NO EARTHWORK OR FOUNDATION WORK REQUIRED FOR THIS JOB.
B01099180-S1
09/11/2025
Signed off — Alteration
STRUCTURAL REPAIR FOR CELLAR CEILING SLAB. RESTORE FIREPROOFING IN CELLAR COLUMNS AND SLAB TO MATCH BUILDING FIREPROOFING REQUIREMENT.
B01215598-I1
07/23/2025
Permit issued — Structural
B01215598-I1-ST
07/22/2025
Permit issued — General Construction
B01099180-S1-GC
04/28/2025
Filed — Alteration
STRUCTURAL REPAIR FOR CELLAR CEILING SLAB. RESTORE FIREPROOFING IN CELLAR COLUMNS AND SLAB TO MATCH BUILDING FIREPROOFING REQUIREMENT.
B01215598-I1
03/07/2025
Objection resolved — Addressed
03/07/2025
Objection resolved — Addressed
03/07/2025
Objection resolved — Addressed
03/07/2025
Objection resolved — Addressed
03/03/2025
Objection raised — Structural
03/03/2025
Objection raised — Inspections
03/03/2025
Objection raised — Structural
03/03/2025
Objection raised — Admin
02/26/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SHORING FOR EXISTING PARKING STRUCTURE CELLAR CEILING SLAB. NO EARTHWORK OR FOUNDATION WORK REQUIRED FOR THIS JOB.
B01099180-I1
02/24/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SHORING FOR EXISTING PARKING STRUCTURE CELLAR CEILING SLAB. NO EARTHWORK OR FOUNDATION WORK REQUIRED FOR THIS JOB.
B01099180-S1
01/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
JAN PEREZ
01/31/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAN PEREZ
01/31/2025
Special inspection requirement — Final
JAN PEREZ
01/13/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/11/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/11/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/11/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/30/2024
Permit issued — General Construction
B01099180-I1-GC-CX
10/16/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/22/2024
Violation issued (ECB, closed)
Construction
08/21/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SHORING FOR EXISTING PARKING STRUCTURE CELLAR CEILING SLAB. NO EARTHWORK OR FOUNDATION WORK REQUIRED FOR THIS JOB.
B01099180-I1
08/15/2024
Violation issued (ECB, closed)
Construction
08/15/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/15/2024
Violation issued (ECB, closed)
Construction
08/15/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/15/2024
Violation issued (ECB, closed)
Construction
12/21/2023
Cycle 9 facade report signed — SAFE
12/06/2023
Cycle 9 facade report submitted
10/24/2023
Cycle 9 facade inspection completed
08/18/2023
Signed off — Alteration
FILE ALT-2 JOB FOR EXISTING CONDOMINIUM BUILDING, TO REMOVE 14 EXISTING GLASS PANEL ON THE WEST WALL ONLY. PROPOSED TO SEAL THE EXISTING OPENING WITH CMU WALL. NO CHANGE IN USE AND OCCUPANCY.
B00908242-I1
07/27/2023
Permit issued — General Construction
B00908242-I1-GC
07/22/2023
Filed — Alteration
FILE ALT-2 JOB FOR EXISTING CONDOMINIUM BUILDING, TO REMOVE 14 EXISTING GLASS PANEL ON THE WEST WALL ONLY. PROPOSED TO SEAL THE EXISTING OPENING WITH CMU WALL. NO CHANGE IN USE AND OCCUPANCY.
B00908242-I1
07/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chih Hsu
07/22/2023
Special inspection requirement — Fire-Resistance Rated Construction
Chih Hsu
07/22/2023
Special inspection requirement — Final
Chih Hsu
07/22/2023
Special inspection requirement — Energy Code Compliance Inspections
Chih Hsu
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/28/2023
Violation issued (FDNY_NOV, closed)
02/28/2023
Violation issued (FDNY_NOV, closed)
02/28/2023
Violation issued (FDNY_NOV, closed)
12/16/2022
Violation issued (ECB, closed)
Local Law
11/16/2022
Violation issued (FDNY_NOV, closed)
09/16/2022
Violation issued (FDNY_NOV, closed)
07/25/2022
Violation issued (FDNY_NOV, closed)
02/24/2022
Violation issued (HPD, closed)
A
02/22/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2021
Violation issued (HPD, open)
B
09/23/2021
Violation issued (HPD, open)
A
06/30/2021
Signed off — Alteration
B00480674-I1
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offHCMC GROUP INC07/23/2025
DOB NOWGeneral ConstructionSigned-offHCMC GROUP INC07/22/2025
DOB NOWGeneral ConstructionSigned-offEFIN MANAGEMENT CORP10/30/2024
DOB NOWGeneral ConstructionSigned-offHCMC GROUP INC07/27/2023
DOB NOWGeneral ConstructionSigned-offHCMC GROUP INC05/20/2021
BISOTISSUEDAIR DEPOT COMM. REFR. COR04/17/2018
BISOTISSUEDAIR DEPOT COMM. REFR. COR04/04/2017
BISOTISSUEDAIR DEPOT COMM. REFR. COR11/23/2016
BISCCISSUEDMGI03/06/2007
BISEQISSUEDMGI CONST INC01/08/2007
BISSPISSUEDB.H. PL & HTG CORP08/03/2006
BISPLISSUEDB.H. PL & HTG CORP08/03/2006
BISPLISSUEDB.H. PL & HTG CORP08/03/2006
BISEQISSUEDMGI CONST INC05/23/2006
BIS—ISSUEDM.G.I CONSTRUCTION, INC05/18/2006
BISMHISSUEDM.G.I CONSTRUCTION, INC05/18/2006
BISEQISSUEDM.G.I CONSTRUCTION, INC05/18/2006
BISEQISSUEDM.G.I. CONSTRUCTION INC03/03/2006
BISMHISSUEDM G I CONST INC02/27/2006
BISEQISSUEDMGI CONST01/03/2006
BISPLISSUEDB.H. PL & HTG CORP07/13/2005
BISSPISSUEDB.H. PL & HTG CORP07/13/2005
BISPLISSUEDB.H. PL & HTG CORP07/13/2005
BISOTISSUEDMGI CONSTRUCTION05/24/2005
BIS—ISSUEDMGI CONST05/13/2005
BISEQISSUEDMGI CONST05/13/2005
BISOTISSUEDMGI CONSTRUCTION02/08/2005
BIS—ISSUEDMGI CONST01/12/2005
BISEQISSUEDMGI CONST01/12/2005
BISEQISSUEDATLANTIC DEMOLITION CORP01/26/2004
BIS—ISSUEDATLANTIC DEMOLITION CORP01/26/2004
BISEQISSUEDYATSMACH PIRCONI CORP.01/20/2004
BIS—ISSUEDPEBBLE ROCK LTD12/03/2003
BISEQISSUEDPEBBLE ROCK LTD12/03/2003
1 project · most recent 08/02/2024
General Wiring
FiledStatusContractorScope
08/02/2024CompleteAPOLLO ELECTRIC INSDUS INGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
06/28/2021Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
01/31/2025Tenant Protection Plan ComplianceJAN PEREZspecial
01/31/2025Structural Stability – Alterations of existing buildingsJAN PEREZspecial
01/31/2025FinalJAN PEREZprogress
07/22/2023Fire-Resistant Penetrations and JointsChih Hsuspecial
07/22/2023Fire-Resistance Rated ConstructionChih Hsuprogress
07/22/2023FinalChih Hsuprogress
07/22/2023Energy Code Compliance InspectionsChih Hsuprogress
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/01/2026B00480674-I1Request digital key ↗
08/27/2026B00908242-I1Request digital key ↗
08/24/2026B01099180-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits10
▸BISWORK PERMIT APPLICATION6
04/17/2018340419005Open ↗
04/17/2018340419005Open ↗
04/19/2017340419005Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
01/28/2019340419005Open ↗
07/17/2017340419005Open ↗
09/28/2016340419005Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/01/2026B00480674-I1Open ↗
08/21/2026B01215598-I1Open ↗
08/13/2026B01099180-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B00908242-I1Open ↗
09/01/2026B00908242-I1Open ↗
09/01/2026B00908242-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026B00908242-I1Open ↗
08/24/2026B01099180-S1Open ↗
08/24/2026B01099180-S1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/20/2018340419005Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/09/2016340419005Open ↗
▸Trade Schedules & Equipment12
▸BISEQUIPMENT USE PERMITS9
03/14/2019340419005Open ↗
03/14/2019340419005Open ↗
03/14/2019340419005Open ↗
Showing 3 of 9 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
03/14/2019340419005Open ↗
03/14/2019340419005Open ↗
▸BISSCHEDULE B - PLUMBING1
09/09/2016340419005Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
11/01/2016340419005Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
11/01/2016340419005Open ↗
09/28/2016340419005Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/20/2018340419005Open ↗
▸Inspections & Test Reports3
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
11/28/2018340419005Open ↗
11/20/2018340419005Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/09/2016340419005Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
03/14/2019340419005Open ↗
03/04/2019340419005Open ↗
11/28/2018340419005Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
11/28/2018340419005Open ↗
11/20/2018340419005Open ↗
09/09/2016340419005Open ↗
▸Filing & Intake Forms10
▸BISADDITIONAL INFORMATION5
01/18/2019340419005Open ↗
12/12/2017340419005Open ↗
07/26/2017340419005Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM4
03/14/2019340419005Open ↗
03/04/2019340419005Open ↗
11/28/2018340419005Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
09/09/2016340419005Open ↗