Condo, residential tower (mixed-use, multi-family elevator) [derived]
The 206 W. 17 St Condominium
206 WEST 17 STREET · BIN 1013814
💬 Discuss this project
1910Year Built
12Stories
RMBuilding Class
C6-3AZoning
69,860 sfGross Floor Area
12Units
LL97 CoveredRent Stabilized9 Open Violations 8 unresolved · 1 paperwork only ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 6,207 sf lot · 11.26 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionGeneral
Roof4p · 2 filings · 12 docs
Floor 124p · 2 filings · 20 docs
Floor 113p · 1 filing · 5 docs
Floor 103p · 1 filing · 5 docs
Floor 93p · 1 filing · 5 docs
Floor 87p · 3 filings · 20 docs
Floor 74p · 2 filings · 20 docs
Floor 63p · 1 filing · 5 docs
Floor 53p · 1 filing · 5 docs
Floor 43p · 1 filing · 5 docs
Floor 33p · 1 filing · 5 docs
Floor 23p · 1 filing · 5 docs
Floor 15p · 3 filings · 20 docs
Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CEPRINE CONSTRUCTION1307/08/2026
206 WEST 17TH STREETONDO ASSOC6307/08/2026
AKAM ASSOCIATES2107/08/2026
HUBB NYC PROPERTIES807/08/2026
BAYSIDE CONTRACTING103/22/2026
206 WEST 17TH STREET2303/22/2026
108 7TH AVE SOUTH303/22/2026
70 CHRISTOPHER REALTY203/22/2026
108TH AVE SOUTH INC103/22/2026
7 AVENUE REALTY LLC203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CEPRINE CONSTRUCTION INCGeneral Contractor1007/08/2026
TAFFERA FINE BUILDING ANDGeneral Contractor707/08/2026
UBERTO, LTDGeneral Contractor407/08/2026
ARCON PLBG SOLUTIONSPlumbing307/08/2026
KG SPRINKLER CORPFire Protection307/08/2026
CASTCAPA CONSTRUCTION LLCGeneral Contractor307/08/2026
CRYSTAL COMFORT INCGeneral Contractor203/21/2026
CONDITIONING CONTROL SYSTEMSGeneral Contractor107/08/2026
THE METRO GROUP, INCGeneral Contractor107/08/2026
CC CONTROLLED PLBG CO.,INPlumbing107/08/2026
ALPHONSE, MICHAELElectrical103/21/2026
NATIONAL MAINTENANCEScaffold107/08/2026
BARRY SAXEElectrical103/21/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
PEREIRA, WESLLEYElectrical103/21/2026
ZVI SARAFRAZElectrical103/21/2026
MASTER PLBG AND HTG INCFire Protection107/08/2026
C C CONTROLLED COMBUSTIONGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JSPECS,INC9429501/13/2026
ROBERT F. GERMAIN JR. PE5100711/07/2025
RIMKUS NEW YORK, PLLC8123201/17/2023
GRANT ENGINEERING2627212/16/2022
JACK GREEN ASSOCIATES422510/13/2021
Building Lifecycle
All (196)Filed (24)Permit Issued (26)Signed Off (12)Facade (FISP) (16)Violation (60)Inspection (12)Objection (16)Special Inspection (30)
08/25/2026
Signed off — Alteration
MODIFY EXISTING FIRE SPRINKLER SYSTEM THROUGHOUT 7TH FLOOR APARTMENT TO PROVIDE PROPER COVERAGE FOR PARTITION CHANGES APPROVED UNDER ALTERATION #M01103256-I1.
M01103256-S1
08/25/2026
Signed off — Alteration
MODIFY EXISTING FIRE SPRINKLER SYSTEM THROUGHOUT 7TH FLOOR APARTMENT TO PROVIDE PROPER COVERAGE FOR PARTITION CHANGES APPROVED UNDER ALTERATION #M01103256-I1.
M01103256-I1
05/28/2026
Signed off — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN, RECONNECT EXISTING HOUSE SERVICE. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01168737-S1
05/28/2026
Signed off — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN, RECONNECT EXISTING HOUSE SERVICE. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01168737-I1
05/28/2026
Signed off — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN, RECONNECT EXISTING HOUSE SERVICE. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01168737-S2
03/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
Jeffrey Stones
03/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Jeffrey Stones
03/02/2026
Special inspection requirement — Lighting in dwelling units
Jeffrey Stones
03/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
Jeffrey Stones
03/02/2026
Special inspection requirement — Final
Jeffrey Stones
03/02/2026
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Stones
03/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
03/02/2026
Special inspection requirement — Mechanical Systems
Jeffrey Stones
02/12/2026
Permit issued — Mechanical Systems
M01103256-I1-GC
02/11/2026
Objection raised — Admin
02/11/2026
Objection resolved — Addressed
02/11/2026
Objection resolved — Addressed
02/09/2026
Objection raised — Scope
01/13/2026
Filed — Alteration
MODIFY EXISTING FIRE SPRINKLER SYSTEM THROUGHOUT 7TH FLOOR APARTMENT TO PROVIDE PROPER COVERAGE FOR PARTITION CHANGES APPROVED UNDER ALTERATION #M01103256-I1.
M01103256-P2
01/13/2026
Special inspection requirement — Lighting in dwelling units
Jeffrey Stones
01/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeffrey Stones
01/13/2026
Special inspection requirement — Mechanical Systems
Jeffrey Stones
01/13/2026
Special inspection requirement — Energy Code Compliance Inspections
Jeffrey Stones
01/13/2026
Special inspection requirement — Final
Jeffrey Stones
01/13/2026
Special inspection requirement — HVAC-R and service water heating system controls
Jeffrey Stones
01/13/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Jeffrey Stones
01/13/2026
Special inspection requirement — HVAC-R and service water heating equipment
Jeffrey Stones
12/29/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/12/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
Robert Germain Jr.
11/10/2025
Special inspection requirement — Chimneys and vents
Robert Germain Jr.
11/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
Robert Germain Jr.
11/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
11/10/2025
Special inspection requirement — Final
Robert Germain Jr.
11/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
11/07/2025
Filed — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN, RECONNECT EXISTING HOUSE SERVICE. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01168737-P2
11/07/2025
Filed — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN, RECONNECT EXISTING HOUSE SERVICE. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01168737-P3
11/07/2025
Filed — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN, RECONNECT EXISTING HOUSE SERVICE. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01168737-P1
10/22/2025
Signed off — Alteration
M08044270-I1
10/21/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/21/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/21/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/20/2025
Signed off — Alteration
M01161036-I1
05/14/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/12/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/16/2025
Filed — Alteration
MODIFY EXISTING FIRE SPRINKLER SYSTEM THROUGHOUT 7TH FLOOR APARTMENT TO PROVIDE PROPER COVERAGE FOR PARTITION CHANGES APPROVED UNDER ALTERATION #M01103256-I1.
M01103256-P1
04/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
04/11/2025
Special inspection requirement — Sprinkler Systems
Jeffrey Stones
04/09/2025
Permit issued — General Construction
M01168737-I1-GC
04/07/2025
Permit issued — Plumbing
M01168737-S1-PL
04/07/2025
Permit issued — Sprinklers
M01103256-S2-EW-SP
04/07/2025
Permit issued — Boiler Equipment
M01168737-S2-BE
04/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/26/2025
Permit issued — General Construction
M01161036-I1-GC-CX
03/17/2025
Filed — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN, RECONNECT EXISTING HOUSE SERVICE. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01168737-S2
03/14/2025
Filed — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN, RECONNECT EXISTING HOUSE SERVICE. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01168737-S1
03/14/2025
Filed — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN, RECONNECT EXISTING HOUSE SERVICE. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01168737-I1
03/11/2025
Objection resolved — Addressed
03/11/2025
Objection resolved — Addressed
Latest 60 of 196 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offUBERTO, LTD02/12/2026
DOB NOWGeneral ConstructionSigned-offC C CONTROLLED COMBUSTION04/09/2025
DOB NOWPlumbingSigned-offCC CONTROLLED PLBG CO.,IN04/07/2025
DOB NOWSprinklersSigned-offMASTER PLBG AND HTG INC04/07/2025
DOB NOWBoiler EquipmentSigned-offC C CONTROLLED COMBUSTION04/07/2025
DOB NOWGeneral ConstructionSigned-offCRYSTAL COMFORT03/26/2025
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS01/10/2025
DOB NOWMechanical SystemsSigned-offUBERTO, LTD12/05/2024
DOB NOWMechanical SystemsSigned-offUBERTO, LTD12/05/2024
DOB NOWGeneral ConstructionSigned-offCASTCAPA CONSTRUCTION10/12/2023
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC05/24/2023
DOB NOWMechanical SystemsPermit IssuedTHE METRO GROUP, INC02/09/2023
DOB NOWMechanical SystemsSigned-offCONDITIONING CONTROL SYST02/06/2023
DOB NOWGeneral ConstructionSigned-offCASTCAPA CONSTRUCTION10/12/2022
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC09/21/2022
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC09/22/2021
DOB NOWSprinklersSigned-offH M SPRINKLER INC05/26/2021
DOB NOWMechanical SystemsSigned-offTAFFERA FINE BUILDING AND04/23/2021
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS04/19/2021
DOB NOWMechanical SystemsSigned-offTAFFERA FINE BUILDING AND01/06/2021
DOB NOWSprinklersSigned-offH M SPRINKLER INC10/23/2020
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC09/25/2020
DOB NOWMechanical SystemsSigned-offTAFFERA FINE BUILDING AND08/11/2020
DOB NOWPlumbingSigned-offARCON PLBG SOLUTIONS07/28/2020
DOB NOWPlumbingSigned-offH M SPRINKLER INC07/28/2020
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC06/05/2020
BISOTISSUEDTAFFERA FINE BUILDING AND01/22/2021
BISOTISSUEDBAYSIDE CONTRACTING INC08/19/2020
BISOTISSUEDTAFFERA FINE BUILDING AND07/17/2020
BISOTISSUEDMICHAEL SLAVENCHINSKY INC.01/12/2017
BISOTISSUEDMICHAEL SLAVENCHINSKY INC.01/10/2017
BISOTISSUEDADELPHI RESTORATION CORP03/20/2012
BISEQISSUEDEVEREST SCAFFOLDING INC02/08/2012
BISSPISSUEDPLUMBING WORKS CORP02/11/2009
BISPLISSUEDBYPASS MECHANICAL CORP09/12/2008
BISEQISSUEDPERIMETER BRIDGE & SCAFFOLD04/18/2008
BISOTISSUEDLENNIE CONSTRUCTION CORP04/08/2008
BISOTISSUEDLENNIE CONSTRUCTION CORP04/08/2008
BISMHISSUEDLENNIE CONSTRUCTION CORP04/08/2008
BISOTISSUEDYORK RESTORATION CORP12/05/2007
+ 36 more permits on file
1 project · most recent 01/13/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/13/2026Signed-offUBERTO, LTDAir Conditioning Systems
Cooling
Bosch SV070-1HZN-FREPDD 6 tons · Ahu ×4
SV036-1HZN-FREPDD 3 tons · Ahu ×2
1 project · most recent 01/13/2026
FiledStatusContractorScope
01/13/2026Signed-offMASTER PLBG AND HTG INC12 heads
1 project · most recent 11/07/2025
Gas
FiledStatusContractorScope
11/07/2025Signed-offCC CONTROLLED PLBG CO.,INGas
6 projects · most recent 06/10/2025
General Wiring Lighting
FiledStatusContractorScope
06/10/2025CompleteY.S ELECTRICGeneral Wiring, Lighting
01/12/2025CompleteIMR ELECTRICAL CONTRACTINGeneral Wiring
01/15/2021CompleteE-J ELEC. INSTALLATION COGeneral Wiring
10/02/2020CompleteSRM ELECTRICAL SVCS INC—
07/06/2020CompleteSUPER CHARGED ELEC. INC.General Wiring
02/23/2020Permit IssuedBOROWIDE ELECT'L CONTR'S—
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
12/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/20/2025Pass-Final Boiler Equipment InspectionPassView ↗
11/12/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/21/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/14/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/12/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/17/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/24/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
03/02/2026HVAC-R and service water heating equipmentJeffrey Stonesenergy_progress
03/02/2026HVAC-R and service water piping design and insulationJeffrey Stonesenergy_progress
03/02/2026Lighting in dwelling unitsJeffrey Stonesenergy_progress
03/02/2026HVAC-R and service water heating system controlsJeffrey Stonesenergy_progress
03/02/2026FinalJeffrey Stonesprogress
03/02/2026Energy Code Compliance InspectionsJeffrey Stonesprogress
03/02/2026Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
03/02/2026Mechanical SystemsJeffrey Stonesspecial
01/13/2026Lighting in dwelling unitsJeffrey Stonesenergy_progress
01/13/2026Fire-Resistant Penetrations and JointsJeffrey Stonesspecial
01/13/2026Mechanical SystemsJeffrey Stonesspecial
01/13/2026Energy Code Compliance InspectionsJeffrey Stonesprogress
01/13/2026FinalJeffrey Stonesprogress
01/13/2026HVAC-R and service water heating system controlsJeffrey Stonesenergy_progress
01/13/2026HVAC-R and service water piping design and insulationJeffrey Stonesenergy_progress
01/13/2026HVAC-R and service water heating equipmentJeffrey Stonesenergy_progress
11/10/2025Tenant Protection Plan ComplianceRobert Germain Jr.special
11/10/2025Chimneys and ventsRobert Germain Jr.special
11/10/2025Tenant Protection Plan ComplianceRobert Germain Jr.special
11/10/2025Fire-Resistant Penetrations and JointsRobert Germain Jr.special
11/10/2025FinalRobert Germain Jr.progress
11/10/2025Fire-Resistant Penetrations and JointsRobert Germain Jr.special
04/14/2025Tenant Protection Plan Compliance—special
04/11/2025Sprinkler SystemsJeffrey Stonesspecial
03/06/2023FinalSALVATOR CARADONNAprogress
Latest 25 of 47.
▾Documents — 267 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch17
09/01/2026M08044270-I1Request digital key ↗
09/01/2026M08044243-I1Request digital key ↗
09/01/2026M00774763-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
09/05/2026M00246926-P2Request digital key ↗
08/15/2026M00246926-P1Request digital key ↗
08/14/2026M00246926-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00246926-P2Request digital key ↗
09/05/2026M00246926-P1Request digital key ↗
08/14/2026M00246926-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/03/2026M00246807-I1Request digital key ↗
08/14/2026M00246807-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/04/2026M00320692-P1Request digital key ↗
09/04/2026M00320692-I1Request digital key ↗
▸Applications & Permits41
▸BISPLAN / WORK APPROVAL APPLICATION25
08/03/2022123300329Open ↗
08/02/2022123300329Open ↗
06/30/2022123300329Open ↗
Showing 3 of 25 on file for this type
▸BISWORK PERMIT APPLICATION12
06/04/2021123300329Open ↗
06/01/2021123300329Open ↗
01/25/2021123791487Open ↗
Showing 3 of 12 on file for this type
▸BISSIDEWALK SHED APPLICATION & PERMIT1
08/19/2020123300329Open ↗
▸BISSCAFFOLD APPLICATION & PERMIT1
08/19/2020123300329Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
05/20/2013120968382Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
09/15/2021102927362Open ↗
▸Seals & Professional Certifications75
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/04/2026M00320692-I1Open ↗
09/03/2026M00246807-I1Open ↗
09/03/2026M00246807-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
08/29/2026M08044243-I1Open ↗
08/28/2026M00246807-I1Open ↗
08/28/2026M00246807-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/02/2026M01168737-S1Open ↗
09/02/2026M01168737-S1Open ↗
08/29/2026M00246926-P2Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
02/17/2021102134334Open ↗
01/11/2021102134334Open ↗
11/30/2020123791487Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
02/08/2012120968382Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
02/08/2012120968382Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
02/17/2021102134334Open ↗
02/17/2021102134334Open ↗
02/17/2021102134334Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection12
▸DOB NOWTenant Protection Plan7
09/04/2026M00320692-I1Open ↗
08/13/2026M00246926-P2Open ↗
08/13/2026M00246926-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTenant Protection Plan and Notes3
08/08/2017123300329Open ↗
04/26/2016122757258Open ↗
08/21/2020123791487Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
08/05/2022123300329Open ↗
12/30/2019123791487Open ↗
▸Environmental & Asbestos30
▸DOB NOWDEP ACP-5: Asbestos Assessment Report20
09/03/2026M00246807-I1Open ↗
09/01/2026M08044243-I1Open ↗
08/25/2026M01161036-I1Open ↗
Showing 3 of 20 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
02/17/2021102134334Open ↗
03/03/2020123791487Open ↗
01/07/2020123791487Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
09/29/2011120827953Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
12/30/2019123791487Open ↗
08/11/2017123300329Open ↗
08/08/2017123300329Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
08/09/2022123300329Open ↗
05/19/2017122757258Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/09/2022123300329Open ↗
▸BISLIGHTING IN DWELLING UNITS1
01/25/2022123791487Open ↗
▸BISTECHNICAL REPORT: ENERGY1
02/27/2012120827953Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/25/2022123791487Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY9
08/09/2022123300329Open ↗
08/01/2022123300329Open ↗
01/25/2022123791487Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
02/10/2012120827953Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
01/25/2022123791487Open ↗
▸BISPOST-INSTALLED ANCHORS1
01/25/2022123791487Open ↗
▸Approvals, Objections & Sign-offs12
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
08/10/2022123300329Open ↗
01/26/2022123791487Open ↗
09/15/2021102927362Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
09/07/2012121362649Open ↗
02/08/2012120968382Open ↗
09/29/2011120827953Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/25/2021123791487Open ↗
05/19/2017122757258Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT11
08/09/2022123300329Open ↗
07/07/2022123300329Open ↗
06/29/2022123300329Open ↗
Showing 3 of 11 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
01/25/2022123791487Open ↗
▸Filing & Intake Forms22
▸BISADDITIONAL INFORMATION11
08/05/2022123300329Open ↗
08/21/2020123791487Open ↗
06/30/2020123791487Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET6
12/30/2019123791487Open ↗
08/08/2017123300329Open ↗
04/26/2016122757258Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM5
06/04/2021123300329Open ↗
06/01/2021123300329Open ↗
01/25/2021123791487Open ↗
Showing 3 of 5 on file for this type
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
06/04/2021123300329Open ↗
01/11/2021102134334Open ↗
01/11/2021102134334Open ↗
Showing 3 of 5 on file for this type