Walk-up cooperative
400 Central Park West Condominium
207 PARK PLACE · BIN 3028746
💬 Discuss this project
1901Year Built
4Stories
C6Building Class
R6BZoning
12,572 sfGross Floor Area
10Units
Rent Stabilized20 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 207 PARK TENANTS CORP · 4,978 sf lot · 2.53 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 10 docs
Floor 31p · 1 filing · 10 docs
Floor 2
Floor 1
Cellar1p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
400 CENTRAL PARK WEST CONDOMINIUM307/08/2026
207 PARK TENANTS CORP103/22/2026
207 PARK PLACE TENANTS303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADAL ENGINEERING PLLC112/07/2023
J M ARCHITECTURE PLLC407/29/2021
BAZINI ENGINEERING, P.C.101/02/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GAMILL ENGINEERING, PC803/21/2026
BIG ORANGE EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.M.N. CORPORATIONPlumbing407/08/2026
ZAP INTERIORS INCGeneral Contractor107/08/2026
BYPASS MECHANICAL CORPPlumbing107/08/2026
CHAMP PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ADAL ENGINEERING PLLC4205112/07/2023
SPECIAL INSPECTION SERVIC1200207/29/2021
BAZINI ENGINEERING, P.C.1808101/02/2020
Building Lifecycle
All (97)Filed (6)Permit Issued (4)Signed Off (3)Violation (60)Inspection (7)Objection (8)Special Inspection (9)
05/05/2026
Violation issued (HPD, closed)
A
11/20/2025
Violation issued (HPD, closed)
I
05/27/2025
Violation issued (HPD, open)
A
05/27/2025
Violation issued (HPD, open)
B
05/27/2025
Violation issued (HPD, open)
A
05/27/2025
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, closed)
I
08/30/2024
Violation issued (HPD, open)
A
08/30/2024
Violation issued (HPD, open)
B
08/12/2024
Violation issued (HPD, open)
C
08/12/2024
Violation issued (HPD, open)
B
08/12/2024
Violation issued (HPD, open)
B
06/25/2024
Violation issued (HPD, closed)
C
05/20/2024
Violation issued (HPD, closed)
C
05/20/2024
Violation issued (HPD, open)
B
05/20/2024
Violation issued (HPD, closed)
A
05/20/2024
Violation issued (HPD, open)
B
04/29/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/23/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/22/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/27/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/16/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/13/2023
Permit issued — Plumbing
B00962314-I1-PL
12/07/2023
Filed — Alteration
PLUMBING WORK AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00962314-I1
12/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dariusz Makara
12/07/2023
Special inspection requirement — HVAC-R and service water heating system controls
Dariusz Makara
12/07/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Dariusz Makara
12/07/2023
Special inspection requirement — HVAC-R and service water heating equipment
Dariusz Makara
11/14/2023
Special inspection requirement — Tenant Protection Plan Compliance
Dariusz Makara
09/17/2023
Violation issued (HPD, closed)
B
09/17/2023
Violation issued (HPD, closed)
A
02/25/2023
Violation issued (HPD, closed)
B
02/25/2023
Violation issued (HPD, closed)
B
02/07/2023
Violation issued (HPD, closed)
B
02/07/2023
Violation issued (HPD, closed)
B
11/14/2022
Violation issued (HPD, closed)
I
03/01/2022
Violation issued (HPD, closed)
A
03/01/2022
Violation issued (HPD, closed)
I
11/26/2021
Signed off — Alteration
REMOVE EXISTING POWDER ROOM. NEW PARTITIONS, FLOORING, PLUMBING FIXTURES & FINISHES IN NEW BATHROOM. PLUMBING FILED UNDER A SEPARATE APPLICATION.
B00526811-I1
11/26/2021
Signed off — Alteration
NEW TUB, LAV & TOILET IN NEW BATHROOM. REPLACE TOILET IN EXISTING BATHROOM.
B00526901-I1
09/29/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/18/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/04/2021
Objection resolved — Addressed
08/03/2021
Objection raised — Scope
07/29/2021
Filed — Alteration
NEW TUB, LAV & TOILET IN NEW BATHROOM. REPLACE TOILET IN EXISTING BATHROOM.
B00526901-P1
07/29/2021
Filed — Alteration
REMOVE EXISTING POWDER ROOM. NEW PARTITIONS, FLOORING, PLUMBING FIXTURES & FINISHES IN NEW BATHROOM. PLUMBING FILED UNDER A SEPARATE APPLICATION.
B00526811-P1
07/28/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Joanne Robinson
07/28/2021
Special inspection requirement — Lighting in dwelling units
Joanne Robinson
07/28/2021
Special inspection requirement — Final
Joanne Robinson
07/28/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
06/30/2021
Permit issued — Plumbing
B00526901-I1-PL
06/24/2021
Permit issued — General Construction
B00526811-I1-GC
05/24/2021
Objection raised — Scope
05/24/2021
Objection resolved — Addressed
05/24/2021
Objection raised — Scope
05/24/2021
Objection resolved — Addressed
05/24/2021
Objection raised — Fire_Protection
05/24/2021
Objection resolved — Addressed
05/21/2021
Filed — Alteration
REMOVE EXISTING POWDER ROOM. NEW PARTITIONS, FLOORING, PLUMBING FIXTURES & FINISHES IN NEW BATHROOM. PLUMBING FILED UNDER A SEPARATE APPLICATION.
B00526811-I1
05/21/2021
Filed — Alteration
NEW TUB, LAV & TOILET IN NEW BATHROOM. REPLACE TOILET IN EXISTING BATHROOM.
B00526901-I1
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA.M.N. CORPORATION12/13/2023
DOB NOWPlumbingSigned-offBYPASS MECHANICAL CORP06/30/2021
DOB NOWGeneral ConstructionSigned-offZAP INTERIORS INC06/24/2021
DOB NOWPlumbingSigned-offCHAMP PLUMBING & HTG CORP01/03/2020
BISBLISSUEDAPPROVED OIL OF BKLYN,INC01/21/2009
BISPLISSUEDDYNAMIC CONTRACTING CORP01/21/2009
BISPLISSUEDACTION MECH INC07/10/2006
BISBLISSUEDS.J. FUEL CO., INC08/06/1997
1 project · most recent 12/07/2023
Gas
FiledStatusContractorScope
12/07/2023Signed-offA.M.N. CORPORATIONGas
2 projects · most recent 05/18/2023
General Wiring
FiledStatusContractorScope
05/18/2023Permit IssuedGT ELECTRICAL COMPANY INCGeneral Wiring
08/23/2022CompleteE & M ELECTRICAL NY CORPGeneral Wiring
1 project · most recent 12/07/2023
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
12/07/2023Signed-offA.M.N. CORPORATIONTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/22/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/29/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/18/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
12/07/2023Fire-Resistant Penetrations and JointsDariusz Makaraspecial
12/07/2023HVAC-R and service water heating system controlsDariusz Makaraenergy_progress
12/07/2023HVAC-R and service water piping design and insulationDariusz Makaraenergy_progress
12/07/2023HVAC-R and service water heating equipmentDariusz Makaraenergy_progress
11/14/2023Tenant Protection Plan ComplianceDariusz Makaraspecial
07/28/2021HVAC-R and service water piping design and insulationJoanne Robinsonenergy_progress
07/28/2021Lighting in dwelling unitsJoanne Robinsonenergy_progress
07/28/2021FinalJoanne Robinsonprogress
07/28/2021Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
09/01/2026B00526901-I1Request digital key ↗
09/01/2026B00526811-P1Request digital key ↗
08/26/2026B00962314-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00285692-I1Request digital key ↗
▸Applications & Permits12
▸DOB NOWLPC Approval/Permit6
09/01/2026B00526811-P1Open ↗
08/14/2026B00526811-I1Open ↗
08/13/2026B00962314-I1Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION3
01/21/2009310232236Open ↗
01/21/2009310232236Open ↗
01/21/2009310232236Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION3
04/07/2009310232236Open ↗
04/01/2009310232236Open ↗
12/03/2008310232236Open ↗
▸Seals & Professional Certifications15
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00526901-P1Open ↗
09/01/2026B00526901-I1Open ↗
09/01/2026B00526811-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B00526811-P1Open ↗
09/01/2026B00526811-P1Open ↗
08/25/2026B00526901-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B00526811-P1Open ↗
08/22/2026B00962314-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/03/2008310232236Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/03/2008310232236Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
12/03/2008310232236Open ↗
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING3
04/07/2009310232236Open ↗
04/01/2009310232236Open ↗
12/03/2008310232236Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
12/03/2008310232236Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026B00285692-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/01/2026B00526901-I1Open ↗
09/01/2026B00526811-P1Open ↗
08/14/2026B00526901-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/03/2008310232236Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/14/2026B00526811-I1Open ↗
08/13/2026B00526901-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
12/03/2008310232236Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
12/03/2008310232236Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
12/03/2008310232236Open ↗