2077 RYER AVENUE
BRONX · BIN 2131069
💬 Discuss this project
2024Year Built
12Stories
D1Building Class
R8Zoning
79,287 sfGross Floor Area
93Units
Rent Stabilized13 Open Violations ▸
Elevator apt, semi-fireproof without stores · Owner of record: VAJA GROUP RIDER HOLDINGS LLC · 8,133 sf lot · 9.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof4p · 2 filings · 6 docs
Bulkhead2p · 1 filing · 4 docs
Floor 121p · 1 filing · 4 docs
Floor 111p · 1 filing · 4 docs
Floor 10143p · 2 filings · 20 docs
Floor 9142p · 2 filings · 20 docs
Floor 8141p · 2 filings · 20 docs
Floor 7142p · 2 filings · 20 docs
Floor 6141p · 2 filings · 20 docs
Floor 5143p · 2 filings · 20 docs
Floor 4143p · 2 filings · 20 docs
Floor 3143p · 2 filings · 20 docs
Floor 2142p · 2 filings · 20 docs
Floor 1145p · 3 filings · 20 docs
Cellar144p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WESTORCHARD MANAGEMENT507/08/2026
VAJA GROUP7007/08/2026
DORIA407/08/2026
REAL LAND GROUP407/08/2026
OWNER'S REP703/22/2026
VAJA GROUP RIDER HOLDINGS LLC103/22/2026
CITY WIDE BUILDERS GRP IN1103/22/2026
BUILDERS GRP IN CITY WIDE103/22/2026
CITY WIDE BUILDERS203/22/2026
ANTHONY PARTNERS203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/01/2022$1.8M—— → —— not available
09/09/2016$700K—— → —— not available
03/21/2014$382K—Private party → STG BRONX REALTY LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNSHINE PLAZA LLC1903/21/2026
GREEN STUDIO203/21/2026
XPDITE GROUP LLC (104)203/21/2026
THE GREEN STUDIO303/21/2026
MILLENNIUM DESIGNS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CITY WIDE BUILDERS GRP INGeneral Contractor3007/08/2026
GWT ENTERPRISES INCGeneral Contractor507/08/2026
TARGET PIPING NY LLCFire Protection207/08/2026
S WIEDER ARCHITECT P CGeneral Contractor203/22/2026
REAL LAND GROUP LLCGeneral Contractor107/08/2026
SOLAS ELECTRICAL CORPElectrical103/22/2026
MPI PLUMBING CORPPlumbing107/08/2026
STAR ELEC'L CONTRACTORS CElectrical103/22/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
MANHATTAN D ENTERPRISESGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA91681705/04/2026
SKYLINE RIGGING7880108/01/2024
TROLYDIA TESTING & INSPEC4422105/19/2022
Building Lifecycle
All (205)Filed (28)Permit Issued (20)Signed Off (15)Violation (12)Inspection (21)Objection (79)Special Inspection (30)
05/11/2026
Signed off — New Building
Temporary Standpipe Work Type filed in conjunction with NB GC#X00707697-I1
X00707697-I1
05/04/2026
Filed — New Building
Temporary Standpipe Work Type filed in conjunction with NB GC#X00707697-I1
X00707697-A3
01/30/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/11/2025
Objection resolved — Addressed
12/10/2025
Objection raised — Admin
12/03/2025
Filed — New Building
Temporary Standpipe Work Type filed in conjunction with NB GC#X00707697-I1
X00707697-A6
12/03/2025
Special inspection requirement — Fenestration air leakage
Soorjbally Harilall
12/03/2025
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
12/03/2025
Special inspection requirement — Air barrier continuity plan testing
Soorjbally Harilall
12/03/2025
Special inspection requirement — Lighting in dwelling units
Soorjbally Harilall
12/03/2025
Special inspection requirement — Exterior lighting power
Soorjbally Harilall
12/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
12/03/2025
Special inspection requirement — Lighting controls
Soorjbally Harilall
12/03/2025
Special inspection requirement — Metering
Soorjbally Harilall
12/03/2025
Special inspection requirement — Interior lighting power
Soorjbally Harilall
12/03/2025
Special inspection requirement — Electrical motors and elevators
Soorjbally Harilall
12/03/2025
Special inspection requirement — Protection of exposed foundation insulation
Soorjbally Harilall
12/03/2025
Special inspection requirement — Fenestration areas
Soorjbally Harilall
12/03/2025
Special inspection requirement — Maintenance information
Soorjbally Harilall
12/03/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Soorjbally Harilall
12/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
12/03/2025
Special inspection requirement — Air barrier - visual inspection
Soorjbally Harilall
12/03/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Soorjbally Harilall
12/03/2025
Special inspection requirement — Insulation placement and R values
Soorjbally Harilall
09/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/27/2025
Signed off — New Building
Temporary Standpipe Work Type filed in conjunction with NB GC#X00707697-I1
X00707697-S1
08/21/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/10/2025
Special inspection requirement — Interior lighting power
Soorjbally Harilall
07/10/2025
Special inspection requirement — Insulation placement and R values
Soorjbally Harilall
07/10/2025
Special inspection requirement — Exterior lighting power
Soorjbally Harilall
07/10/2025
Special inspection requirement — Metering
Soorjbally Harilall
07/10/2025
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
07/10/2025
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
07/10/2025
Special inspection requirement — Fenestration air leakage
Soorjbally Harilall
07/10/2025
Special inspection requirement — Fenestration areas
Soorjbally Harilall
07/10/2025
Special inspection requirement — Protection of exposed foundation insulation
Soorjbally Harilall
07/10/2025
Special inspection requirement — Maintenance information
Soorjbally Harilall
07/10/2025
Special inspection requirement — Air barrier - visual inspection
Soorjbally Harilall
07/10/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Soorjbally Harilall
07/09/2025
Objection raised — Admin
07/09/2025
Objection resolved — Addressed
07/07/2025
Filed — New Building
Temporary Standpipe Work Type filed in conjunction with NB GC#X00707697-I1
X00707697-A1
05/08/2025
Signed off — New Building
Temporary Standpipe Work Type filed in conjunction with NB GC#X00707697-I1
X00707697-S4
05/07/2025
Signed off — New Building
Temporary Standpipe Work Type filed in conjunction with NB GC#X00707697-I1
X00707697-S2
04/29/2025
Signed off — New Building
Temporary Standpipe Work Type filed in conjunction with NB GC#X00707697-I1
X00707697-S3
03/24/2025
Filed — New Building
Temporary Standpipe Work Type filed in conjunction with NB GC#X00707697-I1
X00707697-P9
03/03/2025
Objection raised — Other
02/27/2025
Objection resolved — Addressed
02/10/2025
Signed off — New Building
Temporary Standpipe Work Type filed in conjunction with NB GC#X00707697-I1
X00707697-S7
02/10/2025
Signed off — Alteration
FOUNDATION & EARTHWORK FILED IN CONJUNCTION TO NEW BUILDING APPLICATION X00707697-I1
X00728156-I1
02/05/2025
Signed off — Alteration
SOE, filed in conjunction with NB# X00707697-I1
X00953124-I1
02/05/2025
Filed — Alteration
FOUNDATION & EARTHWORK FILED IN CONJUNCTION TO NEW BUILDING APPLICATION X00707697-I1
X00728156-P2
02/05/2025
Signed off — Alteration
Structural work filed in conjunction with NB job number X00707697-I1.
X01011080-I1
01/21/2025
Objection raised — Other
01/20/2025
Filed — New Building
Temporary Standpipe Work Type filed in conjunction with NB GC#X00707697-I1
X00707697-P7
01/20/2025
Filed — New Building
Temporary Standpipe Work Type filed in conjunction with NB GC#X00707697-I1
X00707697-P8
01/03/2025
Inspection — Pass-Final SP - More than 10 Requested Floors
Pass
View inspection ↗
12/17/2024
Inspection — Pass-Final SP - More than 10 Requested Floors
Pass
View inspection ↗
12/13/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/09/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 205 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offCITY WIDE BUILDERS GRP IN09/06/2024
DOB NOWStandpipeSigned-offTARGET PIPING NY LLC08/27/2024
DOB NOWSprinklersSigned-offTARGET PIPING NY LLC08/27/2024
DOB NOWSuspended ScaffoldSigned-offDORIA, INC08/20/2024
DOB NOWGeneral ConstructionPermit IssuedCITY WIDE BUILDERS GRP IN07/05/2024
DOB NOWConstruction FenceSigned-offCITY WIDE BUILDERS GRP IN05/21/2024
DOB NOWGeneral ConstructionPermit IssuedCITY WIDE BUILDERS GRP IN05/16/2024
DOB NOWGeneral ConstructionPermit IssuedCITY WIDE BUILDERS GRP IN04/19/2024
DOB NOWMechanical SystemsSigned-offCITY WIDE BUILDERS GRP IN04/01/2024
DOB NOWStructuralSigned-offCITY WIDE BUILDERS GRP IN03/21/2024
DOB NOWStandpipeSigned-offA M B MECHANICAL INC03/15/2024
DOB NOWSidewalk ShedSigned-offGWT ENTERPRISES INC02/23/2024
DOB NOWSupported ScaffoldSigned-offGWT ENTERPRISES INC02/23/2024
DOB NOWPlumbingSigned-offYG SERVICES INC02/01/2024
DOB NOWProtection and Mechanical MethodsSigned-offGWT ENTERPRISES INC01/24/2024
DOB NOWFoundationSigned-offCITY WIDE BUILDERS GRP IN11/14/2023
DOB NOWSupport of ExcavationSigned-offCITY WIDE BUILDERS GRP IN11/08/2023
DOB NOWConstruction FenceSigned-offCITY WIDE BUILDERS GRP IN04/26/2023
DOB NOWFoundationSigned-offREAL LAND GROUP LLC05/26/2022
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES05/05/2022
1 project · most recent 05/04/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/04/2026Signed-offCITY WIDE BUILDERS GRP INAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Amana PTH123G25PV 12,000 BTU · Ptac ×2
PTH153G25PV 15,000 BTU · Ptac ×2
Daikin RXYQ240TTJU 228,000 BTU · Vrf Outdoor ×2
Heating
Amana PTH123G25PV 6,800 BTU · Ptac ×2
PTH153G25PV 9,900 BTU · Ptac ×2
Ventilation
Titus CER-LP-R-II M#18622Lp 50 CFM · Other ×3
1 project · most recent 05/04/2026
Sprinkler System
FiledStatusContractorScope
05/04/2026Signed-offTARGET PIPING NY LLCSprinkler System
1 project · most recent 05/04/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/04/2026Signed-offYG SERVICES INCGas, Storm, Water/Sanitary
7 projects · most recent 03/23/2026
General Wiring
FiledStatusContractorScope
03/23/2026CompleteACCURATE ELEC'L CORP.General Wiring
03/31/2025CompleteACCURATE ELEC'L CORP.95 meters, 95 new_meters
06/06/2024CompleteSTAR ELEC'L CONTRACTORS C—
04/18/2024CompleteSOLAS ELECTRICAL CORP—
02/29/2024CompleteSOLAS ELECTRICAL CORP—
01/10/2024CompleteSOLAS ELECTRICAL CORP—
05/11/2022CompleteSOLAS ELECTRICAL CORP—
1 project · most recent 05/04/2026
Concrete
FiledStatusContractorScope
05/04/2026Signed-offCITY WIDE BUILDERS GRP INConcrete
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
01/30/2026Pass-Final CND-Occupancy InspectionPassView ↗
09/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/21/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
01/03/2025Pass-Final SP - More than 10 Requested FloorsPassView ↗
12/17/2024Pass-Final SP - More than 10 Requested FloorsPassView ↗
12/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/04/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
10/30/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/07/2024Fail-Final SD - More than 10 Requested FloorsFailView ↗
09/19/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/27/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
08/01/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/30/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/10/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/27/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
03/27/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
03/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/27/2024Pass-Final PL - UndergroundPassView ↗
02/22/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 108
DateRequirementInspectorRole
12/03/2025Fire-Resistance Rated ConstructionSoorjbally Harilallprogress
12/03/2025Interior lighting powerSoorjbally Harilallenergy_progress
12/03/2025Air barrier - visual inspectionSoorjbally Harilallenergy_progress
12/03/2025Exterior lighting powerSoorjbally Harilallenergy_progress
12/03/2025Protection of exposed foundation insulationSoorjbally Harilallenergy_progress
12/03/2025Fenestration areasSoorjbally Harilallenergy_progress
12/03/2025Lighting controlsSoorjbally Harilallenergy_progress
12/03/2025Energy Code Compliance InspectionsSoorjbally Harilallprogress
12/03/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
12/03/2025MeteringSoorjbally Harilallenergy_progress
12/03/2025Insulation placement and R valuesSoorjbally Harilallenergy_progress
12/03/2025Exterior Insulation and Finish Systems (EIFS)Soorjbally Harilallspecial
12/03/2025Air barrier continuity plan testingSoorjbally Harilallenergy_progress
12/03/2025Fenestration and door U-factor and product ratingsSoorjbally Harilallenergy_progress
12/03/2025Maintenance informationSoorjbally Harilallenergy_progress
12/03/2025Electrical motors and elevatorsSoorjbally Harilallenergy_progress
12/03/2025Fenestration air leakageSoorjbally Harilallenergy_progress
12/03/2025Lighting in dwelling unitsSoorjbally Harilallenergy_progress
07/10/2025Air barrier continuity plan testingSoorjbally Harilallenergy_progress
07/10/2025Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
07/10/2025Exterior Insulation and Finish Systems (EIFS)Soorjbally Harilallspecial
07/10/2025Fire-Resistance Rated ConstructionSoorjbally Harilallprogress
07/10/2025Energy Code Compliance InspectionsSoorjbally Harilallprogress
07/10/2025Fenestration air leakageSoorjbally Harilallenergy_progress
07/10/2025Fenestration areasSoorjbally Harilallenergy_progress
Latest 25 of 108.
▾Documents — 158 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch28
08/24/2026X00699680-I1Request digital key ↗
08/24/2026X00730107-I1Request digital key ↗
08/24/2026X00741254-I1Request digital key ↗
Showing 3 of 28 on file for this type
▸Applications & Permits4
▸BISBPP-5 - Authorization to the Department of Transportation3
09/27/2024240359321Open ↗
09/26/2024240359321Open ↗
04/17/2024240359321Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
04/17/2024240359321Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram6
08/16/2026X00707697-P9Open ↗
08/16/2026X00707697-A3Open ↗
08/16/2026X00707697-A1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)2
08/16/2026X00707697-A3Open ↗
08/16/2026X00707697-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026X00707697-I1Open ↗
▸Seals & Professional Certifications70
▸DOB NOWDPL-1: Design Professional Seal & Signature28
08/24/2026X00699680-I1Open ↗
08/24/2026X00730107-I1Open ↗
08/24/2026X00741254-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
09/02/2026X00707697-S4Open ↗
09/02/2026X00728156-P1Open ↗
09/02/2026X00707697-S4Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/27/2026X00707697-P8Open ↗
09/02/2026X00728156-P1Open ↗
09/02/2026X00707697-S4Open ↗
Showing 3 of 19 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/17/2024240359321Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/17/2024240359321Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/16/2026X00707697-A1Open ↗
08/16/2026X00707697-P7Open ↗
08/16/2026X00707697-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/16/2026X00707697-I1—
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist6
08/16/2026X00707697-P7Open ↗
08/16/2026X00707697-A3Open ↗
08/16/2026X00707697-A1Open ↗
Showing 3 of 6 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
09/23/2024240359321Open ↗
▸BISSTREET TREE CHECKLIST1
04/17/2024240359321Open ↗
▸DOB NOWStreet Trees Site Plan1
08/16/2026X00707697-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/16/2026X00707697-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/16/2026X00707697-I1Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026X00707697-S2Open ↗
08/13/2026X00707697-S4Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/16/2026X00707697-I1Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
08/20/2024240359321Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/17/2024240359321Open ↗
▸Other Documents25
▸DOB NOWSite Survey: Initial6
08/16/2026X00707697-I1Open ↗
08/16/2026X00707697-A3Open ↗
08/16/2026X00707697-A1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/16/2026X00707697-P9Open ↗
08/16/2026X00707697-I1Open ↗
08/16/2026X00707697-A3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification6
08/16/2026X00707697-A3Open ↗
08/16/2026X00707697-A1Open ↗
08/16/2026X00707697-P9Open ↗
Showing 3 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
09/27/2024240359321Open ↗
08/20/2024240359321Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026X00728156-I1Open ↗
08/13/2026X00953124-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026X01090026-I1Open ↗
▸DOB NOWFinal Survey1
08/16/2026X00707697-I1Open ↗
▸DOB NOWCalculations1
08/13/2026X01090026-I1Open ↗