← Back
BuildNYC
Elevator apt, miscellaneous
208-11 26TH AVENUE
QUEENS · BIN 4130866
💬 Discuss this project
1981Year Built
4Stories
D9Building Class
R5Zoning
124,877 sfGross Floor Area
150Units
LL97 CoveredRent Stabilized0 Active ViolationsFDNY Report ↗
Elevator apt, miscellaneous · Owner of record: Selfhelp Housing Development Fund Corp As Nominee · 116,400 sf lot · 1.07 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof6469 Broadway Selfhelp LLC19p · 4 filings · 20 docs
Floor 4Selfhelp Realty Group61p · 3 filings · 20 docs
Floor 3Selfhelp Realty Group61p · 3 filings · 20 docs
Floor 2Selfhelp Realty Group62p · 3 filings · 20 docs
Floor 16469 Broadway Selfhelp LLC67p · 4 filings · 20 docs
CellarSelfhelp Realty Group41p · 4 filings · 20 docs
Sub-BasementEquipment and antenna removal1 filing · 6 docs
Site & exteriorScheuer House39p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Selfhelp (K1-K11) Associates3007/08/2026
6469 Broadway Selfhelp503/22/2026
S.H. Housing Development Fund503/21/2026
Ben Dan Co303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Urban Architectural Initiatives RA504/05/2024
Grant207/12/2023
New York & Company812/22/2022
BKH Architect211/21/2022
Rand Engineering & Architecture110/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB Building Consulting1003/21/2026
New York & Company1603/21/2026
Construction Permit Services203/21/2026
Rand Engineering & Arch203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
King Rose of NYGeneral Contractor707/08/2026
Unique Mechanicalspecialty_contractor303/21/2026
Guaranteed Home ImprovemeGeneral Contractor303/21/2026
Yates Restoration GroupGeneral Contractor203/21/2026
Ace-Atlas Plbing & HeatingPlumbing207/08/2026
Watch Hill Wireless SoluGeneral Contractor107/08/2026
RNH Electric CompanyElectrical103/21/2026
Access PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI Agency254112/18/2023
Grant Engineering Consulting3512207/12/2023
Domani Inspection Service843212/30/2022
BKH Architect6255211/21/2022
New York Engineering Associates851510/04/2022
Rand Engineering & Architects266110/13/2021
Building Lifecycle
All (147)Filed (18)Permit Issued (14)Signed Off (9)Violation (60)Inspection (8)Objection (8)Special Inspection (30)
03/11/2026
Violation issued (FDNY_NOV, closed)
10/31/2025
Violation issued (HPD, closed)
A
10/31/2025
Violation issued (HPD, closed)
C
10/31/2025
Violation issued (HPD, closed)
B
10/31/2025
Violation issued (HPD, closed)
A
04/11/2025
Signed off — Alteration
PROPOSE TO REPLACE AND RELOCATE EXISTING PLUMBING FIXTURES IN EIGHT (8) APARTMENT UNITS W/ NEW ADA COMPLIANT PLUMBINGFIXTURES, PARTIAL REPLACEMENT OF PLUMBING ROUGHIN AND TO ADD A NEW PUBLIC TOILET, FILED IN CONJUNCTIONWITH DOB NOW GC #Q08050499-I1
Q08051077-I1
04/07/2025
Signed off — Alteration
Q00532875-I1
02/18/2025
Signed off — Alteration
PROPOSE TO UPGRADE ADA COMPLIANT BATHROOM & KITCHEN ON EXISTING APARTMENTS. ERECT NEW MINOR PARTITONS, FINSH WORKS, 1 NEW PUBLIC TOLIET ON 1ST FL, MINOR EXTERIOR WORK ON PARKING AREA AS PER PLAN. PL FILED SEPARATELY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Q08050499-I1
01/16/2025
Violation issued (HPD, closed)
C
01/16/2025
Violation issued (HPD, closed)
B
12/27/2024
Violation issued (HPD, closed)
C
11/12/2024
Permit issued — General Construction
Q08050499-I1-GC
05/13/2024
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
04/30/2024
Special inspection requirement — Tenant Protection Plan Compliance
JOHN MCMONAGLE
04/30/2024
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
04/30/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
04/05/2024
Filed — Alteration
PROPOSE TO REPLACE AND RELOCATE EXISTING PLUMBING FIXTURES IN EIGHT (8) APARTMENT UNITS W/ NEW ADA COMPLIANT PLUMBINGFIXTURES, PARTIAL REPLACEMENT OF PLUMBING ROUGHIN AND TO ADD A NEW PUBLIC TOILET, FILED IN CONJUNCTIONWITH DOB NOW GC #Q08050499-I1
Q08051077-P3
04/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MAURICIO ANDRADE
04/04/2024
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
04/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MAURICIO ANDRADE
04/04/2024
Special inspection requirement — Tenant Protection Plan Compliance
03/26/2024
Inspection — Fail-Final PL - Up to 9 Requested Floors
Fail
View inspection ↗
03/01/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/01/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/12/2024
Filed — Alteration
PROPOSE TO REPLACE AND RELOCATE EXISTING PLUMBING FIXTURES IN EIGHT (8) APARTMENT UNITS W/ NEW ADA COMPLIANT PLUMBINGFIXTURES, PARTIAL REPLACEMENT OF PLUMBING ROUGHIN AND TO ADD A NEW PUBLIC TOILET, FILED IN CONJUNCTIONWITH DOB NOW GC #Q08050499-I1
Q08051077-P2
02/06/2024
Special inspection requirement — Tenant Protection Plan Compliance
02/06/2024
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
02/06/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MAURICIO ANDRADE
02/01/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/04/2024
Special inspection requirement — Fenestration air leakage
JOHN MCMONAGLE
01/04/2024
Special inspection requirement — Fenestration areas
JOHN MCMONAGLE
01/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
01/04/2024
Special inspection requirement — Vestibules
JOHN MCMONAGLE
01/04/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHN MCMONAGLE
01/04/2024
Special inspection requirement — Tenant Protection Plan Compliance
JOHN MCMONAGLE
01/04/2024
Special inspection requirement — Final
JOHN MCMONAGLE
01/04/2024
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
01/04/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN MCMONAGLE
01/04/2024
Special inspection requirement — Air barrier — testing
JOHN MCMONAGLE
01/04/2024
Special inspection requirement — Lighting in dwelling units
JOHN MCMONAGLE
12/18/2023
Filed — Alteration
PROPOSE TO UPGRADE ADA COMPLIANT BATHROOM & KITCHEN ON EXISTING APARTMENTS. ERECT NEW MINOR PARTITONS, FINSH WORKS, 1 NEW PUBLIC TOLIET ON 1ST FL, MINOR EXTERIOR WORK ON PARKING AREA AS PER PLAN. PL FILED SEPARATELY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Q08050499-P1
12/15/2023
Violation issued (ECB, closed)
Construction
12/15/2023
Violation issued (ECB, closed)
Construction
12/15/2023
Violation issued (ECB, closed)
Construction
12/15/2023
Special inspection requirement — Lighting in dwelling units
MAURICIO ANDRADE
12/15/2023
Special inspection requirement — Air barrier — testing
MAURICIO ANDRADE
12/15/2023
Special inspection requirement — Fenestration air leakage
MAURICIO ANDRADE
12/15/2023
Special inspection requirement — Fenestration areas
MAURICIO ANDRADE
12/15/2023
Special inspection requirement — Vestibules
MAURICIO ANDRADE
12/15/2023
Special inspection requirement — Energy Code Compliance Inspections
MAURICIO ANDRADE
12/15/2023
Special inspection requirement — Tenant Protection Plan Compliance
12/15/2023
Special inspection requirement — Final
MAURICIO ANDRADE
12/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
11/09/2023
Permit issued — General Construction
Q08050499-I1-GC
10/06/2023
Permit issued — Plumbing
Q08051077-I1-PL
09/07/2023
Permit issued — General Construction
Q08050499-I1-GC
08/03/2023
Signed off — Alteration
Decommission of existing Sprint site. Remove antennas and equipment from the roof and equipment room at grade. Shelter to remain. Service connection in basement. Initial installation approved under application #402493324
Q00699697-I1
07/12/2023
Filed — Alteration
Decommission of existing Sprint site. Remove antennas and equipment from the roof and equipment room at grade. Shelter to remain. Service connection in basement. Initial installation approved under application #402493324
Q00699697-P1
05/19/2023
Violation issued (HPD, closed)
C
05/19/2023
Violation issued (HPD, closed)
C
Latest 60 of 147 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKing Rose of NY11/12/2024
DOB NOWGeneral ConstructionSigned-offKing Rose of NY11/09/2023
DOB NOWPlumbingSigned-offAccess Plumbing10/06/2023
DOB NOWGeneral ConstructionSigned-offKing Rose of NY09/07/2023
DOB NOWPlumbingSigned-offAce-Atlas Plbing & Heating12/12/2022
DOB NOWMechanical SystemsPermit IssuedUnique Mechanical11/26/2022
DOB NOWBoiler EquipmentSigned-offAce-Atlas Plumbing & Heating11/04/2022
DOB NOWBoiler EquipmentSigned-offAce-Atlas Plumbing & Heating11/03/2022
DOB NOWBoiler EquipmentSigned-offAce Atlas09/13/2022
DOB NOWMechanical SystemsSigned-offGuaranteed Home Improveme06/08/2022
DOB NOWAntennaSigned-offWatch Hill Wireless Solu05/17/2022
DOB NOWBoiler EquipmentSigned-offAce Atlas02/18/2022
DOB NOWPlumbingSigned-offAce-Atlas Plbing & Heating02/16/2022
DOB NOWGeneral ConstructionSigned-offYates Restoration Group10/27/2021
BISOTISSUEDSquan Construction Services10/05/2016
BISOTISSUEDSquan Construction Services12/26/2015
BISSPISSUEDG.bassolino Plumbing03/18/2011
BISPLISSUEDG.bassolino Plumbing07/29/2010
BISPLISSUEDG.bassolino Plumbing12/04/2008
BISOTISSUEDDsa Services08/22/2007
BISMHISSUEDRand Engineering05/30/2007
BISOTISSUEDBci Communications02/28/2007
BISFSRE-ISSUEDG.bassolino Plumbing01/30/2006
BISPLISSUEDG.bassolino Plumbing01/30/2006
BISOTISSUEDC C Controlled Combustion01/26/2006
BISOTISSUEDInsite Communication of03/14/2003
BISFPISSUEDGebhardt01/24/2003
BISOTISSUEDUpgrade Contracting Co03/23/2001
BISEQISSUEDNew Century Construction01/31/2001
BISOTISSUEDUpgrade Contracting Co09/14/2000
BISEQISSUEDNew Century Construction08/02/2000
BISOTISSUEDApplied Electric04/16/1998
BISSPISSUEDAmok07/02/1997
BIS—ISSUEDEquity Homes07/10/1992
4 projects · most recent 07/02/2025
General Wiring
FiledStatusContractorScope
07/02/2025Permit IssuedSNB Electrical ContngGeneral Wiring
08/29/2024CompleteR. Donovan & Son Electric—
10/31/2023Permit IssuedMartin DorkinGeneral Wiring
05/25/2022CompleteR. Donovan & Son ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
05/13/2024Fail-Final PL - Up to 9 Requested FloorsFailView ↗
03/26/2024Fail-Final PL - Up to 9 Requested FloorsFailView ↗
03/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/01/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/01/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/27/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/05/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 69
DateRequirementInspectorRole
04/30/2024HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
04/30/2024Tenant Protection Plan ComplianceJOHN MCMONAGLEspecial
04/30/2024Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
04/04/2024HVAC-R and service water piping design and insulationMAURICIO ANDRADEenergy_progress
04/04/2024Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
04/04/2024HVAC-R and service water piping design and insulationMAURICIO ANDRADEenergy_progress
04/04/2024Tenant Protection Plan Compliance—special
02/06/2024Energy Code Compliance InspectionsMAURICIO ANDRADEprogress
02/06/2024HVAC-R and service water piping design and insulationMAURICIO ANDRADEenergy_progress
02/06/2024Tenant Protection Plan Compliance—special
01/04/2024Lighting in dwelling unitsJOHN MCMONAGLEenergy_progress
01/04/2024Fenestration areasJOHN MCMONAGLEenergy_progress
01/04/2024Fenestration air leakageJOHN MCMONAGLEenergy_progress
01/04/2024Fenestration and door U-factor and product ratingsJOHN MCMONAGLEenergy_progress
01/04/2024Air barrier — testing JOHN MCMONAGLEenergy_progress
01/04/2024Structural Stability – Alterations of existing buildingsJOHN MCMONAGLEspecial
01/04/2024Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
01/04/2024Tenant Protection Plan ComplianceJOHN MCMONAGLEspecial
01/04/2024FinalJOHN MCMONAGLEprogress
01/04/2024Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
01/04/2024VestibulesJOHN MCMONAGLEenergy_progress
12/15/2023VestibulesMAURICIO ANDRADEenergy_progress
12/15/2023Fenestration air leakageMAURICIO ANDRADEenergy_progress
12/15/2023Fenestration areasMAURICIO ANDRADEenergy_progress
12/15/2023Fenestration and door U-factor and product ratingsMAURICIO ANDRADEenergy_progress
Latest 25 of 69.
▾Documents — 174 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/27/2026Q00532875-I1Request digital key ↗
08/25/2026Q00670341-P1Request digital key ↗
08/25/2026Q00670341-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION10
01/02/2020402493324Open ↗
11/21/2019402493324Open ↗
11/12/2019421919785Open ↗
Showing 3 of 10 on file for this type
▸BISPLACE OF ASSEMBLY8
11/28/2017421223287Open ↗
11/28/2017421223287Open ↗
11/28/2017421223287Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION2
10/14/2016440240473Open ↗
12/26/2015440240473Open ↗
▸Seals & Professional Certifications70
▸DOB NOWProgress Inspector Seal & Signature27
10/06/2026Q08051077-P3Open ↗
10/05/2026Q00670341-P1Open ↗
10/03/2026Q08051077-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/27/2026Q00532875-I1Open ↗
08/25/2026Q00670341-P1Open ↗
08/25/2026Q00670341-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
10/05/2026Q00670341-P1Open ↗
10/05/2026Q00670341-P1Open ↗
10/03/2026Q08051077-I1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
08/08/2019440240473Open ↗
07/12/2016421223287Open ↗
12/02/2015421223287Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
12/23/2015440240473Open ↗
12/17/2015440240473Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/19/2011420333767Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/19/2011420333767Open ↗
▸Trade Schedules & Equipment7
▸BISSELF-CERT PLUMBING NOTICE4
03/27/2012420333767Open ↗
11/21/2011420333767Open ↗
07/19/2011420333767Open ↗
Showing 3 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
03/27/2012420333767Open ↗
▸BISSCHEDULE B - PLUMBING1
03/19/2011420333767Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
11/09/2023421919785Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
11/14/2018440240473Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/25/2026Q00670341-P1Open ↗
08/25/2026Q00670341-I1Open ↗
08/25/2026Q00649008-S1Open ↗
Showing 3 of 15 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/12/2019421919785Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/19/2011420333767Open ↗
▸Energy Compliance8
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026Q00607556-I1Open ↗
08/13/2026Q00532875-I1Open ↗
08/13/2026Q00649008-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026Q00649008-I1Open ↗
08/13/2026Q00649008-S1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/08/2019440240473Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/08/2019440240473Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/23/2015440240473Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/17/2015440240473Open ↗
▸Approvals, Objections & Sign-offs18
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/25/2026Q00649008-S1Open ↗
08/25/2026Q08050499-P1Open ↗
08/15/2026Q08050499-I1Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
03/21/2017440240473Open ↗
07/12/2016421223287Open ↗
07/12/2016421223287Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
08/08/2019440240473Open ↗
06/16/2016421223287Open ↗
04/14/2016421223287Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
10/15/2015421223287Open ↗
03/19/2011420333767Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
08/08/2019440240473Open ↗
06/12/2019421919785Open ↗
11/14/2018440240473Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION5
07/24/2019440240473Open ↗
11/14/2018440240473Open ↗
11/28/2017421223287Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET2
06/12/2019421919785Open ↗
03/19/2011420333767Open ↗
▸BISBOROUGH INTAKE FORM1
11/14/2018440240473Open ↗