← Back
BuildNYC
Home for indigent children, aged, homeless
21-10 BORDEN AVENUE
QUEENS · BIN 4000526
💬 Discuss this project
1963Year Built
1Stories
N2Building Class
M3-2Zoning
55,000 sfGross Floor Area
0Units
LL97 Covered10 Active Violations 0 unresolved · 10 paperwork only ▸
Home for indigent children, aged, homeless · Owner of record: NYC Department of Homeless Services · 71,000 sf lot · 0.77 FAR built · Flood zone AE
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Floor 11 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Homeless Service903/22/2026
NYC Department of Design and Construction903/21/2026
Human Services Program Unit403/21/2026
ICL303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AG Engineering212/19/2023
Michael Just107/26/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Summit Consulting & Expediting403/21/2026
Just Architecture203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ener-Con Technical ServicesGeneral Contractor303/21/2026
High Volt Electric Corp ofElectrical103/22/2026
Jemco Electric ContractorsElectrical103/21/2026
Magriples JamesElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AG Engineering8899212/19/2023
Hansen Engineering8174107/26/2021
Building Lifecycle
06/09/2026
Boiler inspection report filed
Initial · no defects · Accepted
01/12/2026
Observed not having proper gas appliance shut off valves for cooking equipment and hot water heaters. Vents to hot water heater exhaust and gas…
ECB violation · open
01/12/2026
Failure to maintain building in code-compliant manner. Detected gas leak at boiler room. Located on first floor., repair and/replace
ECB violation · open
01/12/2026
Observed on the ground floor sprinkler head obstructed also no fire stop protection around pipe penetration. Water fountain and waste line going…
ECB violation · open
07/31/2025
Closed: Failure to file 2019 external low pressure inspection
DOB violation · closed on the city's record
72 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Ener-Con Technical Services—
BIS—T.pericic Construction*—
BIS—Plumbing & Heating Doctor—
BIS—T.pericic Construction*—
BIS—JD Masters P & H—
BIS—JD Masters Plumbing & Heating—
BIS—JD Masters P & H—
BIS—FPS Contracting—
BIS—FPS Contracting—
BIS—M. Early Plumbing & Heating—
BIS—M. Early Plumbing & Heating—
BIS—FPS Contracting—
BIS—Beys Contrating—
BIS—Queens the Mechanical Co—
BIS—Beys Contrating—
BIS—Lafata Corallo Plumbing & Heating—
BIS—Lafata Corallo Plumbing & Heating—
BIS—Beys Contrating—
BIS—Lafata Corallo Plumbing & Heating—
BIS—Lafata Corallo Plumbing & Heating—
BIS—Lafata Corallo P & H—
BIS—Lafata Corallo Plumbing & Heating—
BIS—Lafata Corallo Plumbing & Heating—
BIS—Lafata Corallo Plumbing & Heating—
BIS—Lafata Corallo Plumbing & Heating—
BIS—Lafata Corallo Plumbing & Heating—
BIS—Lafata Corallo Plumbing & Heating—
BIS—Lafata-Corallo Plumbing & Heating—
BIS—Lafata Corallo PLG Heating—
BIS—Lafata-Corallo Plumbing & Heating—
BIS—Lafata-Coralla Plumbing & Heating—
BIS—Lafata Corallo Plumbing & Heating—
BIS—Lafata Corallo Plumbing & Heating—
BIS—Lafata Corallo PLG Heating—
BIS—M Maropakis Carpentry—
BIS—C. Pavlou—
Nothing on file for this building.
Nothing on file for this building.
155 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account